Skip to content
Hubstake

Agency · awarded bid prices

Village of Jackson Center: awarded unit prices

62 winning bid prices read from 4 source documents, 2021–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Village of Jackson Center

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Sanitary pump station b, wet well rehabilitation, 96 inch diameter vert.linear foot2—$1,112$690.00 – $1,112May 17, 2023, Open bid tab, bidtabshejce2203pdf ↗
Sanitary manhole rehabilitation, manhole#11 thru #22, vert.linear foot2—$240.00$168.00 – $240.00May 17, 2023, Open bid tab, bidtabshejce2203pdf ↗
Clearing And Grubbing, As Per Planls2—$500.00$500.00 – $3,500Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Maintaining Trafficls2—$10,000$1,500 – $10,000Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Curb Stop, As Per Planeach1—$700.00$700.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
6 inch cut and plugeach1—$500.00$500.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
3/4 inch water service branch, as per plan (sdr-9 cts)linear foot1—$80.00$80.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
12 inch water main, as per plan (c900, dr18)linear foot1—$125.00$125.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Hydra-Stop Disconnect, As Per Planeach1—$8,500$8,500Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Concrete Driveway Aprons Removedsquare foot1—$5.00$5.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Tree Removed, 18 Inch Sizeeach1—$1,600$1,600Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Type 2-3 Outlet Structure #1, As Per Planeach1—$3,000$3,000Aug 25, 2021, Open bid tab, bidtabshejce2108pdf ↗
24 inch reinforced concrete pipe class iii, type b, as per planlinear foot1—$71.00$71.00Aug 25, 2021, Open bid tab, bidtabshejce2108pdf ↗
24 inch cpslp, type b, as per planlinear foot1—$63.00$63.00Aug 25, 2021, Open bid tab, bidtabshejce2108pdf ↗
6 inch pvc sdr-35, type b, as per planlinear foot1—$33.00$33.00Aug 25, 2021, Open bid tab, bidtabshejce2108pdf ↗
Paved Gutter, Misc.: 2' Paved Concrete Channel, As Per Planlinear foot1—$45.00$45.00Aug 25, 2021, Open bid tab, bidtabshejce2108pdf ↗
Type 2 Curb And Gutter, As Per Planlinear foot1—$25.00$25.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Asphalt Pavement Removedsquare yard1—$7.00$7.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Inlet Protection (Dandy Bag)each1—$200.00$200.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
6 inch conduit, type b, 707.45, sanitary lateral repairlinear foot1—$55.00$55.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
12 inch conduit, type b, 707.33linear foot1—$90.00$90.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Concrete Pavement Removedsquare yard1—$10.00$10.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Seeding And Mulching, Type 1, As Per Plansquare yard1—$5.00$5.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Type 2-3 Catch Basin, As Per Planeach1—$1,765$1,765Aug 25, 2021, Open bid tab, bidtabshejce2108pdf ↗
Embankment, As Per Plancubic yard1—$1.50$1.50Aug 25, 2021, Open bid tab, bidtabshejce2108pdf ↗
Sidewalk Removedsquare foot1—$5.00$5.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Catch Basin, Type 1, As Per Planeach1—$2,800$2,800Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Concrete Masonrycubic yard1—$250.00$250.00Aug 25, 2021, Open bid tab, bidtabshejce2108pdf ↗
6 inch water main, as per plan (c900, dr18)linear foot1—$150.00$150.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Asphalt Concrete Intermediate Course, Type 2, (449)cubic yard1—$215.00$215.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Asphalt Concrete Surface Course, Type 1, (449), Pg64-22cubic yard1—$230.00$230.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Excavation, As Per Plancubic yard1—$1.50$1.50Aug 25, 2021, Open bid tab, bidtabshejce2108pdf ↗
Storm Sewer Manhole, No. 3, As Per Planeach1—$3,000$3,000Aug 25, 2021, Open bid tab, bidtabshejce2108pdf ↗
6 inch non-reinforced concrete pavement, as per plansquare yard1—$100.00$100.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Excavation, Including Embankment, As Per Plancubic yard1—$20.00$20.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Fire Hydrant Removedeach1—$800.00$800.00Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
Seeding And Mulching, Class 1, As Per Plansquare yard1—$0.8$0.8Aug 25, 2021, Open bid tab, bidtabshejce2108pdf ↗
Erosion Controleach1—$1.00$1.00Aug 25, 2021, Open bid tab, bidtabshejce2108pdf ↗
6 inch fire hydrant assembly, as per planeach1—$10,000$10,000Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗
12 inchx12 inch tapping sleeve and valveeach1—$13,000$13,000Jun 25, 2026, Open bid tab, bidtabshejce2601pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Ohio: statewide figures.