| Seeding And Mulching, Class 1, As Per Plan | square yard | 2 | — | $2.00 | $2.00 – $65.24 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Valve Box Removed | each | 2 | — | $170.30 | $170.30 – $237.31 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Subgrade Compaction | square yard | 2 | — | $1.80 | $0.8 – $1.80 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Maintaining Traffic | ls | 2 | — | $26,334 | $11,708 – $26,334 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Removed, As Per Plan | ls | 2 | — | $175,282 | $1,740 – $175,282 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Brick Pavers Remove And Reset | square foot | 1 | — | $8.20 | $8.20 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Stone Landscaping Wall Removed And Reset | linear foot | 1 | — | $27.40 | $27.40 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Concrete step replace | square foot | 1 | — | $105.70 | $105.70 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Concrete Retaining Wall Repair | linear foot | 1 | — | $105.70 | $105.70 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Water Meter Chamber Removed | each | 1 | — | $412.50 | $412.50 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 2 inch private water service branch, as per plan | linear foot | 1 | — | $138.70 | $138.70 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 3/4 inch private water service branch, as per plan | linear foot | 1 | — | $38.30 | $38.30 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 3/4 inch public water service branch, as per plan | linear foot | 1 | — | $206.70 | $206.70 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 6 inch insertion valve | each | 1 | — | $10,265 | $10,265 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 4 inch insertion valve | each | 1 | — | $9,987 | $9,987 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Existing Manhole Adjusted To Grade | each | 1 | — | $613.60 | $613.60 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 4 inch sanitary sewer lateral repair | linear foot | 1 | — | $48.00 | $48.00 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Concerte sidewalk replace in-kind (private) | square foot | 1 | — | $11.00 | $11.00 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 6 inch non-reinforced portland cement concrete pavement (private) | square yard | 1 | — | $160.00 | $160.00 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Asphalt Driveway Repair In-Kind (Private) (Contingency) | square foot | 1 | — | $3.00 | $3.00 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Single Chip Seal | square yard | 1 | — | $3.20 | $3.20 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Gravel Driveway Repair (Private) | cubic yard | 1 | — | $49.10 | $49.10 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Pavement planning, 1-1/2 inch | square yard | 1 | — | $1.70 | $1.70 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 10 inch insertion valve, as per plan | each | 1 | — | $14,031 | $14,031 | Jul 21, 2023, Open bid tab, bidtabputcgr2204pdf ↗ |
| Curb Repaired, In-Kind | linear foot | 1 | — | $11.83 | $11.83 | Jul 21, 2023, Open bid tab, bidtabputcgr2204pdf ↗ |
| Walk Repaired, In-Lind | square foot | 1 | — | $4.73 | $4.73 | Jul 21, 2023, Open bid tab, bidtabputcgr2204pdf ↗ |
| Interior - Protective Coating System For Elevated Water Tank - System A | ls | 1 | — | $134,000 | $134,000 | Feb 18, 2021, Open bid tab, bidtabputcgr2101pdf ↗ |
| 6 inch sanitary sewer lateral repair | linear foot | 1 | — | $50.00 | $50.00 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 4 inch concrete walk (in-kind) | square foot | 1 | — | $20.90 | $20.90 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 10 inch conduit, type b, 707.45, as per plan | linear foot | 1 | — | $46.00 | $46.00 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 12 inch insertion valve | each | 1 | — | $18,161 | $18,161 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Water Meter Relocation, As Per Plan | each | 1 | — | $824.90 | $824.90 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 8 inch non-reinforced concrete pavement | square yard | 1 | — | $146.90 | $146.90 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 12 inch awwa c-900 dr-18 water main, as per plan | linear foot | 1 | — | $700.20 | $700.20 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 6 inch insertion valve, as per plan | each | 1 | — | $9,381 | $9,381 | Jul 21, 2023, Open bid tab, bidtabputcgr2204pdf ↗ |
| 10 inchx8 inch tapping sleeve and valve | each | 1 | — | $7,143 | $7,143 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 6 inch awwa c-900 dr-18 water main, as per plan | linear foot | 1 | — | $561.30 | $561.30 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| 4 inch awwa c-900 dr-18 water main, as per plan | linear foot | 1 | — | $391.00 | $391.00 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |
| Asphalt Concrete Base | cubic yard | 1 | — | $228.30 | $228.30 | Jul 21, 2023, Open bid tab, bidtabputcgr2204pdf ↗ |
| Fire Hydrant Assembly, As Per Plan | each | 1 | — | $7,677 | $7,677 | May 8, 2025, Open bid tab, bidtabputcgr2401pdf ↗ |