Agency · awarded bid prices
Village of Alger: awarded unit prices
5 winning bid prices read from 1 source documents, 2023. The table lists the 5 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.
Cost by state › Agencies › Village of Alger
| Item | Per | Winning bids | Median | Latest award | Lowest – highest | Latest source document |
|---|---|---|---|---|---|---|
| Maintaining Traffic For All Streets | ls | 1 | — | $1,000 | $1,000 | Mar 9, 2023, Open bid tab, bidtabharalg2101pdf ↗ |
| Tack Coat, 0.10 Gal/S.Y. | gallon | 1 | — | $3.00 | $3.00 | Mar 9, 2023, Open bid tab, bidtabharalg2101pdf ↗ |
| 1-1/2 inch asphalt concrete surface course, type 1, pg 64-22, (449) | cubic yard | 1 | — | $234.00 | $234.00 | Mar 9, 2023, Open bid tab, bidtabharalg2101pdf ↗ |
| Manhole Adjusted To Grade | each | 1 | — | $1,500 | $1,500 | Mar 9, 2023, Open bid tab, bidtabharalg2101pdf ↗ |
| 1-1/2 inch± pavement milling, asphalt concrete | square yard | 1 | — | $3.00 | $3.00 | Mar 9, 2023, Open bid tab, bidtabharalg2101pdf ↗ |
These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.
More prices in Ohio: statewide figures.