| Special - Erosion And Sediment Control | ls | 1 | — | $1,500 | $1,500 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Water Work, Misc.: Per Drawings | ls | 1 | — | $45,928 | $45,928 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 10 Inch X 8 Inch Cutting-In Tee W/ Long Sleeve, As Per Plan | each | 1 | — | $3,775 | $3,775 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 8 Inch X 6 Inch Cutting-In Tee W/ Long Sleeve, As Per Plan | each | 1 | — | $2,800 | $2,800 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 8 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $2,231 | $2,231 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 2 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $1,800 | $1,800 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Valve Box Removed For Storage, As Per Plan | each | 1 | — | $400.00 | $400.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 3/4 Inch Polyethylene Service Branch | linear foot | 1 | — | $25.00 | $25.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 1 Inch Corp Stop And Tap And Curb Stop And Valve Box, As Per Plan | each | 1 | — | $1,200 | $1,200 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 1 Inch Copper Service Branch | linear foot | 1 | — | $50.00 | $50.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 3/4 Inch Corp Stop And Saddle And Curb Stop And Valve Box, As Per Plan | each | 1 | — | $980.00 | $980.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 4 inch water main polyvinyl chloride pipe and fitting, awwa c909, pvco, as per plan | linear foot | 1 | — | $90.00 | $90.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 2 inch water main with fitting, polyethylene | linear foot | 1 | — | $65.00 | $65.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Asphalt Concrete Intermediate Course, Type 1, (448) | cubic yard | 1 | — | $295.00 | $295.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 6 inch water main polyvinyl chloride pipe and fitting, awwa c909 pvco, as per plan | linear foot | 1 | — | $85.75 | $85.75 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Fire Hydrant Removed For Storage, As Per Plan | each | 1 | — | $800.00 | $800.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 8 inch water main polyvinyl chloride pipe and fitting, awwa c909 pvco, as per plan | linear foot | 1 | — | $95.00 | $95.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 6 Inch Fire Hydrant Assembly, Including 6 Inch Valve And Valve Box, As Per Plan | each | 1 | — | $7,000 | $7,000 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 6 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $1,850 | $1,850 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 4 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $1,515 | $1,515 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Connect New Water Main To Existing Water Main, As Per Plan | each | 1 | — | $3,000 | $3,000 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Tree Removed, 30 Inch Size | each | 1 | — | $500.00 | $500.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Pavement Removed | square yard | 1 | — | $1.00 | $1.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Asphalt Concrete Surface Course, Type 1, (448), Pg64-22 | cubic yard | 1 | — | $325.00 | $325.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Construction Layout Stakes And Surveying | ls | 1 | — | $8,000 | $8,000 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Curb, Type 6 | linear foot | 1 | — | $20.00 | $20.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 6 inch non-reinforced concrete pavement, as per plan | square yard | 1 | — | $58.00 | $58.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| 4 inch concrete walk | square foot | 1 | — | $10.00 | $10.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Curb Removed | linear foot | 1 | — | $2.50 | $2.50 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Asphalt Concrete Base, Pg64-22 | cubic yard | 1 | — | $205.00 | $205.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Maintaining Traffic | ls | 1 | — | $50,000 | $50,000 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Walk Removed | square foot | 1 | — | $1.50 | $1.50 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Aggregate Base | cubic yard | 1 | — | $55.00 | $55.00 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Tack Coat | gallon | 1 | — | $3.60 | $3.60 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Mobilization | ls | 1 | — | $41,798 | $41,798 | Aug 2, 2023, Open bid tab, 220504 ↗ |
| Clearing and Grubbing | ls | 1 | — | $12,500 | $12,500 | Aug 2, 2023, Open bid tab, 220504 ↗ |