Village of New Knoxville: awarded unit prices

201 winning bid prices read from 6 source documents, 2020–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Village of New Knoxville

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Maintaining Trafficls6$5,760$5,782$1,642 – $10,000Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
Removed, As Per Planls6$7,257$9,033$1,454 – $15,000Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
Seeding And Mulching, Class 1, As Per Plansquare yard5$10.00$19.20$4.08 – $19.20Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
Asphalt Rejuvenating Agentsquare yard4—$1.87$1.75 – $1.97Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
Excavation, Including Embankment, As Per Plancubic yard4—$63.63$14.44 – $63.63Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
1 inch water service branch, as per planlinear foot4—$114.86$49.29 – $114.86Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
Subgrade Compactionsquare yard4—$1.13$0.64 – $1.50Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
Remove of ground mounted sign and reerectioneach4—$84.68$48.70 – $165.00Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
Aggregate Base, As Per Plancubic yard4—$48.43$34.00 – $54.42Nov 5, 2025, Open bid tab, bidtabaugnkn24011pdf ↗
2-1/2 inch asphalt concrete intermediate course, type 2, (449)cubic yard3—$451.65$235.00 – $1,217Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
Non-Tracking Tack Coatgallon3—$6.00$6.00 – $7.69Jun 11, 2024, Open bid tab, bidtabaugnkn2304pdf ↗
Catch Basin Removedeach3—$225.85$225.85 – $350.00Nov 5, 2025, Open bid tab, bidtabaugnkn24011pdf ↗
Pipe removed, 24 inch and underlinear foot3—$5.65$5.65 – $20.80Nov 5, 2025, Open bid tab, bidtabaugnkn24011pdf ↗
8 inch conduit, type b, 707.45, storm repair, as per planlinear foot3—$45.20$20.01 – $45.20Jun 11, 2024, Open bid tab, bidtabaugnkn2304pdf ↗
6 inch conduit, type b, 707.45, storm repair, as per planlinear foot3—$34.40$17.26 – $34.40Jun 11, 2024, Open bid tab, bidtabaugnkn2304pdf ↗
4 inch conduit, type b, 707.45, storm repair, as per planlinear foot3—$23.20$15.12 – $23.87Jun 11, 2024, Open bid tab, bidtabaugnkn2304pdf ↗
4 inch concrete walksquare foot3—$6.58$6.19 – $15.43Nov 5, 2025, Open bid tab, bidtabaugnkn24011pdf ↗
Erosion Controleach3—$1.00$1.00Nov 5, 2025, Open bid tab, bidtabaugnkn24011pdf ↗
Remove of ground mounted post support and reerectioneach3—$84.68$71.10 – $112.92Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
8 inch conduit, type b, 707.45, storm repairlinear foot3—$19.20$18.37 – $28.50Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
6 inch conduit, type b, 707.45, storm repairlinear foot3—$13.55$11.08 – $19.25Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
4 inch conduit, type b, 707.45, storm repairlinear foot3—$9.03$5.19 – $12.75Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
Stabilized Crushed Aggregatecubic yard3—$164.84$98.52 – $222.80Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
1-1/2 inch± pavement milling, asphalt concretesquare yard3—$3.11$3.11 – $8.25Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
Excavation Of Subgrade, As Per Plancubic yard3—$47.49$47.49 – $64.39Nov 5, 2025, Open bid tab, bidtabaugnkn24011pdf ↗
Geogridsquare yard3—$4.13$4.13 – $9.19Nov 5, 2025, Open bid tab, bidtabaugnkn24011pdf ↗
Edge Linemile2—$8,250$8,250 – $14,767Dec 13, 2022, Open bid tab, bidtabaugnkn2103pdf ↗
6 inch storm sewer lateral, as per planlinear foot2—$100.00$54.52 – $100.00Dec 13, 2022, Open bid tab, bidtabaugnkn2103pdf ↗
12 inch cpslp storm sewer, as per planlinear foot2—$89.30$48.28 – $89.30Jun 11, 2024, Open bid tab, bidtabaugnkn2304pdf ↗
Fire Hydrant Extended And Adjusted To Gradeeach2—$3,887$1,750 – $3,887Nov 5, 2025, Open bid tab, bidtabaugnkn24011pdf ↗
Yard Drain, As Per Planeach2—$1,328$1,168 – $1,328Nov 5, 2025, Open bid tab, bidtabaugnkn24011pdf ↗
Type 2-2B Catch Basin, As Per Planeach2—$2,405$1,773 – $2,405Jun 11, 2024, Open bid tab, bidtabaugnkn2304pdf ↗
1-1/2 inch asphalt concrete surface course, type 1, pg 64-22, (449)cubic yard2—$305.10$258.00 – $305.10Jun 11, 2024, Open bid tab, bidtabaugnkn2304pdf ↗
Curb Replaced (In-Kind)linear foot2—$60.40$40.44 – $60.40Jun 11, 2024, Open bid tab, bidtabaugnkn2304pdf ↗
Curb Removedlinear foot2—$8.00$4.05 – $8.00Jun 11, 2024, Open bid tab, bidtabaugnkn2304pdf ↗
6 inch non-reinforced concrete pavementsquare yard2—$100.00$98.40 – $100.00Dec 13, 2022, Open bid tab, bidtabaugnkn2103pdf ↗
Clearing And Grubbing, As Per Planls2—$2,033$888.98 – $2,033Nov 5, 2025, Open bid tab, bidtabaugnkn24011pdf ↗
Center Linemile2—$16,500$16,500 – $29,534Dec 13, 2022, Open bid tab, bidtabaugnkn2103pdf ↗
Valve Box Adjusted To Gradeeach2—$141.14$141.14 – $158.09Jul 9, 2026, Open bid tab, bidtabaugnkn2503pdf ↗
Manhole Adjusted To Gradeeach2—$1,833$825.00 – $1,833Nov 5, 2025, Open bid tab, bidtabaugnkn24011pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.