| Valve Box Adjusted To Grade | each | 4 | — | $300.00 | $100.00 – $300.00 | Dec 20, 2024, Open bid tab, 241496 ↗ |
| Mobilization | ls | 4 | — | $8,700 | $8,700 – $15,635 | Dec 20, 2024, Open bid tab, 241496 ↗ |
| Contingency/Discretionary Allowance | ls | 3 | — | $15,000 | $15,000 – $25,000 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Bonds And Insurances, As Per Plan | ls | 3 | — | $7,500 | $1,618 – $7,500 | Dec 20, 2024, Open bid tab, 241496 ↗ |
| Manhole Adjusted To Grade | each | 3 | — | $450.00 | $450.00 – $1,000 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Pull Box, Misc.: Pull Box Adjusted To Grade | each | 2 | — | $525.00 | $525.00 – $725.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| No. 10 Awg Pole And Bracket Cable | linear foot | 2 | — | $1.65 | $1.50 – $1.65 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Light pole (install only), as per plan | each | 2 | — | $550.00 | $550.00 – $750.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| 4 Inch Concrete Walk, Decorative Surface, As Per Plan | square foot | 2 | — | $11.00 | $11.00 – $18.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Remove misc.: sign removed and reinstalled | each | 2 | — | $165.00 | $165.00 – $300.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Drive Apron Removed, As Per Plan | square yard | 2 | — | $13.85 | $13.85 – $50.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Special - Gas Valve Box Adjusted To Grade | each | 2 | — | $195.00 | $195.00 – $500.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Asphalt Concrete Surface Course, Type 1, (448), Pg64-22, As Per Plan | cubic yard | 2 | — | $300.00 | $200.00 – $300.00 | Dec 20, 2024, Open bid tab, 241496 ↗ |
| Light Pole Removed | each | 2 | — | $650.00 | $650.00 – $1,500 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Preconstruction Video Documentation | ls | 2 | — | $1,000 | $850.00 – $1,000 | Dec 20, 2024, Open bid tab, 241496 ↗ |
| No. 6 Awg 600 Volt Distribution Cable | linear foot | 2 | — | $2.75 | $2.75 – $3.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Connection, Unfused Permanent | each | 2 | — | $165.00 | $94.00 – $165.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Connection, Fused Pull Apart | each | 2 | — | $165.00 | $56.00 – $165.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Light Pole Foundation, As Per Plan | each | 2 | — | $2,625 | $2,000 – $2,625 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Service Box Adjusted To Grade | each | 2 | — | $240.00 | $240.00 – $300.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Curb, Type 6, As Per Plan | linear foot | 2 | — | $27.00 | $27.00 – $30.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| 4 inch concrete walk | square foot | 2 | — | $9.40 | $9.00 – $9.40 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Curb Removed | linear foot | 2 | — | $13.55 | $10.00 – $13.55 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Curb Ramp | square foot | 2 | — | $20.50 | $13.00 – $20.50 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Ground Rod | each | 2 | — | $265.00 | $242.00 – $265.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Maintaining Traffic | ls | 2 | — | $4,500 | $4,500 – $7,500 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Walk Removed | square foot | 2 | — | $1.10 | $1.10 – $2.75 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Single Chip Seal, Type B | square yard | 1 | — | $2.00 | $2.00 | Aug 18, 2023, Open bid tab, 231538 ↗ |
| Pavement milling, portland cement concrete, variable thick, as per plan | square yard | 1 | — | $3.50 | $3.50 | Aug 18, 2023, Open bid tab, 231538 ↗ |
| Pavement milling, asphalt concrete, variable thick, as per plan | square yard | 1 | — | $2.50 | $2.50 | Aug 18, 2023, Open bid tab, 231538 ↗ |
| Luminaire, install only, as per plan | each | 1 | — | $100.00 | $100.00 | Jul 30, 2021, Open bid tab, 210251 ↗ |
| Conduit, 1 Inch, 725.04 | linear foot | 1 | — | $11.00 | $11.00 | Jul 30, 2021, Open bid tab, 210251 ↗ |
| Pull Box, As Per Plan | each | 1 | — | $1,575 | $1,575 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Trench, 24 Inch Deep, As Per Plan | linear foot | 1 | — | $16.50 | $16.50 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Conduit, Jacked Or Drilled, 3 Inch, 725.04 | linear foot | 1 | — | $75.00 | $75.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| 6 Inch Non-Reinforced Concrete Drives And Aprons, Class Qc Ms | square yard | 1 | — | $75.60 | $75.60 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Special - tree removed, 4 inch-12 inch | each | 1 | — | $950.00 | $950.00 | Nov 13, 2023, Open bid tab, 230113 ↗ |
| Water service replace, as directed | each | 1 | — | $2,700 | $2,700 | Dec 20, 2024, Open bid tab, 241496 ↗ |
| Manhole Pipe Shelf Invert Repair, As Per Plan | square foot | 1 | — | $25.00 | $25.00 | Dec 20, 2024, Open bid tab, 241496 ↗ |
| Inlet, No. 3A, As Per Plan | each | 1 | — | $1,800 | $1,800 | Dec 20, 2024, Open bid tab, 241496 ↗ |