| 1-1/2 inch asphalt concrete, surface course, type 1, pg 64-22 (448) | cubic yard | 2 | — | $190.00 | $190.00 – $235.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Maintaining Traffic | ls | 2 | — | $750.00 | $500.00 – $750.00 | Jul 12, 2022, Open bid tab, bidtabshepje2102pdf ↗ |
| Manhole Adjusted To Grade | each | 2 | — | $350.00 | $350.00 – $400.00 | Jul 12, 2022, Open bid tab, bidtabshepje2102pdf ↗ |
| 1-1/2 inch± pavement milling, asphalt concrete | square yard | 2 | — | $3.95 | $3.95 – $8.00 | Jul 12, 2022, Open bid tab, bidtabshepje2102pdf ↗ |
| Tack Coat (Applied At 0.09 Gal./S.Y.) | gallon | 1 | — | $5.00 | $5.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| 18 inch hp conduit, as per plan | linear foot | 1 | — | $50.00 | $50.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| 15 inch hp conduit, as per plan | linear foot | 1 | — | $40.00 | $40.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| 12 inch hp conduit, as per plan | linear foot | 1 | — | $30.00 | $30.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Excavation, Including Embankment Construciton, As Per Plan | cubic yard | 1 | — | $10.00 | $10.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Transverse/diagonal line | linear foot | 1 | — | $11.00 | $11.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Parking lot stall marking | linear foot | 1 | — | $3.50 | $3.50 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Non-Tracking Tack Coat, 0.09 Gal/S.Y. | gallon | 1 | — | $7.00 | $7.00 | Jul 12, 2022, Open bid tab, bidtabshepje2102pdf ↗ |
| Type 2-3 Catch Basin | each | 1 | — | $1,500 | $1,500 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Type 1A Catch Basin, As Per Plan | each | 1 | — | $2,500 | $2,500 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| 2-1/2 inch asphalt concrete intermediate course, type 2, (448) | cubic yard | 1 | — | $180.00 | $180.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Type 2-2B Catch Basin, As Per Plan | each | 1 | — | $1,200 | $1,200 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| 1-1/2 inch asphalt concrete surface course, type 1, pg 64-22 | cubic yard | 1 | — | $226.00 | $226.00 | Jul 12, 2022, Open bid tab, bidtabshepje2102pdf ↗ |
| Catch Basin Adjusted To Grade | each | 1 | — | $1,250 | $1,250 | Jul 12, 2022, Open bid tab, bidtabshepje2102pdf ↗ |
| Remove of ground mounted post support and disposal | each | 1 | — | $32.00 | $32.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Remove of ground mounted sign and disposal | each | 1 | — | $22.00 | $22.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Sign, Flat Sheet | square foot | 1 | — | $34.00 | $34.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Sign, Double Faced, Street Name | each | 1 | — | $170.00 | $170.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 1 | — | $1.00 | $1.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 1 | — | $1.00 | $1.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 1 | — | $5.00 | $5.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Construction Layout Stakes And Surveying, As Per Plan | ls | 1 | — | $2,000 | $2,000 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| 4 inch conduit, type b, 707.45, as per plan | linear foot | 1 | — | $20.00 | $20.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Tack Coat, 0.06 Gal/S.Y. | gallon | 1 | — | $4.00 | $4.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 1 | — | $500.00 | $500.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Ground Mounted Support, No. 3 Post | linear foot | 1 | — | $21.00 | $21.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Type 1 Catch Basin, As Per Plan | each | 1 | — | $1,600 | $1,600 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Combination Curb And Gutter, Type 2, As Per Plan | linear foot | 1 | — | $26.00 | $26.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Curb Ramp, As Per Plan | square foot | 1 | — | $11.00 | $11.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| 6 Inch Concrete Walk, As Per Plan | square foot | 1 | — | $9.00 | $9.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| 4 inch concrete walk, as per plan | square foot | 1 | — | $8.00 | $8.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Stabilized Crushed Aggregate | cubic yard | 1 | — | $40.00 | $40.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 1 | — | $130.00 | $130.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Subgrade Compaction, As Per Plan | square yard | 1 | — | $1.00 | $1.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Walk Removed | square foot | 1 | — | $4.00 | $4.00 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |
| Removed, As Per Plan | ls | 1 | — | $1,500 | $1,500 | Jan 28, 2021, Open bid tab, bidtabshepje1802pdf ↗ |