ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Maintaining Trafficls11—$15,490$333.88 – $25,000Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗
Erosion Controleach10$1.00$1.00$1.00Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Removed, As Per Planls10$2,000$400.00$100.00 – $19,086Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗
Aggregate Basecubic yard9$42.00$145.82$25.00 – $145.82Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Non-Tracking Tack Coatgallon8$10.00$3.48$3.48 – $20.00Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Asphalt Concrete Surface Course, Type 1, (449), Pg64-22cubic yard7$400.00$291.07$291.07 – $550.00Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Subgrade Compactionsquare yard7$1.00$1.50$0.31 – $1.50Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Clearing and Grubbingls7$1,153$278.23$278.23 – $10,000Sep 5, 2024, Open bid tab, bidtaballblu2301pdf ↗
8 inch conduit, type b, 707.45, storm repairlinear foot6$15.49$54.00$5.00 – $54.00Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗
6 inch conduit, type b, 707.45, storm repairlinear foot6$9.57$50.00$5.00 – $50.00Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗
Asphalt Concrete Intermediate Course, Type 2, (449)cubic yard5$400.00$568.23$263.86 – $568.23Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Seeding And Mulching, Class 1, As Per Plansquare yard5$1.50$1.50$1.00 – $4.32Jul 11, 2024, Open bid tab, bidtabhanblu2201pdf ↗
6 inch fire hydrant assembly, as per planeach5$6,250$9,780$5,800 – $9,780Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗
4 inch conduit, type b, 707.45, storm repairlinear foot5$5.54$46.00$5.00 – $46.00Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗
Walk Removedsquare foot5$1.19$1.47$1.00 – $1.47Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Meter pit, including setting and valve, as per planeach4—$900.00$494.40 – $1,000Jul 11, 2024, Open bid tab, bidtabhanblu2201pdf ↗
3/4 inch water service branch, as per plan (cts plastic)linear foot4—$40.00$34.23 – $42.00Jun 9, 2023, Open bid tab, bidtaballblu2204garaupdf ↗
Remove of ground mounted post support and disposaleach4—$28.99$15.00 – $354.00Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Curb, Type 6linear foot4—$21.59$21.59 – $40.00Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Cut And Plug, As Per Planeach4—$700.00$445.07 – $750.00Jun 9, 2023, Open bid tab, bidtaballblu2204garaupdf ↗
Curb Removedlinear foot4—$9.60$2.45 – $10.50Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Clearing And Grubbing, As Per Planls4—$600.00$600.00 – $17,000Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗
Remove of ground mounted sign and reerectioneach4—$86.97$75.00 – $654.00Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Ground Mounted Support, No. 3 Postlinear foot4—$17.39$15.00 – $102.00Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Asphalt Concrete Base, Pg64-22, (449)cubic yard3—$343.26$246.16 – $343.26Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
9 inch non-reinforced concrete pavement, class qc 1p, as per plansquare yard3—$113.92$72.00 – $113.92Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
6 inch non-reinforced concrete pavement, class qc 1p, as per plansquare yard3—$84.93$56.00 – $84.93Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Excavation, As Per Plancubic yard3—$52.01$15.00 – $52.01Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Pavement Removed, Concretesquare yard3—$14.22$9.00 – $18.00Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Remove of ground mounted sign and disposaleach3—$57.98$15.00 – $57.98Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Sign, Flat Sheetsquare foot3—$46.39$30.00 – $46.39Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Sanitary Sewer Lateral Repair, As Per Planlinear foot3—$125.00$38.30 – $125.00Jun 9, 2023, Open bid tab, bidtaballblu2204garaupdf ↗
Fire Hydrant Removedeach3—$400.00$200.00 – $400.00Jul 11, 2024, Open bid tab, bidtabhanblu2201pdf ↗
Construction Layout Stakes And Surveying, As Per Planls3—$1,500$1,500 – $2,115Jun 9, 2023, Open bid tab, bidtaballblu2204garaupdf ↗
Valve Box Removedeach3—$50.00$50.00 – $106.69Jul 11, 2024, Open bid tab, bidtabhanblu2201pdf ↗
Curb Rampsquare foot3—$13.04$8.23 – $13.04Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
12 inch conduit, type b, as per planlinear foot3—$75.00$43.73 – $75.00Jul 11, 2024, Open bid tab, bidtabhanblu2201pdf ↗
4 inch concrete walk, as per plansquare foot3—$8.00$5.50 – $8.26Jun 9, 2023, Open bid tab, bidtaballblu2204garaupdf ↗
Excavation Of Subgrade, As Per Plancubic yard3—$75.38$15.00 – $75.38Aug 21, 2025, Open bid tab, bidtaballblu2406pdf ↗
Curb And Gutter Removedlinear foot3—$17.50$2.00 – $17.50Jul 23, 2026, Open bid tab, bidtabhanblu2601pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.