Village of Beaverdam: awarded unit prices

29 winning bid prices read from 1 source documents, 2024. The table lists the 29 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Village of Beaverdam

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Water Meter Piteach1—$665.00$665.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
6 inch tapping sleeve and valveeach1—$5,500$5,500Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
8 inch pvc awwa c-900 water main, as per planlinear foot1—$84.75$84.75Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
6 inch pvc awwa c-900 water main, as per planlinear foot1—$102.00$102.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
1 inch cts sdr-9 water service branch, as per planlinear foot1—$72.00$72.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
3/4 inch cts sdr-9 water service branch, as per planlinear foot1—$50.00$50.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Remove of ground mounted post support and re-erectionls1—$465.00$465.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Remove of ground mounted sign and re-erectionls1—$465.00$465.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
1-1/4 inch asphalt concrete surface course, type 1, (449), pg64-22cubic yard1—$495.00$495.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
2-3/4 inch asphalt concrete intermediate course, type 2, (449)cubic yard1—$425.00$425.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Sanitary Sewer Lateral Repair, As Per Planlinear foot1—$40.00$40.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Fire Hydrant Removedeach1—$670.00$670.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Seeding And Mulching, Class 1, As Per Plansquare yard1—$7.00$7.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Construction Layout Stakes And Surveying, As Per Planls1—$5,000$5,000Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
4 inch concrete walksquare foot1—$13.00$13.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Erosion Controleach1—$1.00$1.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
6 inch fire hydrant assembly, as per planeach1—$8,100$8,100Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
8 inch conduit, type b, 707.45, storm repairlinear foot1—$23.00$23.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
6 inch conduit, type b, 707.45, storm repairlinear foot1—$16.00$16.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
4 inch conduit, type b, 707.45, storm repairlinear foot1—$11.00$11.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Valve Box Removedeach1—$515.00$515.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Subgrade Compactionsquare yard1—$1.00$1.00Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Maintaining Trafficls1—$15,250$15,250Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Non-Tracking Tack Coat, 0.06 Gal/S.Y.gallon1—$5.50$5.50Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Walk Removedsquare foot1—$1.60$1.60Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Removed, As Per Planls1—$17,800$17,800Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
Aggregate Basecubic yard1—$36.25$36.25Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
8 inch gate valveeach1—$2,750$2,750Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗
6 inch gate valveeach1—$1,800$1,800Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Ohio: statewide figures.