ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Erosion Controleach10$1.00$1.00$1.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Maintaining Trafficls10$9,000$1,604$1,604 – $28,983Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Removed, As Per Planls9$5,000$9,000$1,497 – $39,845Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Stabilized Crushed Aggregatecubic yard8$65.00$52.00$36.00 – $168.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Aggregate Base, As Per Plancubic yard8$42.91$46.50$30.20 – $57.65Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Subgrade Compaction, As Per Plansquare yard8$1.00$0.5$0.44 – $5.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Non-Tracking Tack Coatgallon7$4.50$4.50$3.89 – $7.27Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Curb Ramp, As Per Plansquare foot7$15.00$19.50$11.00 – $20.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
4 inch concrete walk, as per plansquare foot7$9.00$11.00$5.50 – $12.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Walk Removedsquare foot7$1.50$4.00$1.00 – $10.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
12 inch cpslp storm sewer, as per planlinear foot6$60.50$51.00$29.00 – $85.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Pipe removed, 24 inch and underlinear foot6$23.38$21.50$8.00 – $52.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
6 inch fire hydrant assembly, as per planeach6$8,100$6,140$5,000 – $10,500Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
9 inch non-reinforced concrete pavement, as per plansquare yard5$115.00$135.00$84.00 – $135.00Jun 11, 2025, Open bid tab, bidtabaugmin2407pdf ↗
8 inch conduit, type b, 707.45, storm repairlinear foot5$19.62$21.00$8.00 – $27.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
6 inch conduit, type b, 707.45, storm repairlinear foot5$11.67$15.50$6.00 – $22.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
4 inch conduit, type b, 707.45, storm repairlinear foot5$6.00$11.00$4.00 – $20.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Valve Box Adjusted To Gradeeach5$750.00$750.00$167.55 – $750.00Dec 21, 2023, Open bid tab, bidtabaugmin2303pdf ↗
Excavation, Including Embankment Construction, As Per Plancubic yard5$19.00$19.00$13.50 – $25.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Curb And Gutter Removedlinear foot5$6.00$6.00$3.00 – $20.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
8 inch gate valveeach5$2,350$2,783$1,500 – $2,783Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Type 3 Storm Manhole, As Per Planeach4—$4,000$2,870 – $5,000Apr 9, 2026, Open bid tab, bidtabaugmin2506pdf ↗
Combination curb and gutter, type 2, 6 inch plate, as per planlinear foot4—$28.00$19.00 – $28.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Asphalt Concrete Intermediate Course, Type 2, (449)cubic yard4—$241.00$234.00 – $650.00Apr 9, 2026, Open bid tab, bidtabaugmin2506pdf ↗
Asphalt Concrete Surface Course, Type 1, (449), Pg64-22cubic yard4—$235.00$235.00 – $585.00Apr 9, 2026, Open bid tab, bidtabaugmin2506pdf ↗
Excavation of subgrade and structure embankment, as per plancubic yard4—$35.05$35.00 – $55.00Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗
Catch Basin Removedeach4—$667.00$165.69 – $667.00Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
1 inch water service branch, as per planlinear foot4—$50.00$50.00 – $72.33Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Clearing And Grubbing, As Per Planls4—$724.00$724.00 – $51,000Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗
Type 1 Catch Basin, As Per Planeach4—$2,260$1,200 – $2,500Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗
Fire Hydrant Extended And Adjusted To Gradeeach3—$2,600$1,000 – $2,938Dec 21, 2023, Open bid tab, bidtabaugmin2303pdf ↗
18 inch storm sewer, cpslp, as per planlinear foot3—$78.39$62.00 – $125.00Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗
6 inch conduit, type b, 707.45, storm lateral, as per planlinear foot3—$56.84$44.00 – $56.84Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗
Manhole Adjusted To Grade, As Per Planeach3—$1,080$1,080 – $1,125Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗
6 inch sanitary sewer lateral, as per planlinear foot3—$123.00$58.72 – $123.00Jun 11, 2025, Open bid tab, bidtabaugmin2407pdf ↗
12 inch storm sewer, cpslp, as per planlinear foot3—$40.77$40.77 – $55.00Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗
Asphalt Concrete Base, Pg64-22, (449)cubic yard3—$998.13$232.00 – $998.13Apr 16, 2026, Open bid tab, bidtabaugmin2507pdf ↗
Geogrid For Subgrade Stabilization, As Per Plansquare yard3—$3.00$3.00Jul 10, 2023, Open bid tab, bidtabaugmin2301pdf-contractasixthst ↗
Excavation, As Per Plancubic yard3—$15.38$15.38 – $32.00Apr 16, 2026, Open bid tab, bidtabaugmin2507pdf ↗
8 inch pvc c-909 dr-18 water main, as per planlinear foot3—$76.45$60.00 – $94.00Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗