Skip to content
Hubstake

Agency · awarded bid prices

Village of Harveysburg: awarded unit prices

77 winning bid prices read from 2 source documents, 2023–2025. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Village of Harveysburg

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Pavement Repairsquare yard3—$72.00$72.00 – $145.00Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
2 inch pavement milling, asphalt concretesquare yard3—$2.55$2.55 – $10.20Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Non-Tracking Tack Coat, 0.09 Gal/S.Y.gallon2—$3.30$3.30Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Construction Layout Stakes And Surveyingls2—$2,500$2,500 – $4,750Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Edge line, 4 inchmile2—$6,050$6,050Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
2 inch asphalt concrete surface course, type 1, (449), pg64-22cubic yard2—$196.00$196.00Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Curb Removedlinear foot2—$17.09$9.00 – $17.09Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Clearing And Grubbing, As Per Planls2—$2,000$2,000 – $4,250Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Stop Linelinear foot2—$11.00$11.00Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Center Linemile2—$12,100$12,100Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Maintaining Trafficls2—$5,000$5,000 – $19,950Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Walk Removedsquare foot2—$3.50$3.50 – $21.00Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Removed, As Per Planls2—$1,500$1,500 – $5,750Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Maintaining Traffic (Includes Sr 73 Lane Closure)ls1—$2,500$2,500Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Combination Curb And Gutter, Type 2, As Per Plan (Contingency)linear foot1—$73.50$73.50Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Curb Removed (Contingency)linear foot1—$17.09$17.09Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Misc. 1 inch water service line relocated, as per planlinear foot1—$95.00$95.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
Misc. 6 inch water main relocated, as per planlinear foot1—$140.00$140.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
Type 2-3A Catch Basin, As Per Planeach1—$2,250$2,250Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
8 inch conduit, 707.45, storm repair, as per planlinear foot1—$30.00$30.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
6 inch conduit, 707.45, storm repair, as per planlinear foot1—$25.00$25.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
4 inch conduit, 707.45, storm repair, as per planlinear foot1—$20.00$20.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
Misc. 6 inch sanitary sewer lateral relocated, as per planlinear foot1—$40.00$40.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
12 inch aggregate base, as per plancubic yard1—$72.00$72.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
6 inch asphalt concrete base, pg64-22, (449)cubic yard1—$405.00$405.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
Type 6 Barrier Curb Replaced (In Kind)linear foot1—$51.00$51.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
4 inch concrete walk replaced, in-kindsquare foot1—$35.00$35.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
Seeding And Mulching, Type 1, As Per Plansquare yard1—$12.00$12.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
2 inch asphalt concrete surface course, type 1, pg 64-22cubic yard1—$345.00$345.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
Type 2-3 Catch Basin, As Per Planeach1—$1,980$1,980Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
18 inch storm sewer, as per planlinear foot1—$68.00$68.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
30 inch storm sewer, as per planlinear foot1—$101.00$101.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
24 inch storm sewer, as per planlinear foot1—$109.00$109.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
Tack Coat, 0.09 Gal/S.Y.gallon1—$5.00$5.00Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
Type 3 Storm Manhole, As Per Planeach1—$2,850$2,850Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
Type 2-2B Catch Basin, As Per Planeach1—$1,265$1,265Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
3 inch stabilized crushed aggregatecubic yard1—$263.00$263.00Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Sign Post Reflectoreach1—$60.50$60.50Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗
Concrete Masonrycubic yard1—$5,150$5,150Jul 6, 2023, Open bid tab, bidtabwarhar2102pdf ↗
Crosswalk line, 12 inchlinear foot1—$11.00$11.00Jul 10, 2025, Open bid tab, bidtabwarhar2401pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Ohio: statewide figures.