Village of Carpentersville: awarded unit prices

339 winning bid prices read from 9 source documents, 2021–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Village of Carpentersville

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Detectable Warnings Sqlinear foot7$31.50$31.50$28.00 – $50.00May 5, 2026, Open bid tab, contract 3500 ↗
Driveway pavement remove sqyd7$15.00$15.00$1.00 – $45.00May 5, 2026, Open bid tab, contract 3500 ↗
Asphalt materials (tack coat)pound5—$0.1$0.01 – $5.00May 5, 2026, Open bid tab, contract 3500 ↗
Thermoplastic pavement marking - line 24 inchlinear foot4—$7.35$6.00 – $13.20May 5, 2026, Open bid tab, contract 3500 ↗
Thermoplastic pavement marking - line 6 inchlinear foot4—$1.94$1.50 – $3.30May 5, 2026, Open bid tab, contract 3500 ↗
Sidewalk remove sqlinear foot4—$2.00$2.00 – $5.00Mar 30, 2026, Open bid tab, contract 3401 ↗
Hot-mix asphalt surface remove, butt joint sqyd4—$6.00$6.00 – $10.00May 5, 2026, Open bid tab, contract 3500 ↗
Trench Backfill Cuyd4—$11.00$11.00 – $60.00Mar 30, 2026, Open bid tab, contract 3401 ↗
Inlet Filterseach4—$150.00$120.00 – $300.00Mar 30, 2026, Open bid tab, contract 3401 ↗
Drainage and utility structure to be reconstructedeach3—$1,050$1,050 – $2,150May 5, 2026, Open bid tab, contract 3500 ↗
Drainage and utility structure to be adjustedeach3—$840.00$740.00 – $985.00May 5, 2026, Open bid tab, contract 3500 ↗
Thermoplastic pavement marking - line 4 inchlinear foot3—$1.60$1.00 – $1.60Mar 30, 2026, Open bid tab, contract 3401 ↗
Aggregate base course remove and replace, 12 inch sqyd3—$40.00$1.00 – $40.00May 5, 2026, Open bid tab, contract 3500 ↗
Class D Patches, 6 Inch Sqyd3—$45.00$20.00 – $57.00May 5, 2026, Open bid tab, contract 3500 ↗
Hot-mix asphalt surface remove, 2-1/4 inch sqyd3—$1.95$1.95 – $2.00May 5, 2026, Open bid tab, contract 3500 ↗
Polymerized Hot-Mix Asphalt Binder Course, Il-4.75, N50ton3—$100.74$100.74 – $108.00May 5, 2026, Open bid tab, contract 3500 ↗
Topsoil furnish and place, 4 inch sqyd3—$6.60$6.60 – $20.00Mar 30, 2026, Open bid tab, contract 3401 ↗
Portland cement concrete sidewalk, 5 inch sqlinear foot3—$7.70$7.70 – $10.50Mar 30, 2026, Open bid tab, contract 3401 ↗
Frames And Grates To Be Adjustedeach3—$760.00$358.00 – $760.00May 22, 2025, Open bid tab, contract 2798 ↗
Pavement remove sqyd3—$12.00$8.00 – $15.00Mar 30, 2026, Open bid tab, contract 3401 ↗
Remove and disposal of unsuitable material cuyd3—$40.00$21.00 – $100.00Mar 30, 2026, Open bid tab, contract 3401 ↗
Hot-Mix Asphalt Surface Course, Il-9.5, Mix "D", N50ton3—$84.42$84.42 – $200.00May 5, 2026, Open bid tab, contract 3500 ↗
Combination curb and gutter removelinear foot3—$10.00$8.00 – $30.00Mar 30, 2026, Open bid tab, contract 3401 ↗
Supplemental Wateringunit3—$55.00$0.01 – $100.00Mar 30, 2026, Open bid tab, contract 3401 ↗
Traffic Control And Protection, Standard 701501 Lsum2—$14,891$14,891 – $22,500May 5, 2026, Open bid tab, contract 3500 ↗
Thermoplastic pavement marking, line 12 inchlinear foot2—$3.67$3.67 – $4.10May 5, 2026, Open bid tab, contract 3500 ↗
Combination concrete curb & gutter remove and replacelinear foot2—$47.25$39.00 – $47.25May 5, 2026, Open bid tab, contract 3500 ↗
Portland cement concrete sidewalk remove and replace, 5 inch sqlinear foot2—$13.65$10.80 – $13.65May 5, 2026, Open bid tab, contract 3500 ↗
Traffic Control And Protection, (Special) Lsum2—$35,000$25,000 – $35,000Mar 30, 2026, Open bid tab, contract 3401 ↗
Mobilization Lsum2—$98,000$20,000 – $98,000Mar 30, 2026, Open bid tab, contract 3401 ↗
Catch Basins, Type C, Type 11 Frame And Grateeach2—$2,838$2,200 – $2,838Mar 30, 2026, Open bid tab, contract 3401 ↗
Thermoplastic Pavement Marking - Letters And Symbols Sqlinear foot2—$6.40$6.00 – $6.40Mar 30, 2026, Open bid tab, contract 3401 ↗
Portland cement concrete driveway pavement, 6 inch sqyd2—$83.00$20.00 – $83.00May 22, 2025, Open bid tab, contract 2798 ↗
Subbase granular material, type b, 6 inch sqyd2—$10.00$10.00 – $12.00Mar 30, 2026, Open bid tab, contract 3401 ↗
Sodding Sqyd2—$30.00$12.00 – $30.00Jun 26, 2025, Open bid tab, contract 2865 ↗
Fire Hydrant With Auxiliary Valve And Valve Boxeach2—$17,820$4,710 – $17,820Mar 30, 2026, Open bid tab, contract 3401 ↗
Fire Hydrants To Be Removedeach2—$110.00$110.00 – $870.00Mar 30, 2026, Open bid tab, contract 3401 ↗
Water valveeach2—$3,000$2,310 – $3,000Jul 3, 2024, Open bid tab, contract 2396 ↗
Porous Granular Embankment Cuyd2—$60.00$48.00 – $60.00Jul 3, 2024, Open bid tab, contract 2396 ↗
Earth Excavation Cuyd2—$43.00$41.00 – $43.00Mar 30, 2026, Open bid tab, contract 3401 ↗