Village of New Lebanon: awarded unit prices

400 winning bid prices read from 12 source documents, 2021–2025. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Village of New Lebanon

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Construction Contingency Allowance, As Per Planls6$20,000$16,000$15,000 – $25,000Oct 26, 2023, Open bid tab, bidtabmotnle2202pdf ↗
1-3/4 inch asphalt concrete intermediate course, type 2, (449)cubic yard6$271.50$273.00$212.94 – $294.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Maintaining Trafficls6$2,450$2,500$1,750 – $10,000Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Subgrade Compaction, As Per Plansquare yard6$1.00$1.00$0.5 – $1.50Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Walk Removedsquare foot6$1.40$3.00$1.00 – $3.50Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
8 inch awwa c-900 dr-18 water main, as per planlinear foot5$86.00$78.00$66.00 – $118.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Meter pit, including meter, setting, and valve, as per planeach5$1,090$1,297$800.00 – $1,297Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Valve Box Removedeach5$176.00$219.00$100.00 – $300.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Curb Rampsquare foot5$12.00$12.00$9.50 – $21.00Feb 29, 2024, Open bid tab, bidtabmotnle2203pdf ↗
Clearing And Grubbing, As Per Planls5$1,200$1,087$1,000 – $20,000Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Stabilized Crushed Aggregatecubic yard5$75.00$15.00$15.00 – $125.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Removed, As Per Planls5—$7,875$500.00 – $7,875Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Sanitary Manhole Reconstructed To Gradeeach4—$2,389$940.00 – $2,389Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Cut And Plug, Type 2, As Per Planeach4—$1,543$900.00 – $2,246Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Remove of ground mounted sign and disposaleach4—$312.00$10.00 – $312.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Sign, Flat Sheetsquare foot4—$50.00$12.00 – $50.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Sign, Double Faced, Street Nameeach4—$508.00$100.00 – $508.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
4 inch asphalt concrete base, pg64-22cubic yard4—$258.00$170.00 – $258.00Feb 29, 2024, Open bid tab, bidtabmotnle2203pdf ↗
Catch Basin Removedeach4—$600.00$275.00 – $600.00Feb 29, 2024, Open bid tab, bidtabmotnle2203pdf ↗
Pipe removed, 24 inch and underlinear foot4—$18.00$12.00 – $47.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Seeding And Mulching, Class 1, As Per Plansquare yard4—$7.00$3.50 – $7.00Feb 29, 2024, Open bid tab, bidtabmotnle2203pdf ↗
Fire Hydrant Assembly Removedeach4—$500.00$300.00 – $900.00Feb 29, 2024, Open bid tab, bidtabmotnle2203pdf ↗
Erosion Controleach4—$1.00$0.01 – $1.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
6 inch fire hydrant assembly, as per planeach4—$9,400$5,000 – $10,100Feb 29, 2024, Open bid tab, bidtabmotnle2203pdf ↗
Curb Removedlinear foot4—$5.00$3.00 – $6.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Stop Linelinear foot4—$180.00$30.00 – $180.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Ground Mounted Support, No. 3 Postlinear foot4—$46.00$14.00 – $46.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
Manhole Adjusted To Gradeeach4—$704.42$400.00 – $1,557Jun 23, 2023, Open bid tab, bidtabmotnle2302pdf ↗
12 inch conduit, type b, as per planlinear foot4—$65.00$52.75 – $73.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
4 inch concrete walk, as per plansquare foot4—$9.50$6.00 – $9.50Feb 29, 2024, Open bid tab, bidtabmotnle2203pdf ↗
Aggregate Base, As Per Plancubic yard4—$79.00$45.35 – $79.00Feb 29, 2024, Open bid tab, bidtabmotnle2203pdf ↗
Excavation, Including Embankment Construction, As Per Plancubic yard4—$16.00$16.00 – $40.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
8 inch gate valveeach4—$3,055$1,200 – $3,055Feb 29, 2024, Open bid tab, bidtabmotnle2203pdf ↗
6 inch sanitary sewer lateral repairlinear foot3—$1.00$1.00 – $31.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
8 inch sanitary sewer pipeline rehabilitation, as per planlinear foot3—$45.50$23.75 – $45.50Oct 2, 2024, Open bid tab, bidtabmotnle2303pdf ↗
1-1/4 inch asphalt concrete surface course, type 1, (449), pg64-22cubic yard3—$294.00$270.00 – $294.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
1 inch type "k" copper water service branch, as per planlinear foot3—$140.00$53.00 – $140.00Dec 14, 2022, Open bid tab, bidtabmotnle2002pdf ↗
Remove of ground mounted post support and disposaleach3—$50.00$16.00 – $50.00Dec 14, 2022, Open bid tab, bidtabmotnle2002pdf ↗
Storm Sewer Manhole, No. 3, As Per Planeach3—$4,800$2,600 – $4,800Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗
18 inch conduit, type b, as per planlinear foot3—$78.00$78.00 – $98.00Mar 5, 2025, Open bid tab, bidtabmotnle2304pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.