| Erosion Control | each | 10 | $1.00 | $1.00 | $1.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Maintaining Traffic | ls | 10 | $9,000 | $1,604 | $1,604 – $28,983 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Removed, As Per Plan | ls | 9 | $5,000 | $9,000 | $1,497 – $39,845 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Stabilized Crushed Aggregate | cubic yard | 8 | $65.00 | $52.00 | $36.00 – $168.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 8 | $42.91 | $46.50 | $30.20 – $57.65 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Subgrade Compaction, As Per Plan | square yard | 8 | $1.00 | $0.5 | $0.44 – $5.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Non-Tracking Tack Coat | gallon | 7 | $4.50 | $4.50 | $3.89 – $7.27 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Curb Ramp, As Per Plan | square foot | 7 | $15.00 | $19.50 | $11.00 – $20.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| 4 inch concrete walk, as per plan | square foot | 7 | $9.00 | $11.00 | $5.50 – $12.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Walk Removed | square foot | 7 | $1.50 | $4.00 | $1.00 – $10.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| 12 inch cpslp storm sewer, as per plan | linear foot | 6 | $60.50 | $51.00 | $29.00 – $85.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Pipe removed, 24 inch and under | linear foot | 6 | $23.38 | $21.50 | $8.00 – $52.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| 6 inch fire hydrant assembly, as per plan | each | 6 | $8,100 | $6,140 | $5,000 – $10,500 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| 9 inch non-reinforced concrete pavement, as per plan | square yard | 5 | $115.00 | $135.00 | $84.00 – $135.00 | Jun 11, 2025, Open bid tab, bidtabaugmin2407pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 5 | $19.62 | $21.00 | $8.00 – $27.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 5 | $11.67 | $15.50 | $6.00 – $22.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 5 | $6.00 | $11.00 | $4.00 – $20.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Valve Box Adjusted To Grade | each | 5 | $750.00 | $750.00 | $167.55 – $750.00 | Dec 21, 2023, Open bid tab, bidtabaugmin2303pdf ↗ |
| Excavation, Including Embankment Construction, As Per Plan | cubic yard | 5 | $19.00 | $19.00 | $13.50 – $25.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Curb And Gutter Removed | linear foot | 5 | $6.00 | $6.00 | $3.00 – $20.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| 8 inch gate valve | each | 5 | $2,350 | $2,783 | $1,500 – $2,783 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Type 3 Storm Manhole, As Per Plan | each | 4 | — | $4,000 | $2,870 – $5,000 | Apr 9, 2026, Open bid tab, bidtabaugmin2506pdf ↗ |
| Combination curb and gutter, type 2, 6 inch plate, as per plan | linear foot | 4 | — | $28.00 | $19.00 – $28.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Asphalt Concrete Intermediate Course, Type 2, (449) | cubic yard | 4 | — | $241.00 | $234.00 – $650.00 | Apr 9, 2026, Open bid tab, bidtabaugmin2506pdf ↗ |
| Asphalt Concrete Surface Course, Type 1, (449), Pg64-22 | cubic yard | 4 | — | $235.00 | $235.00 – $585.00 | Apr 9, 2026, Open bid tab, bidtabaugmin2506pdf ↗ |
| Excavation of subgrade and structure embankment, as per plan | cubic yard | 4 | — | $35.05 | $35.00 – $55.00 | Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗ |
| Catch Basin Removed | each | 4 | — | $667.00 | $165.69 – $667.00 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| 1 inch water service branch, as per plan | linear foot | 4 | — | $50.00 | $50.00 – $72.33 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 4 | — | $724.00 | $724.00 – $51,000 | Aug 12, 2026, Open bid tab, bidtabaugmin2104pdf ↗ |
| Type 1 Catch Basin, As Per Plan | each | 4 | — | $2,260 | $1,200 – $2,500 | Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗ |
| Fire Hydrant Extended And Adjusted To Grade | each | 3 | — | $2,600 | $1,000 – $2,938 | Dec 21, 2023, Open bid tab, bidtabaugmin2303pdf ↗ |
| 18 inch storm sewer, cpslp, as per plan | linear foot | 3 | — | $78.39 | $62.00 – $125.00 | Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗ |
| 6 inch conduit, type b, 707.45, storm lateral, as per plan | linear foot | 3 | — | $56.84 | $44.00 – $56.84 | Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗ |
| Manhole Adjusted To Grade, As Per Plan | each | 3 | — | $1,080 | $1,080 – $1,125 | Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗ |
| 6 inch sanitary sewer lateral, as per plan | linear foot | 3 | — | $123.00 | $58.72 – $123.00 | Jun 11, 2025, Open bid tab, bidtabaugmin2407pdf ↗ |
| 12 inch storm sewer, cpslp, as per plan | linear foot | 3 | — | $40.77 | $40.77 – $55.00 | Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗ |
| Asphalt Concrete Base, Pg64-22, (449) | cubic yard | 3 | — | $998.13 | $232.00 – $998.13 | Apr 16, 2026, Open bid tab, bidtabaugmin2507pdf ↗ |
| Geogrid For Subgrade Stabilization, As Per Plan | square yard | 3 | — | $3.00 | $3.00 | Jul 10, 2023, Open bid tab, bidtabaugmin2301pdf-contractasixthst ↗ |
| Excavation, As Per Plan | cubic yard | 3 | — | $15.38 | $15.38 – $32.00 | Apr 16, 2026, Open bid tab, bidtabaugmin2507pdf ↗ |
| 8 inch pvc c-909 dr-18 water main, as per plan | linear foot | 3 | — | $76.45 | $60.00 – $94.00 | Jul 11, 2023, Open bid tab, bidtabaugmin2204pdf ↗ |