1-1/2 inch asphalt concrete intermediate course, type 2, (449)cubic yard1—$500.00$500.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
9 inch asphalt concrete base, pg64-22cubic yard1—$300.00$300.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
1-1/2 inch asphalt concrete surface course, type 1, (449), pg64-22cubic yard1—$500.00$500.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Curb, Type 6, As Per Planlinear foot1—$40.00$40.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Pipe removed, 24 inch and underlinear foot1—$10.00$10.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Construction Layout Stakes And Surveying, As Per Planls1—$1,300$1,300Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
4 inch concrete walksquare foot1—$10.00$10.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Seeding And Mulching, As Per Plansquare yard1—$5.00$5.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
8 inch conduit, type b, 707.45, storm repairlinear foot1—$20.00$20.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
6 inch conduit, type b, 707.45, storm repairlinear foot1—$15.00$15.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
4 inch conduit, type b, 707.45, storm repairlinear foot1—$10.00$10.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Clearing And Grubbing, As Per Planls1—$1,000$1,000Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Valve Box Adjusted To Gradeeach1—$100.00$100.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Remove of ground mounted sign and reerectioneach1—$100.00$100.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Maintaining Trafficls1—$1,000$1,000Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Curb Ramp, As Per Plansquare foot1—$30.00$30.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Stabilized Crushed Aggregatecubic yard1—$100.00$100.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Non-Tracking Tack Coat, 0.06 Gal/S.Y.gallon1—$10.00$10.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Aggregate Base, As Per Plancubic yard1—$80.00$80.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Subgrade Compaction, As Per Plansquare yard1—$5.00$5.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Excavation, Including Embankment Construction, As Per Plancubic yard1—$50.00$50.00Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗
Removed, As Per Planls1—$1,000$1,000Mar 12, 2025, Open bid tab, bidtabclenri2202pdf ↗