| Excavation, Including Embankment Construction, As Per Plan | cubic yard | 6 | $24.00 | $14.87 | $8.60 – $65.00 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗ |
| Removed, As Per Plan | ls | 6 | $7,625 | $17,049 | $222.00 – $17,049 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗ |
| Maintaining Traffic | ls | 5 | — | $46,795 | $650.00 – $46,795 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s8 ↗ |
| Subgrade Compaction, As Per Plan | square yard | 5 | $1.00 | $0.49 | $0.45 – $3.00 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 4 | — | $15.43 | $3.48 – $15.43 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s8 ↗ |
| Erosion Control | each | 4 | — | $1.00 | $1.00 – $2.00 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s1 ↗ |
| Curb Ramp, As Per Plan | square foot | 4 | — | $12.66 | $10.00 – $46.40 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗ |
| Aggregate Base | cubic yard | 4 | — | $150.00 | $45.00 – $150.00 | Mar 14, 2024, Open bid tab, bidtabmerfre2305pdf ↗ |
| Non-Tracking Tack Coat | gallon | 3 | — | $5.46 | $2.20 – $7.00 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s4 ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $27.00 | $5.80 – $27.00 | Mar 14, 2024, Open bid tab, bidtabmerfre2305pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $20.00 | $5.80 – $20.00 | Mar 14, 2024, Open bid tab, bidtabmerfre2305pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 3 | — | $6,631 | $6,631 – $10,456 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗ |
| 4 inch concrete walk, as per plan | square foot | 3 | — | $8.51 | $6.30 – $8.51 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗ |
| Excavation Of Subgrade, As Per Plan | cubic yard | 3 | — | $29.00 | $29.00 – $51.00 | Nov 9, 2023, Open bid tab, bidtabmerfre2301pdf ↗ |
| Walk Removed | square foot | 3 | — | $1.40 | $0.4 – $2.32 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗ |
| Pedestal, Misc.: Pedestal, 8', Decorative | each | 2 | — | $2,503 | $2,503 – $3,313 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| Luminaire, Decorative, As Per Plan, Solid-State (Led), Acorn Style, Refractive Glass, 4000K | each | 2 | — | $2,449 | $2,108 – $2,449 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| Accessible Pedestrian Pushbutton, As Per Plan | each | 2 | — | $925.09 | $925.09 – $1,247 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| Atc Controller, As Per Plan | each | 2 | — | $7,074 | $6,754 – $7,074 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| Cabinet, Type Ts-2, As Per Plan | each | 2 | — | $19,590 | $16,835 – $19,590 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| Service Cable, 3 Conductor, No. 6 Awg | linear foot | 2 | — | $8.83 | $6.33 – $8.83 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| Signal Cable, 3 Conductor, No. 12 Awg | linear foot | 2 | — | $2.84 | $2.84 – $3.10 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| Pedestrian Signal Head, (Led), Type D2, Countdown, As Per Plan | each | 2 | — | $854.35 | $679.76 – $854.35 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| Vehicular signal head, (led), 3-section, 12 inch lens, 1-way, polycarbonate, as per plan, black | each | 2 | — | $1,415 | $1,068 – $1,415 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| 4 inch conduit, type e | linear foot | 2 | — | $2.08 | $2.08 – $54.17 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| Stop Line Radar Detection, As Per Plan | each | 2 | — | $10,448 | $9,162 – $10,448 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| Detour Signing, As Per Plan | ls | 2 | — | $14,373 | $5,451 – $14,373 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s8 ↗ |
| 1-1/4 inch pavement milling, asphalt concrete | square yard | 2 | — | $9.76 | $9.76 – $20.00 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s4 ↗ |
| 8 inch inserting valve and valve box | each | 2 | — | $11,733 | $11,733 – $12,200 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s5 ↗ |
| Crosswalk line, 24 inch | linear foot | 2 | — | $7.09 | $7.09 – $13.22 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| Crosswalk line, 12 inch | linear foot | 2 | — | $6.81 | $2.00 – $6.81 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s6 ↗ |
| Asphalt Concrete Intermediate Course, Type 2, (449) | cubic yard | 2 | — | $282.98 | $250.00 – $282.98 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s4 ↗ |
| Geogrid For Subgrade Stabilization, As Per Plan | square yard | 2 | — | $5.28 | $5.00 – $5.28 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗ |
| 6 inch non-reinforced concrete pavement, as per plan | square yard | 2 | — | $72.00 | $72.00 – $75.60 | Jul 13, 2023, Open bid tab, bidtabmerfre2304pdf ↗ |
| Excavation of subgrade and structure embankment, as per plan | cubic yard | 2 | — | $61.31 | $46.00 – $61.31 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s0 ↗ |
| Catch Basin Removed | each | 2 | — | $300.00 | $150.20 – $300.00 | Jul 13, 2023, Open bid tab, bidtabmerfre2304pdf ↗ |
| Pipe removed, 24 inch and under | linear foot | 2 | — | $12.00 | $12.00 – $26.00 | Jul 13, 2023, Open bid tab, bidtabmerfre2304pdf ↗ |
| Fire Hydrant Removed | each | 2 | — | $247.65 | $247.65 – $500.00 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s5 ↗ |
| 1 inch water service branch, as per plan | linear foot | 2 | — | $80.14 | $52.00 – $80.14 | Sep 5, 2024, Open bid tab, bidtabmerfre2005pdf-s5 ↗ |
| Seeding And Mulching, As Per Plan | square yard | 2 | — | $6.00 | $6.00 – $7.00 | Jul 13, 2023, Open bid tab, bidtabmerfre2304pdf ↗ |