| Non-Tracking Tack Coat, 0.06 Gal/S.Y. | gallon | 2 | — | $4.25 | $4.25 – $10.00 | Dec 5, 2024, Open bid tab, bidtabbrogeo2403pdf ↗ |
| Seeding And Mulching, Class 1 | square yard | 1 | — | $6.00 | $6.00 | Dec 5, 2024, Open bid tab, bidtabbrogeo2403pdf ↗ |
| 2 inch pavement milling, asphalt concrete, as per plan | square yard | 1 | — | $4.00 | $4.00 | Dec 5, 2024, Open bid tab, bidtabbrogeo2403pdf ↗ |
| 8 inch insertion valve, as per plan | each | 1 | — | $15,000 | $15,000 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 9 inch non-reinforced concrete pavement, as per plan | square yard | 1 | — | $80.00 | $80.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| Meter pit, including setting and valve, as per plan | each | 1 | — | $1,000 | $1,000 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| Fire Hydrant Removed | each | 1 | — | $100.00 | $100.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 8 inch pvc awwa c-900 dr-18 water main, as per plan | linear foot | 1 | — | $190.00 | $190.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 3/4 inch water service branch, as per plan | linear foot | 1 | — | $20.00 | $20.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 6 inch sanitary lateral repair, as per plan | linear foot | 1 | — | $12.00 | $12.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| Barrier Curb Replaced, In Kind | linear foot | 1 | — | $50.00 | $50.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 4 inch concrete sidewalk | square foot | 1 | — | $10.00 | $10.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 2 inch asphalt surface course, type 1, pg64-22 (449) | cubic yard | 1 | — | $300.00 | $300.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 6 inch pvc awwa c-900 dr-18 water main, as per plan | linear foot | 1 | — | $220.00 | $220.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 4 inch pvc awwa c-900 dr-18 water main, as per plan | linear foot | 1 | — | $200.00 | $200.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 1 inch water service branch, as per plan | linear foot | 1 | — | $25.00 | $25.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 4 inch insertion valve, as per plan | each | 1 | — | $13,000 | $13,000 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| Construction Layout Stakes And Surveying, As Per Plan | ls | 1 | — | $8,000 | $8,000 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 4 inch sanitary lateral repair, as per plan | linear foot | 1 | — | $10.00 | $10.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| Seeding And Mulching, As Per Plan | square yard | 1 | — | $1.00 | $1.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 6 inch fire hydrant assembly, as per plan | each | 1 | — | $5,000 | $5,000 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $7.00 | $7.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $6.00 | $6.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $5.00 | $5.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| 2 inch asphalt concrete surface course, type 1, (449), pg64-22 | cubic yard | 1 | — | $426.00 | $426.00 | Dec 5, 2024, Open bid tab, bidtabbrogeo2403pdf ↗ |
| Valve Box Removed | each | 1 | — | $10.00 | $10.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| Curb Removed | linear foot | 1 | — | $1.00 | $1.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| Asphalt Concrete Base, Pg64-22 | cubic yard | 1 | — | $280.00 | $280.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| Maintaining Traffic | ls | 1 | — | $11,300 | $11,300 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 1 | — | $60.00 | $60.00 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| Removed, As Per Plan | ls | 1 | — | $1,000 | $1,000 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |
| Mobilization | ls | 1 | — | $1,000 | $1,000 | Dec 5, 2024, Open bid tab, bidtabbrogeo2403pdf ↗ |
| 8 inch gate valve | each | 1 | — | $2,000 | $2,000 | Nov 22, 2022, Open bid tab, bidtabbrogeo2103pdf ↗ |