| 12 Inch Cutting-In Sleeve | each | 1 | — | $2,200 | $2,200 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 8 Inch Cutting-In Sleeve | each | 1 | — | $2,000 | $2,000 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 6 Inch Cutting-In Sleeve | each | 1 | — | $2,950 | $2,950 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 4 Inch Cutting-In Sleeve | each | 1 | — | $2,800 | $2,800 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 2 Inch Cutting-In Sleeve | each | 1 | — | $1,000 | $1,000 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 36 Inch Steel Pipe Encasement, Bored Or Jacked | linear foot | 1 | — | $615.00 | $615.00 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Lead line replace - 3/4 inch copper service branch (short), as per plan | each | 1 | — | $1,900 | $1,900 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Lead line replace - 3/4 inch copper service branch (long), pushed, drilled, or bored, | each | 1 | — | $2,400 | $2,400 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 2 Inch Copper Service Branch, As Per Plan | each | 1 | — | $3,950 | $3,950 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 1-1/2 Inch Copper Service Branch, As Per Plan | each | 1 | — | $3,100 | $3,100 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 3/4 Inch Copper Service Branch (Long), Pushed, Drilled, Or Bored, As Per Plan | each | 1 | — | $2,800 | $2,800 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 16 Inch Water Main, As Per Plan | linear foot | 1 | — | $130.00 | $130.00 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Asphalt Concrete, Misc.: Additional Paving Outside Of Trench Limits, As Directed | square yard | 1 | — | $150.00 | $150.00 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Rock Excavation, Contingency, As Directd | cubic yard | 1 | — | $150.00 | $150.00 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 3/4 Inch Copper Service Branch (Short), As Per Plan | each | 1 | — | $2,325 | $2,325 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Catch Basin, No. 6, As Per Plan | each | 1 | — | $2,000 | $2,000 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Private lead service (or galvanized following owner's lsl) line replace (beyond 50 | linear foot | 1 | — | $18.00 | $18.00 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Private lead service (or galvanized following owner's lsl) line replace (50' or less) | each | 1 | — | $850.00 | $850.00 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Full deep pavement remove and rigid replace, class qc ms, t=8 inch, as per plan | square yard | 1 | — | $145.00 | $145.00 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 12 Inch Water Main, As Per Plan | linear foot | 1 | — | $164.00 | $164.00 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 1 Inch Copper Service Branch, As Per Plan | each | 1 | — | $2,800 | $2,800 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Special - Erosion And Sediment Control | ls | 1 | — | $5,000 | $5,000 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 8 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $2,250 | $2,250 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Fire Hydrant Removed For Storage, As Per Plan | each | 1 | — | $700.00 | $700.00 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 6 Inch Fire Hydrant Assembly, Including 6 Inch Valve And Valve Box, As Per Plan | each | 1 | — | $8,400 | $8,400 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 12 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $3,750 | $3,750 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Bonds And Insurances, As Per Plan | ls | 1 | — | $35,000 | $35,000 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Preconstruction Video Documentation | ls | 1 | — | $1,700 | $1,700 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 6 Inch Water Main, As Per Plan | linear foot | 1 | — | $130.00 | $130.00 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 16 Inch Gate Valve AND Valve BOX | each | 1 | — | $10,500 | $10,500 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 8 Inch Water Main, As Per Plan | linear foot | 1 | — | $127.00 | $127.00 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| 4 Inch Water Main, As Per Plan | linear foot | 1 | — | $125.00 | $125.00 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Maintaining Traffic, As Per Plan | ls | 1 | — | $20,000 | $20,000 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Construction Layout Stakes And Surveying | ls | 1 | — | $22,000 | $22,000 | Feb 16, 2023, Open bid tab, 210414 ↗ |
| Mobilization | ls | 1 | — | $54,000 | $54,000 | Feb 16, 2023, Open bid tab, 210414 ↗ |