ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Asphalt Concrete Surface Course, Type 1, (448), Pg64-22, As Per Plancubic yard2—$220.00$220.00 – $245.00May 30, 2025, Open bid tab, 0000031849 ↗
Partial deep pavement repair, as per plansquare yard2—$40.00$30.00 – $40.00May 30, 2025, Open bid tab, 0000031849 ↗
Contingency/Discretionary Allowancels2—$15,000$5,000 – $15,000May 30, 2025, Open bid tab, 0000031849 ↗
Bonds And Insurances, As Per Planls2—$2,000$500.00 – $2,000May 30, 2025, Open bid tab, 0000031849 ↗
Preconstruction Video Documentationls2—$525.00$525.00 – $550.00May 30, 2025, Open bid tab, 0000031849 ↗
Non-Tracking Tack Coat, As Per Plangallon2—$2.00$2.00 – $2.75May 30, 2025, Open bid tab, 0000031849 ↗
Mobilizationls2—$8,000$8,000 – $9,720May 30, 2025, Open bid tab, 0000031849 ↗
Shoulder Preparation, As Per Plansquare yard1—$3.00$3.00May 30, 2025, Open bid tab, 0000031849 ↗
Asphalt Concrete Intermediate Course, Type 2, (448), As Per Plancubic yard1—$205.00$205.00May 30, 2025, Open bid tab, 0000031849 ↗
Special - Erosion And Sediment Controlls1—$250.00$250.00Sep 1, 2023, Open bid tab, 231801 ↗
Asphalt Concrete Intermediate Course, Type 1, (448), As Per Plancubic yard1—$225.00$225.00Sep 1, 2023, Open bid tab, 231801 ↗
Pavement milling, asphalt concrete, as per plansquare yard1—$3.00$3.00May 30, 2025, Open bid tab, 0000031849 ↗
Type "f" pavement replace (stone), driveway, apron, or parking lot, as per plansquare yard1—$50.00$50.00May 30, 2025, Open bid tab, 0000031849 ↗
Temporary Sediment And Erosion Control, As Per Planls1—$1,000$1,000May 30, 2025, Open bid tab, 0000031849 ↗
Pavement Repair, As Per Plansquare yard1—$115.00$115.00May 30, 2025, Open bid tab, 0000031849 ↗
Compaction aggregate, as per plancubic yard1—$75.00$75.00May 30, 2025, Open bid tab, 0000031849 ↗
Maintaining Traffic, As Per Planls1—$8,000$8,000May 30, 2025, Open bid tab, 0000031849 ↗
Valve Box Adjusted To Gradeeach1—$800.00$800.00May 30, 2025, Open bid tab, 0000031849 ↗
Manhole Adjusted To Gradeeach1—$1,100$1,100May 30, 2025, Open bid tab, 0000031849 ↗