Village of Fort Recovery: awarded unit prices

312 winning bid prices read from 15 source documents, 2019–2024. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Village of Fort Recovery

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Excavation, Including Embankment Construction, As Per Plancubic yard6$24.00$14.87$8.60 – $65.00Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗
Removed, As Per Planls6$7,625$17,049$222.00 – $17,049Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗
Maintaining Trafficls5—$46,795$650.00 – $46,795Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s8 ↗
Subgrade Compaction, As Per Plansquare yard5$1.00$0.49$0.45 – $3.00Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗
Seeding And Mulching, Class 1, As Per Plansquare yard4—$15.43$3.48 – $15.43Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s8 ↗
Erosion Controleach4—$1.00$1.00 – $2.00Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s1 ↗
Curb Ramp, As Per Plansquare foot4—$12.66$10.00 – $46.40Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗
Aggregate Basecubic yard4—$150.00$45.00 – $150.00Mar 14, 2024, Open bid tab, bidtabmerfre2305pdf ↗
Non-Tracking Tack Coatgallon3—$5.46$2.20 – $7.00Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s4 ↗
8 inch conduit, type b, 707.45, storm repairlinear foot3—$27.00$5.80 – $27.00Mar 14, 2024, Open bid tab, bidtabmerfre2305pdf ↗
6 inch conduit, type b, 707.45, storm repairlinear foot3—$20.00$5.80 – $20.00Mar 14, 2024, Open bid tab, bidtabmerfre2305pdf ↗
Clearing And Grubbing, As Per Planls3—$6,631$6,631 – $10,456Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗
4 inch concrete walk, as per plansquare foot3—$8.51$6.30 – $8.51Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗
Excavation Of Subgrade, As Per Plancubic yard3—$29.00$29.00 – $51.00Nov 9, 2023, Open bid tab, bidtabmerfre2301pdf ↗
Walk Removedsquare foot3—$1.40$0.4 – $2.32Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗
Pedestal, Misc.: Pedestal, 8', Decorativeeach2—$2,503$2,503 – $3,313Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
Luminaire, Decorative, As Per Plan, Solid-State (Led), Acorn Style, Refractive Glass, 4000Keach2—$2,449$2,108 – $2,449Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
Accessible Pedestrian Pushbutton, As Per Planeach2—$925.09$925.09 – $1,247Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
Atc Controller, As Per Planeach2—$7,074$6,754 – $7,074Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
Cabinet, Type Ts-2, As Per Planeach2—$19,590$16,835 – $19,590Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
Service Cable, 3 Conductor, No. 6 Awglinear foot2—$8.83$6.33 – $8.83Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
Signal Cable, 3 Conductor, No. 12 Awglinear foot2—$2.84$2.84 – $3.10Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
Pedestrian Signal Head, (Led), Type D2, Countdown, As Per Planeach2—$854.35$679.76 – $854.35Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
Vehicular signal head, (led), 3-section, 12 inch lens, 1-way, polycarbonate, as per plan, blackeach2—$1,415$1,068 – $1,415Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
4 inch conduit, type elinear foot2—$2.08$2.08 – $54.17Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
Stop Line Radar Detection, As Per Planeach2—$10,448$9,162 – $10,448Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
Detour Signing, As Per Planls2—$14,373$5,451 – $14,373Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s8 ↗
1-1/4 inch pavement milling, asphalt concretesquare yard2—$9.76$9.76 – $20.00Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s4 ↗
8 inch inserting valve and valve boxeach2—$11,733$11,733 – $12,200Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s5 ↗
Crosswalk line, 24 inchlinear foot2—$7.09$7.09 – $13.22Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
Crosswalk line, 12 inchlinear foot2—$6.81$2.00 – $6.81Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗
Asphalt Concrete Intermediate Course, Type 2, (449)cubic yard2—$282.98$250.00 – $282.98Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s4 ↗
Geogrid For Subgrade Stabilization, As Per Plansquare yard2—$5.28$5.00 – $5.28Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗
6 inch non-reinforced concrete pavement, as per plansquare yard2—$72.00$72.00 – $75.60Jul 13, 2023, Open bid tab, bidtabmerfre2304pdf ↗
Excavation of subgrade and structure embankment, as per plancubic yard2—$61.31$46.00 – $61.31Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗
Catch Basin Removedeach2—$300.00$150.20 – $300.00Jul 13, 2023, Open bid tab, bidtabmerfre2304pdf ↗
Pipe removed, 24 inch and underlinear foot2—$12.00$12.00 – $26.00Jul 13, 2023, Open bid tab, bidtabmerfre2304pdf ↗
Fire Hydrant Removedeach2—$247.65$247.65 – $500.00Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s5 ↗
1 inch water service branch, as per planlinear foot2—$80.14$52.00 – $80.14Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s5 ↗
Seeding And Mulching, As Per Plansquare yard2—$6.00$6.00 – $7.00Jul 13, 2023, Open bid tab, bidtabmerfre2304pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.