ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
1-1/2 inch asphalt concrete surface course, type 1, (449), pg64-22cubic yard3—$228.00$228.00Jul 10, 2025, Open bid tab, bidtabaugcri2401pdf ↗
Asphalt Concrete, Intermediate Course, Type 2 (449) Scratch Coursecubic yard3—$228.00$228.00Jul 10, 2025, Open bid tab, bidtabaugcri2401pdf ↗
1-1/2 inch pavement planning, asphalt concretesquare yard3—$7.00$7.00Jul 10, 2025, Open bid tab, bidtabaugcri2401pdf ↗
Non-Tracking Tack Coat, 0.10 Gal/S.Y.gallon3—$3.00$3.00Jul 10, 2025, Open bid tab, bidtabaugcri2401pdf ↗
Seeding And Mulching, Class 1, As Per Plansquare yard2—$2.99$1.50 – $2.99Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Subgrade Compactionsquare yard2—$0.62$0.62 – $0.75Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Clearing And Grubbing, As Per Planls2—$9,600$5,000 – $9,600Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
4 inch concrete walk, as per plansquare foot2—$18.04$6.75 – $18.04Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Non-Tracking Tack Coat, 0.06 Gal/S.Y.gallon2—$6.80$2.20 – $6.80Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Aggregate Base, As Per Plancubic yard2—$60.79$38.00 – $60.79Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Walk Removedsquare foot2—$1.88$0.5 – $1.88Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Removed, As Per Planls2—$3,919$3,919 – $5,000Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Manhole Adjusted To Grade, As Per Planeach1—$1,200$1,200Jul 10, 2025, Open bid tab, bidtabaugcri2401pdf ↗
Railroad Associated Cost For Flagman & Other Unknownsls1—$26,658$26,658Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Steel casing pipe install by boringlinear foot1—$691.78$691.78Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Water works, misc.: 6 inch water main reconnected, as per planeach1—$551.88$551.88Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Water works, misc.: 6 inch water main relocated, as per planlinear foot1—$137.73$137.73Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Meter Chamber Removed And Reseteach1—$831.45$831.45Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Type D Sanitary Sewer Manhole, As Per Planeach1—$10,277$10,277Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
6 inch sanitary sewer lateral repair, as per planlinear foot1—$179.23$179.23Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
15 inch pvc ps-35, sanitary sewer, as per planlinear foot1—$156.07$156.07Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
48 inch reinforced concrete pipe class-iii storm repairlinear foot1—$619.10$619.10Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
36 inch cpslp storm repairlinear foot1—$313.46$313.46Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
18 inch cpslp storm repairlinear foot1—$146.79$146.79Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
12 inch cpslp storm repairlinear foot1—$119.37$119.37Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
10 inch pvc sdr-35 storm repairlinear foot1—$117.40$117.40Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Manhole Abandonedeach1—$4,073$4,073Feb 8, 2024, Open bid tab, bidtabaugcri2304pdf ↗
Crosswalk Line, Type 1linear foot1—$60.00$60.00Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗
Stop Line, Type 1linear foot1—$65.00$65.00Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗
Center Line, Type 1mile1—$7,000$7,000Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗
Sanitary Sewer Manhole, Type D, As Per Planeach1—$7,500$7,500Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗
Sanitary Sewer Manhole, Type 3, As Per Planeach1—$4,250$4,250Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗
12 inch sanitary sewer, pvc sdr-26, as per planlinear foot1—$127.50$127.50Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗
12 inch sanitary sewer, pvc sdr-35, as per planlinear foot1—$125.00$125.00Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗
10 inch sanitary sewer, pvc sdr-26, as per planlinear foot1—$200.00$200.00Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗
8 inch sanitary sewer, pvc sdr-26, as per planlinear foot1—$150.00$150.00Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗
8 inch sanitary sewer, pvc sdr-35, as per planlinear foot1—$120.00$120.00Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗
6 inch sanitary sewer lateral, pvc sdr-35, as per planlinear foot1—$75.00$75.00Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗
4 inch sanitary sewer lateral, pvc sdr-35, as per planlinear foot1—$52.50$52.50Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗
4 inch conduit, type b, as per planlinear foot1—$55.00$55.00Oct 13, 2021, Open bid tab, bidtabaugcri1704pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.