Village of Geneva on the Lake: awarded unit prices

44 winning bid prices read from 2 source documents, 2023. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Village of Geneva on the Lake

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Bonds And Insurances, As Per Planls2—$40,256$2,500 – $40,256Oct 20, 2023, Open bid tab, 210710 ↗
Preconstruction Video Documentationls2—$1,500$1,500Oct 20, 2023, Open bid tab, 210710 ↗
AGGREGATE BASE, SIZE NO. 1 & 2s, AS PER PLANcubic yard1—$150.00$150.00Jan 27, 2023, Open bid tab, 220578 ↗
24 Inch Drain Basin, Pre-Fabricated, Engineered Pvc Drainage Structure, As Per Planeach1—$1,000$1,000Jan 27, 2023, Open bid tab, 220578 ↗
Pavement milling, asphalt concrete, variable width and thichness, as per plansquare yard1—$4.00$4.00Jan 27, 2023, Open bid tab, 220578 ↗
Geotextile Fabric, 712.09, Type Asquare yard1—$4.00$4.00Jan 27, 2023, Open bid tab, 220578 ↗
Culvert Pipe Removed, 24 Inch And Underlinear foot1—$15.00$15.00Jan 27, 2023, Open bid tab, 220578 ↗
Type "A" Sanitary Manhole, As Per Planeach1—$6,000$6,000Oct 20, 2023, Open bid tab, 210710 ↗
10 Inch Conduit, Horizontal Directional Drilling Without Casing, As Per Planlinear foot1—$111.00$111.00Oct 20, 2023, Open bid tab, 210710 ↗
Connection To Existing Sanitary Manhole, As Per Planeach1—$1,515$1,515Oct 20, 2023, Open bid tab, 210710 ↗
Manhole Abandoned, As Per Planeach1—$1,000$1,000Oct 20, 2023, Open bid tab, 210710 ↗
Bulkhead Existing Pipe, As Per Planeach1—$500.00$500.00Oct 20, 2023, Open bid tab, 210710 ↗
Tack Coat, As Per Plangallon1—$5.00$5.00Jan 27, 2023, Open bid tab, 220578 ↗
8 Inch Conduit, Horizontal Directional Drilling Without Casing, As Per Planlinear foot1—$105.80$105.80Oct 20, 2023, Open bid tab, 210710 ↗
Sanitary Sewer Abandoned, Grout Filled, As Per Planlinear foot1—$20.50$20.50Oct 20, 2023, Open bid tab, 210710 ↗
18 inch - 24 inch storm sewer heavy clean, as per planlinear foot1—$35.00$35.00Jan 27, 2023, Open bid tab, 220578 ↗
8 inch - 15 inch storm sewer heavy clean, as per planlinear foot1—$22.00$22.00Jan 27, 2023, Open bid tab, 220578 ↗
MANHOLE ADJUSTED TO GRADE, METHOD D.1 (brick), AS PER PLANeach1—$900.00$900.00Jan 27, 2023, Open bid tab, 220578 ↗
Asphalt Concrete Intermediate Course, Type 1, (448)cubic yard1—$221.00$221.00Jan 27, 2023, Open bid tab, 220578 ↗
Junction Chamber, As Per Planeach1—$11,530$11,530Oct 20, 2023, Open bid tab, 210710 ↗
Rounded End Sectioneach1—$600.00$600.00Jan 27, 2023, Open bid tab, 220578 ↗
Rock Channel Protection, Type C With Fabric Filter, As Per Plancubic yard1—$200.00$200.00Jan 27, 2023, Open bid tab, 220578 ↗
Type "f" pavement replace (stone), driveway, apron, or parking lot, as per plansquare yard1—$20.00$20.00Jan 27, 2023, Open bid tab, 220578 ↗
Granular Material Type B, As Per Plancubic yard1—$100.00$100.00Jan 27, 2023, Open bid tab, 220578 ↗
Type "c" pavement replace (asphalt), roadway, as per plansquare yard1—$1,386$1,386Oct 20, 2023, Open bid tab, 210710 ↗
Special - mailbox, temporary relocation and permanent installeach1—$400.00$400.00Jan 27, 2023, Open bid tab, 220578 ↗
Lawn Restoration (Grading, Seeding, & Mulching)ls1—$8,000$8,000Jan 27, 2023, Open bid tab, 220578 ↗
Erosion Control, As Per Planls1—$4,500$4,500Jan 27, 2023, Open bid tab, 220578 ↗
Sawing and seal asphalt concrete pavement joint, as per planlinear foot1—$12.00$12.00Jan 27, 2023, Open bid tab, 220578 ↗
Guardrail, Type Mgslinear foot1—$60.00$60.00Jan 27, 2023, Open bid tab, 220578 ↗
6 inch conduit, type b, as per planlinear foot1—$65.00$65.00Jan 27, 2023, Open bid tab, 220578 ↗
10 inch sanitary sewer, as per planlinear foot1—$165.00$165.00Oct 20, 2023, Open bid tab, 210710 ↗
8 inch sanitary sewer, as per planlinear foot1—$155.00$155.00Oct 20, 2023, Open bid tab, 210710 ↗
Asphalt Concrete Surface Course, Type 1, (448), Pg64-22cubic yard1—$221.00$221.00Jan 27, 2023, Open bid tab, 220578 ↗
Construction Layout Stakes And Surveyingls1—$15,000$15,000Jan 27, 2023, Open bid tab, 220578 ↗
Excavation, As Per Plancubic yard1—$88.00$88.00Jan 27, 2023, Open bid tab, 220578 ↗
Linear Grading, As Per Planlinear foot1—$5.50$5.50Jan 27, 2023, Open bid tab, 220578 ↗
Maintaining Trafficls1—$30,000$30,000Jan 27, 2023, Open bid tab, 220578 ↗
12 inch conduit, type b, as per planlinear foot1—$80.00$80.00Jan 27, 2023, Open bid tab, 220578 ↗
Aggregate Base, As Per Plancubic yard1—$150.00$150.00Jan 27, 2023, Open bid tab, 220578 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.