| Wan Pump Modifications | ls | 1 | — | $14,000 | $14,000 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Mifflin Pump Station Modifications | ls | 1 | — | $15,000 | $15,000 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Mifflin Wwtp Decommission | each | 1 | — | $60,000 | $60,000 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Trash Trap | each | 1 | — | $45,000 | $45,000 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Flow Meter Vault | each | 1 | — | $25,000 | $25,000 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Forcemain Utility Marker | each | 1 | — | $100.00 | $100.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| 6 inch sanitary sewer pvc sdr-35 (hydro-vac excavation) | linear foot | 1 | — | $200.00 | $200.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Air Release Valve (Modified), As Per Plan | each | 1 | — | $11,000 | $11,000 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Air Release Valve, As Per Plan | each | 1 | — | $8,000 | $8,000 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| 3 inch hdpe sanitary sewer forcemain install by open cut, as per plan | linear foot | 1 | — | $89.00 | $89.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| 3 inch hdpe sanitary sewer forcemain install by hdd, as per plan | linear foot | 1 | — | $46.00 | $46.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Fence Removed And Reset | linear foot | 1 | — | $40.00 | $40.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| 4 inch sanitary sewer lateral, as per plan | linear foot | 1 | — | $165.00 | $165.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| 15 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 1 | — | $40.00 | $40.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| 12 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 1 | — | $35.00 | $35.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 1 | — | $30.00 | $30.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 1 | — | $25.00 | $25.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 1 | — | $20.00 | $20.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Construction Layout Stakes And Surveying, As Per Plan | ls | 1 | — | $2,500 | $2,500 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Seeding And Mulching, As Per Plan | square yard | 1 | — | $2.00 | $2.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 1 | — | $15,000 | $15,000 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Maintaining Traffic | ls | 1 | — | $2,500 | $2,500 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 1 | — | $100.00 | $100.00 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Removed, As Per Plan | ls | 1 | — | $2,500 | $2,500 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |
| Mobilization | ls | 1 | — | $5,000 | $5,000 | Jan 22, 2026, Open bid tab, bidtabashmif2401pdf ↗ |