Village of Pandora: awarded unit prices

20 winning bid prices read from 1 source documents, 2019. The table lists the 20 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Village of Pandora

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Existing Lift Station Abandonmentls1—$2,500$2,500Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
Conduit, 3 inch, 725.04linear foot1—$20.00$20.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
15 inch sanitary sewer, 707.45, as per planlinear foot1—$140.00$140.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
12 inch sanitary sewer, 707.45, as per planlinear foot1—$75.00$75.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
10 inch sanitary sewer, 707.45, as per planlinear foot1—$120.00$120.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
8 inch c-900 dr-18 forcemain, as per planlinear foot1—$80.00$80.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
Embankment Construction, As Per Plancubic yard1—$18.00$18.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
Lift Stationls1—$198,248$198,248Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
9 inch non-reinforced concrete pavementsquare yard1—$96.00$96.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
2-1/2 inch asphalt concrete intermediate course, type 2, (448)cubic yard1—$340.00$340.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
Type 3 Sanitary Sewer Manhole, As Per Planeach1—$7,000$7,000Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
1-1/2 inch asphalt concrete surface course, type 1, pg 64-22cubic yard1—$380.00$380.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
Fill And Plug Existing Conduitlinear foot1—$10.00$10.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
Seeding And Mulching, Class 1, As Per Plansquare yard1—$1.50$1.50Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
Construction Layout Stakes And Surveying, As Per Planls1—$1,250$1,250Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
Subgrade Compactionsquare yard1—$3.00$3.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
Maintaining Trafficls1—$300.00$300.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
Removed, As Per Planls1—$2,000$2,000Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
Aggregate Basecubic yard1—$63.00$63.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗
Rock Excavationcubic yard1—$175.00$175.00Dec 5, 2019, Open bid tab, bidtabputpan1801pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.