| Maintaining Traffic | ls | 11 | — | $15,490 | $333.88 – $25,000 | Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗ |
| Erosion Control | each | 10 | $1.00 | $1.00 | $1.00 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Removed, As Per Plan | ls | 10 | $2,000 | $400.00 | $100.00 – $19,086 | Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗ |
| Aggregate Base | cubic yard | 9 | $42.00 | $145.82 | $25.00 – $145.82 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Non-Tracking Tack Coat | gallon | 8 | $10.00 | $3.48 | $3.48 – $20.00 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Asphalt Concrete Surface Course, Type 1, (449), Pg64-22 | cubic yard | 7 | $400.00 | $291.07 | $291.07 – $550.00 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Subgrade Compaction | square yard | 7 | $1.00 | $1.50 | $0.31 – $1.50 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Clearing and Grubbing | ls | 7 | $1,153 | $278.23 | $278.23 – $10,000 | Sep 5, 2024, Open bid tab, bidtaballblu2301pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 6 | $15.49 | $54.00 | $5.00 – $54.00 | Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 6 | $9.57 | $50.00 | $5.00 – $50.00 | Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗ |
| Asphalt Concrete Intermediate Course, Type 2, (449) | cubic yard | 5 | $400.00 | $568.23 | $263.86 – $568.23 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 5 | $1.50 | $1.50 | $1.00 – $4.32 | Jul 11, 2024, Open bid tab, bidtabhanblu2201pdf ↗ |
| 6 inch fire hydrant assembly, as per plan | each | 5 | $6,250 | $9,780 | $5,800 – $9,780 | Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 5 | $5.54 | $46.00 | $5.00 – $46.00 | Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗ |
| Walk Removed | square foot | 5 | $1.19 | $1.47 | $1.00 – $1.47 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Meter pit, including setting and valve, as per plan | each | 4 | — | $900.00 | $494.40 – $1,000 | Jul 11, 2024, Open bid tab, bidtabhanblu2201pdf ↗ |
| 3/4 inch water service branch, as per plan (cts plastic) | linear foot | 4 | — | $40.00 | $34.23 – $42.00 | Jun 9, 2023, Open bid tab, bidtaballblu2204garaupdf ↗ |
| Remove of ground mounted post support and disposal | each | 4 | — | $28.99 | $15.00 – $354.00 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Curb, Type 6 | linear foot | 4 | — | $21.59 | $21.59 – $40.00 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Cut And Plug, As Per Plan | each | 4 | — | $700.00 | $445.07 – $750.00 | Jun 9, 2023, Open bid tab, bidtaballblu2204garaupdf ↗ |
| Curb Removed | linear foot | 4 | — | $9.60 | $2.45 – $10.50 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 4 | — | $600.00 | $600.00 – $17,000 | Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗ |
| Remove of ground mounted sign and reerection | each | 4 | — | $86.97 | $75.00 – $654.00 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Ground Mounted Support, No. 3 Post | linear foot | 4 | — | $17.39 | $15.00 – $102.00 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Asphalt Concrete Base, Pg64-22, (449) | cubic yard | 3 | — | $343.26 | $246.16 – $343.26 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| 9 inch non-reinforced concrete pavement, class qc 1p, as per plan | square yard | 3 | — | $113.92 | $72.00 – $113.92 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| 6 inch non-reinforced concrete pavement, class qc 1p, as per plan | square yard | 3 | — | $84.93 | $56.00 – $84.93 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Excavation, As Per Plan | cubic yard | 3 | — | $52.01 | $15.00 – $52.01 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Pavement Removed, Concrete | square yard | 3 | — | $14.22 | $9.00 – $18.00 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Remove of ground mounted sign and disposal | each | 3 | — | $57.98 | $15.00 – $57.98 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Sign, Flat Sheet | square foot | 3 | — | $46.39 | $30.00 – $46.39 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Sanitary Sewer Lateral Repair, As Per Plan | linear foot | 3 | — | $125.00 | $38.30 – $125.00 | Jun 9, 2023, Open bid tab, bidtaballblu2204garaupdf ↗ |
| Fire Hydrant Removed | each | 3 | — | $400.00 | $200.00 – $400.00 | Jul 11, 2024, Open bid tab, bidtabhanblu2201pdf ↗ |
| Construction Layout Stakes And Surveying, As Per Plan | ls | 3 | — | $1,500 | $1,500 – $2,115 | Jun 9, 2023, Open bid tab, bidtaballblu2204garaupdf ↗ |
| Valve Box Removed | each | 3 | — | $50.00 | $50.00 – $106.69 | Jul 11, 2024, Open bid tab, bidtabhanblu2201pdf ↗ |
| Curb Ramp | square foot | 3 | — | $13.04 | $8.23 – $13.04 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| 12 inch conduit, type b, as per plan | linear foot | 3 | — | $75.00 | $43.73 – $75.00 | Jul 11, 2024, Open bid tab, bidtabhanblu2201pdf ↗ |
| 4 inch concrete walk, as per plan | square foot | 3 | — | $8.00 | $5.50 – $8.26 | Jun 9, 2023, Open bid tab, bidtaballblu2204garaupdf ↗ |
| Excavation Of Subgrade, As Per Plan | cubic yard | 3 | — | $75.38 | $15.00 – $75.38 | Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗ |
| Curb And Gutter Removed | linear foot | 3 | — | $17.50 | $2.00 – $17.50 | Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗ |