| 22 Inch Steel Pipe Encasement, Open Cut | linear foot | 1 | — | $177.68 | $177.68 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| 14 Inch Steel Pipe Encasement, Open Cut | linear foot | 1 | — | $153.06 | $153.06 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| 1.25 Inch Force Main, As Per Plan | linear foot | 1 | — | $38.00 | $38.00 | Feb 7, 2025, Open bid tab, 220865 ↗ |
| Force Main Clean Outs, As Per Plan | each | 1 | — | $1,750 | $1,750 | Feb 7, 2025, Open bid tab, 220865 ↗ |
| Grinder Pump Station Station - Single, As Per Plan | each | 1 | — | $16,700 | $16,700 | Feb 7, 2025, Open bid tab, 220865 ↗ |
| 2 Inch Conduit, Horizontal Directional Drilling Without Casing, As Per Plan | linear foot | 1 | — | $25.50 | $25.50 | Feb 7, 2025, Open bid tab, 220865 ↗ |
| 12 Inch Gate Valve AND Valve BOX | each | 1 | — | $3,455 | $3,455 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| 12 inch water main polyvinyl chloride pipe and fitting, awwa c900 pvc | linear foot | 1 | — | $131.22 | $131.22 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| 2 Inch Force Main, As Per Plan | linear foot | 1 | — | $32.00 | $32.00 | Feb 7, 2025, Open bid tab, 220865 ↗ |
| 8 inch water main ductile iron pipe ansi class 52, mechanical joint and fitting | linear foot | 1 | — | $140.78 | $140.78 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| Bonds And Insurances, As Per Plan | ls | 1 | — | $14,000 | $14,000 | Feb 7, 2025, Open bid tab, 220865 ↗ |
| Preconstruction Video Documentation | ls | 1 | — | $3,500 | $3,500 | Feb 7, 2025, Open bid tab, 220865 ↗ |
| Seeding And Mulching | ls | 1 | — | $2,000 | $2,000 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| _ Forcemain, Air Release Valve | each | 1 | — | $10,000 | $10,000 | Feb 7, 2025, Open bid tab, 220865 ↗ |
| Pipe Removed | linear foot | 1 | — | $21.15 | $21.15 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| Pavement For Maintaining Traffic, Class B | square yard | 1 | — | $175.00 | $175.00 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| Pavement Repair | square yard | 1 | — | $162.16 | $162.16 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| Construction Layout Stakes And Surveying | ls | 1 | — | $2,260 | $2,260 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| 8 Inch Gate Valve and Valve Box | each | 1 | — | $2,798 | $2,798 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| Erosion Control | each | 1 | — | $1.00 | $1.00 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| Maintaining Traffic | ls | 1 | — | $9,360 | $9,360 | Jul 23, 2020, Open bid tab, 200247 ↗ |
| Mobilization | ls | 1 | — | $3,000 | $3,000 | Jul 23, 2020, Open bid tab, 200247 ↗ |