| Fire Hydrant Assembly Removed | each | 6 | $500.00 | $500.00 | $25.00 – $500.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 6 inch fire hydrant assembly, as per plan | each | 6 | $6,726 | $8,000 | $6,000 – $8,000 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Valve Box Removed | each | 6 | $100.00 | $100.00 | $50.00 – $100.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Maintaining Traffic | ls | 6 | $5,500 | $5,000 | $1,500 – $12,000 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 6 | $100.00 | $100.00 | $70.00 – $200.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Removed, As Per Plan | ls | 6 | — | $1,000 | $1.00 – $1,614 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 5 | $2.00 | $4.00 | $1.00 – $4.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Construction Layout Stakes And Surveying, As Per Plan | ls | 5 | $2,500 | $5,000 | $2,000 – $6,000 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Full deep pavement repair, as per plan | square yard | 5 | $100.00 | $100.00 | $50.00 – $101.65 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Remove of ground mounted sign and reerection | each | 5 | $500.00 | $500.00 | $50.00 – $1,000 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Curb And Gutter Removed | linear foot | 5 | $6.00 | $6.00 | $5.00 – $10.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Catch Basin Removed | each | 4 | — | $200.00 | $100.00 – $200.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 2 inch pavement milling, asphalt concrete | square yard | 4 | — | $5.00 | $4.00 – $6.50 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Curb And Gutter Replaced (In-Kind) | linear foot | 4 | — | $40.00 | $40.00 – $100.00 | Feb 24, 2023, Open bid tab, bidtabclibla2108pdf ↗ |
| Asphalt Concrete Base, Pg64-22 | cubic yard | 4 | — | $200.00 | $90.00 – $230.00 | Feb 24, 2023, Open bid tab, bidtabclibla2108pdf ↗ |
| Valve Box Adjusted To Grade | each | 4 | — | $200.00 | $10.00 – $200.00 | Feb 24, 2023, Open bid tab, bidtabclibla2108pdf ↗ |
| Manhole Adjusted To Grade | each | 4 | — | $400.00 | $300.00 – $500.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Walk Removed | square foot | 4 | — | $10.00 | $2.00 – $10.00 | Feb 24, 2023, Open bid tab, bidtabclibla2108pdf ↗ |
| 8 inch gate valve | each | 4 | — | $2,200 | $1,200 – $2,200 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 12 inch cpslp storm sewer (707.33), as per plan | linear foot | 3 | — | $60.00 | $50.00 – $60.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Non-Tracking Tack Coat | gallon | 3 | — | $4.00 | $4.00 – $7.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 4 inch insertion valve, as per plan | each | 3 | — | $10,600 | $7,000 – $10,600 | Apr 12, 2024, Open bid tab, bidtabclibla2104pdf ↗ |
| 4 inch sanitary lateral repair, as per plan | linear foot | 3 | — | $30.00 | $30.00 – $100.00 | Feb 24, 2023, Open bid tab, bidtabclibla2108pdf ↗ |
| 4 inch concrete walk | square foot | 3 | — | $30.00 | $10.00 – $30.00 | Feb 24, 2023, Open bid tab, bidtabclibla2108pdf ↗ |
| Remove of ground mounted post support and reerection | each | 3 | — | $50.00 | $50.00 – $1,000 | Feb 24, 2023, Open bid tab, bidtabclibla2108pdf ↗ |
| Type 1 Catch Basin, As Per Plan | each | 3 | — | $3,000 | $1,500 – $3,000 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 4 inch gate valve | each | 3 | — | $1,400 | $800.00 – $1,400 | Feb 24, 2023, Open bid tab, bidtabclibla2108pdf ↗ |
| 10 inch gate valve | each | 3 | — | $2,500 | $2,000 – $2,507 | Feb 24, 2023, Open bid tab, bidtabclibla2108pdf ↗ |
| 3/4 inch hdpe cts plastic dr-9 water service branch, as per plan | linear foot | 2 | — | $75.00 | $70.00 – $75.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 8 inch pvc c-900 dr-18 water main, as per plan | linear foot | 2 | — | $100.00 | $100.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Low Strength Mortar Backfill, Type 2 | cubic yard | 2 | — | $400.00 | $400.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Cctv Sewer Lateral, As Per Plan | each | 2 | — | $200.00 | $200.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 12 inch reinforced concrete pipe storm sewer (706.02), as per plan | linear foot | 2 | — | $120.00 | $120.00 – $130.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 15 inch conduit, type b, 707.33, storm repair, as per plan | linear foot | 2 | — | $30.00 | $30.00 – $100.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 12 inch conduit, type b, 707.33, storm repair, as per plan | linear foot | 2 | — | $25.00 | $25.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 8 inch conduit, type b, 707.65, storm repair, as per plan | linear foot | 2 | — | $20.00 | $20.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 6 inch conduit, type b, 707.65, storm repair, as per plan | linear foot | 2 | — | $15.00 | $15.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 4 inch conduit, type b, 707.65, storm repair, as per plan | linear foot | 2 | — | $10.00 | $10.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| Asphalt Concrete Base Course, Pg 64-22 | cubic yard | 2 | — | $205.00 | $205.00 – $220.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |
| 7 inch non-reinforced concrete pavement | square yard | 2 | — | $120.00 | $110.00 – $120.00 | May 30, 2025, Open bid tab, bidtabclibla2302pdf ↗ |