| Maintaining Traffic | ls | 6 | $2,500 | $500.00 | $500.00 – $6,050 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| 6 inch non-reinforced concrete pavement, as per plan | square yard | 5 | $72.00 | $90.00 | $42.00 – $90.00 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| 8 inch conduit, type b, 707.45, as per plan | linear foot | 4 | — | $36.00 | $1.00 – $36.00 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| 6 inch conduit, type b, 707.45, as per plan | linear foot | 4 | — | $30.00 | $1.00 – $30.00 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| 4 inch conduit, type b, 707.45, as per plan | linear foot | 4 | — | $25.00 | $1.00 – $25.00 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| Curb Ramp, As Per Plan | square foot | 4 | — | $30.00 | $12.00 – $30.00 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| 4 inch concrete walk, as per plan | square foot | 4 | — | $9.25 | $5.50 – $9.25 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| Stabilized Crushed Aggregate | cubic yard | 4 | — | $32.36 | $32.36 – $70.00 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 4 | — | $100.00 | $32.00 – $100.00 | Nov 29, 2022, Open bid tab, bidtabsheann2205pdf ↗ |
| Removed, As Per Plan | ls | 4 | — | $6,100 | $3,800 – $12,000 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| Type 2-2B Catch Basin, As Per Plan | each | 3 | — | $500.00 | $500.00 – $1,100 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| Subgrade Compaction | square yard | 3 | — | $1.86 | $1.86 – $5.00 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| Remove and Reset Mailbox | each | 3 | — | $50.00 | $50.00 – $150.00 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| 12 inch reinforced concrete pipe storm sewer, as per plan | linear foot | 2 | — | $70.00 | $45.00 – $70.00 | Dec 16, 2020, Open bid tab, bidtabsheann2006pdf ↗ |
| Yard Drain, As Per Plan | each | 2 | — | $500.00 | $500.00 – $615.00 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| Non-Tracking Tack Coat | gallon | 2 | — | $5.00 | $5.00 | Nov 29, 2022, Open bid tab, bidtabsheann2205pdf ↗ |
| Catch Basin Removed | each | 2 | — | $150.00 | $150.00 – $200.00 | Dec 16, 2020, Open bid tab, bidtabsheann2006pdf ↗ |
| Pipe removed, 24 inch and under | linear foot | 2 | — | $8.00 | $8.00 | Dec 16, 2020, Open bid tab, bidtabsheann2006pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 2 | — | $3.00 | $1.00 – $3.00 | Nov 29, 2022, Open bid tab, bidtabsheann2205pdf ↗ |
| Erosion Control | each | 2 | — | $1.00 | $1.00 | Dec 16, 2020, Open bid tab, bidtabsheann2006pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $30.00 | $1.00 – $30.00 | Nov 29, 2022, Open bid tab, bidtabsheann2205pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $25.00 | $1.00 – $25.00 | Nov 29, 2022, Open bid tab, bidtabsheann2205pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $20.00 | $1.00 – $20.00 | Nov 29, 2022, Open bid tab, bidtabsheann2205pdf ↗ |
| Curb And Gutter Replaced (In-Kind) | linear foot | 2 | — | $45.75 | $30.00 – $45.75 | Dec 16, 2020, Open bid tab, bidtabsheann2006pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 2 | — | $8,000 | $1,000 – $8,000 | Dec 16, 2020, Open bid tab, bidtabsheann2006pdf ↗ |
| Combination Curb And Gutter, Type 2, As Per Plan | linear foot | 2 | — | $60.00 | $20.00 – $60.00 | Mar 13, 2024, Open bid tab, bidtabsheann2208pdf ↗ |
| Walk Removed | square foot | 2 | — | $1.50 | $1.00 – $1.50 | Dec 16, 2020, Open bid tab, bidtabsheann2006pdf ↗ |
| Curb And Gutter Removed | linear foot | 2 | — | $3.00 | $3.00 – $10.00 | Dec 16, 2020, Open bid tab, bidtabsheann2006pdf ↗ |
| Combination Curb & Gutter, Type 2, As Per Plan | linear foot | 1 | — | $100.00 | $100.00 | Nov 29, 2022, Open bid tab, bidtabsheann2205pdf ↗ |
| Water works, misc.: 6 inch water main relocated | linear foot | 1 | — | $80.00 | $80.00 | Dec 16, 2020, Open bid tab, bidtabsheann2006pdf ↗ |
| 48 inch storm sewer, as per plan | linear foot | 1 | — | $260.00 | $260.00 | Dec 16, 2020, Open bid tab, bidtabsheann2006pdf ↗ |
| 10 inch storm sewer repair | linear foot | 1 | — | $135.00 | $135.00 | Dec 16, 2020, Open bid tab, bidtabsheann2006pdf ↗ |
| 8 inch storm lateral | linear foot | 1 | — | $51.00 | $51.00 | Dec 16, 2020, Open bid tab, bidtabsheann2006pdf ↗ |
| Structure backfill for fire cistern | ls | 1 | — | $5,000 | $5,000 | Aug 21, 2019, Open bid tab, bidtabsheann1903pdf ↗ |
| 8 inch c-900 dr-18 water main, as per plan | linear foot | 1 | — | $50.00 | $50.00 | Aug 21, 2019, Open bid tab, bidtabsheann1903pdf ↗ |
| Traffic sign removed and relocated, as per plan | each | 1 | — | $200.00 | $200.00 | Aug 21, 2019, Open bid tab, bidtabsheann1903pdf ↗ |
| No. 12 THHN POLE AND BRACKET CABLE | linear foot | 1 | — | $1.00 | $1.00 | Aug 21, 2019, Open bid tab, bidtabsheann1903pdf ↗ |
| No. 8 THHN DISTRIBUTION CABLE | linear foot | 1 | — | $2.00 | $2.00 | Aug 21, 2019, Open bid tab, bidtabsheann1903pdf ↗ |
| Pull box, 725.06, 12 inchx18 inch | each | 1 | — | $650.00 | $650.00 | Aug 21, 2019, Open bid tab, bidtabsheann1903pdf ↗ |
| Connection, Unfused Bolted | each | 1 | — | $200.00 | $200.00 | Aug 21, 2019, Open bid tab, bidtabsheann1903pdf ↗ |