Skip to content
Hubstake

Agency · awarded bid prices

Village of Ottoville: awarded unit prices

74 winning bid prices read from 2 source documents, 2019–2020. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Village of Ottoville

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Water works, misc.: 8 inch water main relocation, as per planlinear foot2—$184.36$134.00 – $184.36Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Type 2-2B Catch Basin, As Per Plan Each2—$1,035$1,035 – $1,100Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Water works, misc.: 8 inch water main reconnected, as per planeach2—$314.31$314.31 – $2,100Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Water Works, Misc.: Water Service Line Relocated, As Per Planlinear foot2—$20.48$20.48 – $45.00Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
15 inch cpslp storm sewer, as per planlinear foot2—$37.82$37.82 – $60.00Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
24 inch cpslp storm sewer, as per planlinear foot2—$47.86$47.86 – $69.00Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
18 inch cpslp storm sewer, as per planlinear foot2—$45.29$45.29 – $56.00Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
12 inch cpslp storm sewer, as per planlinear foot2—$32.52$32.52 – $60.00Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Storm Sewer Manhole, No. 3, As Per Planeach2—$2,792$2,792 – $3,825Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
8 inch conduit, type b, 707.45, storm repair, as per planlinear foot2—$8.90$8.90 – $32.00Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
6 inch conduit, type b, 707.45, storm repair, as per planlinear foot2—$6.68$6.68 – $28.00Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
4 inch conduit, type b, 707.45, storm repair, as per planlinear foot2—$5.56$5.56 – $20.00Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Seeding And Mulching, Class 1, As Per Plansquare yard2—$1.70$1.70 – $2.50Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Clearing And Grubbing, As Per Planls2—$890.17$890.17 – $6,000Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Maintaining Trafficls2—$1,564$1,564 – $18,280Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Non-Tracking Tack Coat, 0.06 Gal/S.Y.gallon2—$3.34$3.34 – $4.75Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Removed, As Per Planls2—$6,826$6,826 – $17,500Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Aggregate Basecubic yard2—$36.31$36.31 – $38.50Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
8' Temporary Line Stop, As Per Planeach1—$3,894$3,894Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Water works, misc.: 6 inch water main relocation, as per planlinear foot1—$163.00$163.00Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
6 inch pvc sdr-35 sanitary sewer laterals, as per planlinear foot1—$25.55$25.55Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Type 2-3 Catch Basin, As Per Plan Each1—$1,494$1,494Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Modified Type 2-2B Catch Basin, As Per Plan Each1—$4,880$4,880Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
6 inch sdr-35, type b, storm lateralslinear foot1—$83.51$83.51Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
6 inch sdr-35, type b, storm laterals with cleanout, as per planlinear foot1—$44.62$44.62Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Asphalt Concrete, Surface Course, Type 1, (448), Pg. 64-22 (Driveway)cubic yard1—$472.90$472.90Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
Line Stop Tee Or Inserting Valve , As Per Planeach1—$8,825$8,825Nov 20, 2019, Open bid tab, bidtabputott1703pdf ↗
4 inch c-900 dr-18 water main, as per planlinear foot1—$49.00$49.00Nov 20, 2019, Open bid tab, bidtabputott1703pdf ↗
4 inch pvc sdr-35 sanitary sewer laterals, as per planlinear foot1—$64.00$64.00Nov 20, 2019, Open bid tab, bidtabputott1703pdf ↗
6 inch sdr-35, type b, storm laterals, as per planlinear foot1—$89.00$89.00Nov 20, 2019, Open bid tab, bidtabputott1703pdf ↗
48 inch reinforced concrete pipe class-iii storm sewer, as per planlinear foot1—$172.00$172.00Nov 20, 2019, Open bid tab, bidtabputott1703pdf ↗
42 inch cpslp storm sewer, as per planlinear foot1—$96.00$96.00Nov 20, 2019, Open bid tab, bidtabputott1703pdf ↗
36 inch cpslp storm sewer, as per planlinear foot1—$83.00$83.00Nov 20, 2019, Open bid tab, bidtabputott1703pdf ↗
30 inch cpslp storm sewer, as pre planlinear foot1—$250.00$250.00Nov 20, 2019, Open bid tab, bidtabputott1703pdf ↗
Tied Concrete Block Mat, Type 3 (Flexamat)square yard1—$12.00$12.00Nov 20, 2019, Open bid tab, bidtabputott1703pdf ↗
Concrete Walksquare foot1—$6.68$6.68Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
10 inch conduit, type b, 707.45, storm repair, as per planlinear foot1—$26.00$26.00Nov 20, 2019, Open bid tab, bidtabputott1703pdf ↗
8 inch pvc sdr-35 storm sewer, as per planlinear foot1—$30.81$30.81Dec 21, 2020, Open bid tab, bidtabputott1803pdf ↗
8 inchx4 inch tapping sleeve and valveeach1—$3,225$3,225Nov 20, 2019, Open bid tab, bidtabputott1703pdf ↗
3 inch asphalt concrete base, pg. 64-22cubic yard1—$205.00$205.00Nov 20, 2019, Open bid tab, bidtabputott1703pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Ohio: statewide figures.