| Sanitary Service & Grinder Pump (For Restroom Facility And Splash Pad) | ls | 1 | — | $100,000 | $100,000 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Electric Service (For Restroom Facility And Splash Pad) | ls | 1 | — | $50,000 | $50,000 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Water Service (For Restroom Facility And Splash Pad) | ls | 1 | — | $43,000 | $43,000 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Restroom facility (including slab foundation & install) | ls | 1 | — | $75,000 | $75,000 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Playground (equipment, install & mulching) | ls | 1 | — | $136,795 | $136,795 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Splash pad (equipment & install) | ls | 1 | — | $118,612 | $118,612 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Remove And Reset Wood Bollards | ls | 1 | — | $1,700 | $1,700 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| 7 inch non-reinforced concrete pavement (splash pad) | square yard | 1 | — | $100.00 | $100.00 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| 1-1/2 ± Asphalt Concrete Surface Course, Type 1, (449), Pg64-22 (Existing Drive) | cubic yard | 1 | — | $240.00 | $240.00 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Non-Tracking Tack Coat, 0.06 Gal/S.Y. (Existing Drive) | gallon | 1 | — | $5.00 | $5.00 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| 8 inch aggregate (gravel parking areas) | cubic yard | 1 | — | $50.00 | $50.00 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Pavement milling, asphalt concrete, 1-1/2 inch± (existing drive) | square yard | 1 | — | $3.00 | $3.00 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Construction Layout Stakes And Surveying | ls | 1 | — | $7,500 | $7,500 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Stormwater Pollution Prevention Plan | ls | 1 | — | $3,500 | $3,500 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 1 | — | $2.00 | $2.00 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| 4 inch concrete walk | square foot | 1 | — | $15.00 | $15.00 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $30.00 | $30.00 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $25.00 | $25.00 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $20.00 | $20.00 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Stabilized Crushed Aggregate | cubic yard | 1 | — | $50.00 | $50.00 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Excavation, Including Embankment Construction, As Per Plan | cubic yard | 1 | — | $100.00 | $100.00 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Removed, As Per Plan | ls | 1 | — | $5,000 | $5,000 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Erosion Control | ls | 1 | — | $3,000 | $3,000 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Mobilization | ls | 1 | — | $3,500 | $3,500 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |
| Clearing and Grubbing | ls | 1 | — | $5,000 | $5,000 | Jun 18, 2025, Open bid tab, bidtabhiglee2401pdf ↗ |