| Detectable Warnings Sq | linear foot | 7 | $31.50 | $31.50 | $28.00 – $50.00 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Driveway pavement remove sq | yd | 7 | $15.00 | $15.00 | $1.00 – $45.00 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Asphalt materials (tack coat) | pound | 5 | — | $0.1 | $0.01 – $5.00 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Thermoplastic pavement marking - line 24 inch | linear foot | 4 | — | $7.35 | $6.00 – $13.20 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Thermoplastic pavement marking - line 6 inch | linear foot | 4 | — | $1.94 | $1.50 – $3.30 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Sidewalk remove sq | linear foot | 4 | — | $2.00 | $2.00 – $5.00 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Hot-mix asphalt surface remove, butt joint sq | yd | 4 | — | $6.00 | $6.00 – $10.00 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Trench Backfill Cu | yd | 4 | — | $11.00 | $11.00 – $60.00 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Inlet Filters | each | 4 | — | $150.00 | $120.00 – $300.00 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Drainage and utility structure to be reconstructed | each | 3 | — | $1,050 | $1,050 – $2,150 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Drainage and utility structure to be adjusted | each | 3 | — | $840.00 | $740.00 – $985.00 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Thermoplastic pavement marking - line 4 inch | linear foot | 3 | — | $1.60 | $1.00 – $1.60 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Aggregate base course remove and replace, 12 inch sq | yd | 3 | — | $40.00 | $1.00 – $40.00 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Class D Patches, 6 Inch Sq | yd | 3 | — | $45.00 | $20.00 – $57.00 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Hot-mix asphalt surface remove, 2-1/4 inch sq | yd | 3 | — | $1.95 | $1.95 – $2.00 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Polymerized Hot-Mix Asphalt Binder Course, Il-4.75, N50 | ton | 3 | — | $100.74 | $100.74 – $108.00 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Topsoil furnish and place, 4 inch sq | yd | 3 | — | $6.60 | $6.60 – $20.00 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Portland cement concrete sidewalk, 5 inch sq | linear foot | 3 | — | $7.70 | $7.70 – $10.50 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Frames And Grates To Be Adjusted | each | 3 | — | $760.00 | $358.00 – $760.00 | May 22, 2025, Open bid tab, contract 2798 ↗ |
| Pavement remove sq | yd | 3 | — | $12.00 | $8.00 – $15.00 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Remove and disposal of unsuitable material cu | yd | 3 | — | $40.00 | $21.00 – $100.00 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Hot-Mix Asphalt Surface Course, Il-9.5, Mix "D", N50 | ton | 3 | — | $84.42 | $84.42 – $200.00 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Combination curb and gutter remove | linear foot | 3 | — | $10.00 | $8.00 – $30.00 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Supplemental Watering | unit | 3 | — | $55.00 | $0.01 – $100.00 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Traffic Control And Protection, Standard 701501 L | sum | 2 | — | $14,891 | $14,891 – $22,500 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Thermoplastic pavement marking, line 12 inch | linear foot | 2 | — | $3.67 | $3.67 – $4.10 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Combination concrete curb & gutter remove and replace | linear foot | 2 | — | $47.25 | $39.00 – $47.25 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Portland cement concrete sidewalk remove and replace, 5 inch sq | linear foot | 2 | — | $13.65 | $10.80 – $13.65 | May 5, 2026, Open bid tab, contract 3500 ↗ |
| Traffic Control And Protection, (Special) L | sum | 2 | — | $35,000 | $25,000 – $35,000 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Mobilization L | sum | 2 | — | $98,000 | $20,000 – $98,000 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Catch Basins, Type C, Type 11 Frame And Grate | each | 2 | — | $2,838 | $2,200 – $2,838 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Thermoplastic Pavement Marking - Letters And Symbols Sq | linear foot | 2 | — | $6.40 | $6.00 – $6.40 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Portland cement concrete driveway pavement, 6 inch sq | yd | 2 | — | $83.00 | $20.00 – $83.00 | May 22, 2025, Open bid tab, contract 2798 ↗ |
| Subbase granular material, type b, 6 inch sq | yd | 2 | — | $10.00 | $10.00 – $12.00 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Sodding Sq | yd | 2 | — | $30.00 | $12.00 – $30.00 | Jun 26, 2025, Open bid tab, contract 2865 ↗ |
| Fire Hydrant With Auxiliary Valve And Valve Box | each | 2 | — | $17,820 | $4,710 – $17,820 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Fire Hydrants To Be Removed | each | 2 | — | $110.00 | $110.00 – $870.00 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |
| Water valve | each | 2 | — | $3,000 | $2,310 – $3,000 | Jul 3, 2024, Open bid tab, contract 2396 ↗ |
| Porous Granular Embankment Cu | yd | 2 | — | $60.00 | $48.00 – $60.00 | Jul 3, 2024, Open bid tab, contract 2396 ↗ |
| Earth Excavation Cu | yd | 2 | — | $43.00 | $41.00 – $43.00 | Mar 30, 2026, Open bid tab, contract 3401 ↗ |