Agency · awarded bid prices

Village of Carey: awarded unit prices

196 winning bid prices read from 15 source documents, 2022–2025. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Village of Carey

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Asphalt Concrete Surface Course, Type 1, (449), Pg64-22cubic yard15$215.00$237.00$210.00 – $260.97Apr 2, 2025, Open bid tab, bidtabwyacar2401pdf-s0 ↗
Maintaining Trafficls15—$1,400$255.00 – $2,000Apr 2, 2025, Open bid tab, bidtabwyacar2401pdf-s0 ↗
Stop line, 24 inch, whitelinear foot12$18.00$20.00$10.00 – $20.00Apr 2, 2025, Open bid tab, bidtabwyacar2401pdf-s0 ↗
Manhole Adjusted To Gradeeach12$650.00$650.00$440.00 – $876.00Apr 2, 2025, Open bid tab, bidtabwyacar2401pdf-s0 ↗
Crosswalk line, 12 inch, whitelinear foot11$6.00$7.00$4.00 – $7.00Apr 2, 2025, Open bid tab, bidtabwyacar2401pdf-s0 ↗
Non-Tracking Tack Coat (Applied At 0.09 Gal/Sy)gals9$2.50$2.60$2.50 – $2.60Apr 2, 2025, Open bid tab, bidtabwyacar2401pdf-s0 ↗
Valve Adjusted To Gradeeach8$100.00$60.00$60.00 – $450.00Apr 2, 2025, Open bid tab, bidtabwyacar2401pdf-s0 ↗
Asphalt Concrete Intermediate Course, Type 1, (449) Pg 64-22cubic yard5$210.00$210.00$210.00Jun 8, 2022, Open bid tab, bidtabwyacar2201pdf-s0 ↗
Non-Tracking Tack Coat (Applied At 0.10 Gal/Sy)gals5$2.10$2.10$2.10Jun 8, 2022, Open bid tab, bidtabwyacar2201pdf-s0 ↗
1-1/2 inch± pavement milling, asphalt concretesquare yard5$1.65$1.65$1.65Apr 13, 2023, Open bid tab, bidtabwyacar2302pdf-s0 ↗
Catch Basin Adjusted To Gradeeach4—$850.00$741.00 – $850.00Apr 2, 2025, Open bid tab, bidtabwyacar2401pdf-s0 ↗
Crosswalk line, 24 inch, whitelinear foot2—$10.00$10.00Apr 13, 2023, Open bid tab, bidtabwyacar2302pdf-s0 ↗
West north street (n. lake street to n. vance street) 254 1-1/2 inch± pavement milling, asphalt concretesquare yard1—$2.25$2.25Apr 2, 2025, Open bid tab, bidtabwyacar2401pdf-s3 ↗
Orchard court (cul-de-sac to 1 orchard court) 254 variable deep pavement milling, asphalt concretesquare yard1—$13.00$13.00Apr 2, 2025, Open bid tab, bidtabwyacar2401pdf-s2 ↗
South lake street (clay street to w. findlay street) 254 1-1/2 inch± pavement milling, asphalt concretesquare yard1—$2.25$2.25Apr 2, 2025, Open bid tab, bidtabwyacar2401pdf-s1 ↗
Clay street (shrine park to s. muncie street) 254 1-1/2 inch± pavement milling, asphalt concretesquare yard1—$2.25$2.25Apr 2, 2025, Open bid tab, bidtabwyacar2401pdf-s0 ↗
Parking lot stall marking, 4 inch , whitelinear foot1—$3.00$3.00Apr 13, 2023, Open bid tab, bidtabwyacar2302pdf-s2 ↗
Columbus street (east findlay street to end) 254 1-1/2 inch± pavement milling, asphalt concretesquare yard1—$2.15$2.15Jun 8, 2022, Open bid tab, bidtabwyacar2201pdf-s4 ↗
Alley between frederick & grove streets (south patterson street to end) 254 1-1/2 inch± pavement milling, asphalt concretesquare yard1—$2.15$2.15Jun 8, 2022, Open bid tab, bidtabwyacar2201pdf-s3 ↗
Adams street (grove street to end) 254 1-1/2 inch± pavement milling, asphalt concretesquare yard1—$2.15$2.15Jun 8, 2022, Open bid tab, bidtabwyacar2201pdf-s2 ↗
Grove street (south patterson street to high street) 254 1-1/2 inch± pavement milling, asphalt concretesquare yard1—$2.15$2.15Jun 8, 2022, Open bid tab, bidtabwyacar2201pdf-s1 ↗
Frederick street (south patterson street to end) 254 1-1/2 inch± pavement milling, asphalt concretesquare yard1—$2.15$2.15Jun 8, 2022, Open bid tab, bidtabwyacar2201pdf-s0 ↗
4 inch parking lot stall marking (white)linear foot1—$6.65$6.65Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
4 inch parking lot stall marking (yellow)linear foot1—$5.55$5.55Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
8 inch pvc water main, as per planlinear foot1—$106.96$106.96Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
6 inch pvc water main, as per planlinear foot1—$230.54$230.54Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
8 inch sump drain, as per planlinear foot1—$17.46$17.46Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
6 inch sump drain, as per planlinear foot1—$12.71$12.71Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
Walkway Misc.: Remove And Reset Brick Paverssquare foot1—$30.98$30.98Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
Rock Channel Protection, Type "B"cubic yard1—$175.29$175.29Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
Remove misc.: guardrail removed and resetlinear foot1—$72.39$72.39Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
24 inch crosswalk linelinear foot1—$8.88$8.88Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
12 inch crosswalk linelinear foot1—$6.62$6.62Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
Type 6 Barrier Curb Replaced (In Kind)linear foot1—$22.21$22.21Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
Variable deep pavement milling, asphalt concretesquare yard1—$2.15$2.15Jun 8, 2022, Open bid tab, bidtabwyacar2201pdf-s0 ↗
Sanitary Sewer Manhole Adjusted To Gradeeach1—$1,165$1,165Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
Water works, misc.: 8 inch water main reconnected, as per planeach1—$5,360$5,360Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
1-1/2 pavement milling, asphalt concretesquare yard1—$15.82$15.82Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
4 inch shallow pipe underdrains, 707.31 (perforated), as per planlinear foot1—$7.40$7.40Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗
4 inch shallow pipe underdrains, 707.41 (non-perforated), as per planlinear foot1—$8.52$8.52Mar 28, 2024, Open bid tab, bidtabwyacar2105pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Ohio: statewide figures.