| Maintaining Traffic | ls | 7 | $6,166 | $4,429 | $1,000 – $10,000 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| Removed, As Per Plan | ls | 6 | $8,645 | $10,290 | $1,577 – $40,389 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| Asphalt Concrete Surface Course, Type 1, (449), Pg64-22 | cubic yard | 5 | $360.00 | $273.50 | $228.50 – $1,199 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| 6 inch non-reinforced concrete pavement, as per plan | square yard | 5 | $100.00 | $68.90 | $68.90 – $169.34 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| Non-Tracking Tack Coat | gallon | 5 | $11.57 | $11.57 | $4.50 – $164.01 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 5 | $2.62 | $1.53 | $1.53 – $6.77 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| Aggregate Base | cubic yard | 5 | $53.70 | $81.28 | $39.00 – $97.00 | Feb 24, 2025, Open bid tab, bidtabsheflo2301pdf ↗ |
| Detour Signing, As Per Plan | ls | 4 | — | $7,165 | $5,000 – $13,757 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| Asphalt Concrete Intermediate Course, Type 2, (449) | cubic yard | 4 | — | $205.12 | $205.12 – $400.00 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| Erosion Control | each | 4 | — | $1.00 | $1.00 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| 6 inch fire hydrant assembly, as per plan | each | 4 | — | $8,550 | $8,065 – $10,547 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| Walk Removed | square foot | 4 | — | $1.42 | $0.53 – $5.00 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| 12 inch awwa c-900 dr-18 water main, as per plan | linear foot | 3 | — | $92.08 | $92.08 – $117.79 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| Storm Sewer Cleanout (Out Of Pavement), As Per Plan | each | 3 | — | $227.89 | $227.89 – $425.57 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| 6 inch storm sewer lateral, as per plan | linear foot | 3 | — | $47.02 | $44.51 – $75.00 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| Catch Basin, Type 1, As Per Plan | each | 3 | — | $3,267 | $2,188 – $3,267 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| Asphalt Concrete Base, Pg64-22, (449) | cubic yard | 3 | — | $184.08 | $184.08 – $383.00 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| Storm Sewer Manhole, No. 3, As Per Plan | each | 3 | — | $5,617 | $3,951 – $7,000 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 3 | — | $19.49 | $19.49 – $25.98 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 3 | — | $11.73 | $11.73 – $21.62 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 3 | — | $5.68 | $5.68 – $18.31 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $30.01 | $30.01 – $46.62 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $22.29 | $22.29 – $36.95 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $18.17 | $18.17 – $29.71 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| Subgrade Compaction | square yard | 3 | — | $1.00 | $0.45 – $1.00 | Jan 27, 2023, Open bid tab, bidtabsheflo2203pdf ↗ |
| Remove of ground mounted sign and reerection | each | 3 | — | $72.74 | $72.74 – $88.56 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| Stabilized Crushed Aggregate | cubic yard | 3 | — | $89.65 | $54.03 – $160.00 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| Subgrade Compaction, As Per Plan | square yard | 3 | — | $0.52 | $0.52 – $0.81 | Jul 16, 2025, Open bid tab, bidtabsheflo2501pdf ↗ |
| 36 inch cpslp storm sewer, with lsm type 1 backfill, as per plan | linear foot | 2 | — | $400.00 | $196.71 – $400.00 | May 26, 2022, Open bid tab, bidtabsheflo2103pdf ↗ |
| 36 inch cpslp storm sewer, as per plan | linear foot | 2 | — | $122.00 | $79.48 – $122.00 | May 26, 2022, Open bid tab, bidtabsheflo2103pdf ↗ |
| 8 inch pvc sdr-35 storm sewer, as per plan | linear foot | 2 | — | $105.00 | $30.77 – $105.00 | May 26, 2022, Open bid tab, bidtabsheflo2103pdf ↗ |
| Water Works, Misc.: Water Service Line Relocated, As Per Plan | linear foot | 2 | — | $29.90 | $25.90 – $29.90 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| Non-Tracking Tack Coat, 0.09 Gal/S.Y. | gallon | 2 | — | $5.00 | $5.00 – $5.50 | Mar 25, 2024, Open bid tab, bidtabsheflo2401pdf ↗ |
| 24 inch reinforced concrete pipe class-iii storm sewer, as per plan | linear foot | 2 | — | $300.00 | $158.01 – $300.00 | May 26, 2022, Open bid tab, bidtabsheflo2103pdf ↗ |
| Pavement milling, asphalt concrete, 1-1/2 inch± | square yard | 2 | — | $2.75 | $2.75 – $3.00 | Mar 25, 2024, Open bid tab, bidtabsheflo2401pdf ↗ |
| 18 inch cpslp storm sewer, as per plan | linear foot | 2 | — | $300.00 | $74.93 – $300.00 | May 26, 2022, Open bid tab, bidtabsheflo2103pdf ↗ |
| 10 inch pvc sdr-35 storm sewer, as per plan | linear foot | 2 | — | $220.00 | $135.90 – $220.00 | May 26, 2022, Open bid tab, bidtabsheflo2103pdf ↗ |
| 12 inch cpslp storm sewer, as per plan | linear foot | 2 | — | $70.00 | $34.68 – $70.00 | May 26, 2022, Open bid tab, bidtabsheflo2103pdf ↗ |
| 9 inch non-reinforced concrete pavement, as per plan | square yard | 2 | — | $87.72 | $87.72 – $289.28 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |
| Yard Drain, As Per Plan | each | 2 | — | $1,506 | $957.18 – $1,506 | Jun 4, 2025, Open bid tab, bidtabsheflo2107pdf ↗ |