| Water Meter Pit | each | 1 | — | $665.00 | $665.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 6 inch tapping sleeve and valve | each | 1 | — | $5,500 | $5,500 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 8 inch pvc awwa c-900 water main, as per plan | linear foot | 1 | — | $84.75 | $84.75 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 6 inch pvc awwa c-900 water main, as per plan | linear foot | 1 | — | $102.00 | $102.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 1 inch cts sdr-9 water service branch, as per plan | linear foot | 1 | — | $72.00 | $72.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 3/4 inch cts sdr-9 water service branch, as per plan | linear foot | 1 | — | $50.00 | $50.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Remove of ground mounted post support and re-erection | ls | 1 | — | $465.00 | $465.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Remove of ground mounted sign and re-erection | ls | 1 | — | $465.00 | $465.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 1-1/4 inch asphalt concrete surface course, type 1, (449), pg64-22 | cubic yard | 1 | — | $495.00 | $495.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 2-3/4 inch asphalt concrete intermediate course, type 2, (449) | cubic yard | 1 | — | $425.00 | $425.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Sanitary Sewer Lateral Repair, As Per Plan | linear foot | 1 | — | $40.00 | $40.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Fire Hydrant Removed | each | 1 | — | $670.00 | $670.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 1 | — | $7.00 | $7.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Construction Layout Stakes And Surveying, As Per Plan | ls | 1 | — | $5,000 | $5,000 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 4 inch concrete walk | square foot | 1 | — | $13.00 | $13.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Erosion Control | each | 1 | — | $1.00 | $1.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 6 inch fire hydrant assembly, as per plan | each | 1 | — | $8,100 | $8,100 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $23.00 | $23.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $16.00 | $16.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $11.00 | $11.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Valve Box Removed | each | 1 | — | $515.00 | $515.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Subgrade Compaction | square yard | 1 | — | $1.00 | $1.00 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Maintaining Traffic | ls | 1 | — | $15,250 | $15,250 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Non-Tracking Tack Coat, 0.06 Gal/S.Y. | gallon | 1 | — | $5.50 | $5.50 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Walk Removed | square foot | 1 | — | $1.60 | $1.60 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Removed, As Per Plan | ls | 1 | — | $17,800 | $17,800 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| Aggregate Base | cubic yard | 1 | — | $36.25 | $36.25 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 8 inch gate valve | each | 1 | — | $2,750 | $2,750 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |
| 6 inch gate valve | each | 1 | — | $1,800 | $1,800 | Feb 5, 2024, Open bid tab, bidtaballbea2301pdf ↗ |