Bonds And Insurances, As Per Planls3—$26,075$3,000 – $42,000Feb 10, 2026, Open bid tab, 210900 ↗
Preconstruction Video Documentationls3—$1,512$650.00 – $6,903Feb 10, 2026, Open bid tab, 210900 ↗
Construction Layout Stakes And Surveyingls3—$12,000$3,500 – $12,000Feb 10, 2026, Open bid tab, 210900 ↗
Mobilizationls3—$20,000$4,500 – $140,000Feb 10, 2026, Open bid tab, 210900 ↗
Anode Bags For Hydrant Assemblieseach2—$1,656$681.00 – $1,656Feb 10, 2026, Open bid tab, 210900 ↗
Anode bags for waterline fittingeach2—$1,666$451.00 – $1,666Feb 10, 2026, Open bid tab, 210900 ↗
12 inch water main polyvinyl chloride pipe and fitting, awwa c909 pvco, as per planlinear foot2—$315.10$175.00 – $315.10Feb 10, 2026, Open bid tab, 210900 ↗
6 Inch Fire Hydrant Assembly, Including 6 Inch Valve And Valve Box, As Per Planeach2—$13,022$8,700 – $13,022Feb 10, 2026, Open bid tab, 210900 ↗
Maintaining Traffic, As Per Planls2—$20,000$10,000 – $20,000Feb 10, 2026, Open bid tab, 210900 ↗
Seeding And Mulching, As Per Plansquare yard2—$30.00$4.00 – $30.00Feb 10, 2026, Open bid tab, 210900 ↗
Archaeological Surveying Allowancels1—$100,000$100,000Feb 10, 2026, Open bid tab, 210900 ↗
Corp Stop And Saddle And Curb Stop And Valve Boxeach1—$564.00$564.00Feb 10, 2026, Open bid tab, 210900 ↗
Stone apron or drive replace, as per plansquare yard1—$43.00$43.00Feb 10, 2026, Open bid tab, 210900 ↗
Pavement Milled And Filled, 3.00 Inchsquare yard1—$18.85$18.85Feb 10, 2026, Open bid tab, 210900 ↗
Articulated Concrete Block Mattresslinear foot1—$244.96$244.96Feb 10, 2026, Open bid tab, 210900 ↗
12 inch water main hdpe pipe - underwater installlinear foot1—$276.43$276.43Feb 10, 2026, Open bid tab, 210900 ↗
8 Inch Shallow Pipe Underdrain, As Per Planlinear foot1—$12.00$12.00May 16, 2022, Open bid tab, 201023 ↗
Asphalt Concrete Intermediate Course, Type 2, (449), As Per Plancubic yard1—$267.00$267.00May 16, 2022, Open bid tab, 201023 ↗
Asphalt Concrete Surface Course, Type 1, (449), Pg64-22, As Per Plancubic yard1—$267.00$267.00May 16, 2022, Open bid tab, 201023 ↗
Rock Excavation, Contingency, As Directdcubic yard1—$125.00$125.00May 16, 2022, Open bid tab, 201023 ↗
4 Inch Shallow Pipe Underdrain, As Per Planlinear foot1—$10.00$10.00May 16, 2022, Open bid tab, 201023 ↗
Asphalt pavement replace, as per plansquare yard1—$26.50$26.50Feb 10, 2026, Open bid tab, 210900 ↗
Excavation and remove of existing pavement & base, as per plansquare yard1—$15.00$15.00May 16, 2022, Open bid tab, 201023 ↗
Monument Box Adjusted To Gradeeach1—$450.00$450.00May 16, 2022, Open bid tab, 201023 ↗
4 inch concrete walk, including remove, as per plansquare foot1—$10.90$10.90May 16, 2022, Open bid tab, 201023 ↗
1 Inch Copper Service Branchlinear foot1—$20.00$20.00Feb 10, 2026, Open bid tab, 210900 ↗
Asphalt apron or drive replace, as per plansquare yard1—$150.00$150.00Feb 10, 2026, Open bid tab, 210900 ↗
Type "a" pavement replace (concrete), driveway, apron, or parking lot, as per plansquare yard1—$65.50$65.50May 16, 2022, Open bid tab, 201023 ↗
12 Inch Gate Valve AND Valve BOXeach1—$10,704$10,704Feb 10, 2026, Open bid tab, 210900 ↗
8 inch water main polyvinyl chloride pipe and fitting, awwa c909 pvco, as per planlinear foot1—$92.50$92.50Feb 10, 2026, Open bid tab, 210900 ↗
Contingency/Discretionary Allowancels1—$25,000$25,000May 16, 2022, Open bid tab, 201023 ↗
Temporary Sediment And Erosion Control, As Per Planls1—$1,200$1,200May 16, 2022, Open bid tab, 201023 ↗
Conduit, Misc.: Connection Of Conduit To Existing Drainage Structureeach1—$150.00$150.00Feb 10, 2026, Open bid tab, 210900 ↗
Type "c" pavement replace (asphalt), roadway, as per plansquare yard1—$116.00$116.00May 16, 2022, Open bid tab, 201023 ↗
Seeding And Mulching, As Per Planls1—$2,500$2,500May 16, 2022, Open bid tab, 201023 ↗
Concrete apron or drive replace, as per plansquare yard1—$99.00$99.00Feb 10, 2026, Open bid tab, 210900 ↗
Linear Grading, As Per Planstation1—$200.00$200.00May 16, 2022, Open bid tab, 201023 ↗
Stabilized Crushed Aggregate, As Per Plancubic yard1—$45.00$45.00May 16, 2022, Open bid tab, 201023 ↗
10 inch storm sewer, as per planlinear foot1—$62.00$62.00May 16, 2022, Open bid tab, 201023 ↗
Proof Rollinghour1—$85.00$85.00May 16, 2022, Open bid tab, 201023 ↗