Sandusky County Park District: awarded unit prices

132 winning bid prices read from 2 source documents, 2022–2023. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Sandusky County Park District

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Waterthousand gallons3—$5.00$5.00 – $50.00Oct 27, 2023, Open bid tab, 180945 ↗
Commercial Fertilizerton2—$2,000$1,550 – $2,000Oct 27, 2023, Open bid tab, 180945 ↗
Repair Seeding And Mulchingsquare yard2—$15.00$2.00 – $15.00Oct 27, 2023, Open bid tab, 180945 ↗
Seeding And Mulching, Class 1square yard2—$4.50$2.00 – $4.50Oct 27, 2023, Open bid tab, 180945 ↗
Proof Rollinghour2—$175.00$83.00 – $175.00Oct 27, 2023, Open bid tab, 180945 ↗
Excavation Of Subgradecubic yard2—$45.00$8.50 – $45.00Oct 27, 2023, Open bid tab, 180945 ↗
Construction Layout Stakes And Surveyingls2—$6,500$6,500 – $11,000Oct 27, 2023, Open bid tab, 180945 ↗
Subgrade Compactionsquare yard2—$4.00$1.50 – $4.00Oct 27, 2023, Open bid tab, 180945 ↗
Aggregate Basecubic yard2—$55.00$50.50 – $55.00Oct 27, 2023, Open bid tab, 180945 ↗
Embankmentcubic yard2—$20.00$20.00 – $25.00Oct 27, 2023, Open bid tab, 180945 ↗
Topsoilcubic yard2—$62.00$61.00 – $62.00Oct 27, 2023, Open bid tab, 180945 ↗
Mobilizationls2—$25,000$25,000 – $59,500Oct 27, 2023, Open bid tab, 180945 ↗
Excavationcubic yard2—$19.00$19.00 – $25.00Oct 27, 2023, Open bid tab, 180945 ↗
Clearing and Grubbingls2—$12,500$2,500 – $12,500Oct 27, 2023, Open bid tab, 180945 ↗
Pull Box Removed And Replacedeach1—$1,080$1,080May 6, 2022, Open bid tab, 200721 ↗
Pull Box, 725.06, Size 1.5each1—$1,030$1,030May 6, 2022, Open bid tab, 200721 ↗
No. 6 Awg 2400 Volt Distribution Cablelinear foot1—$4.50$4.50May 6, 2022, Open bid tab, 200721 ↗
Light Pole Foundation, 24 Inch X 6' Deep, As Per Planeach1—$3,000$3,000May 6, 2022, Open bid tab, 200721 ↗
Special - Mailbox Support System, Singleeach1—$250.00$250.00May 6, 2022, Open bid tab, 200721 ↗
Drainage Structure, Misc.: Test Tee/Clean Out Adjusted To Gradeeach1—$300.00$300.00May 6, 2022, Open bid tab, 200721 ↗
Catch Basin, No. 2-2A, As Per Planeach1—$2,600$2,600May 6, 2022, Open bid tab, 200721 ↗
Conduit, Bored Or Jackedlinear foot1—$500.00$500.00May 6, 2022, Open bid tab, 200721 ↗
Inlet, Side Ditcheach1—$2,200$2,200May 6, 2022, Open bid tab, 200721 ↗
42 inch conduit, type clinear foot1—$250.00$250.00May 6, 2022, Open bid tab, 200721 ↗
15 inch conduit, type clinear foot1—$55.00$55.00May 6, 2022, Open bid tab, 200721 ↗
Special - Bollard, Hingedeach1—$1,500$1,500May 6, 2022, Open bid tab, 200721 ↗
Rockcubic yard1—$65.00$65.00May 6, 2022, Open bid tab, 200721 ↗
Special - Soil Sterilantsquare yard1—$1.00$1.00May 6, 2022, Open bid tab, 200721 ↗
Stump removed, 30 incheach1—$1,100$1,100May 6, 2022, Open bid tab, 200721 ↗
Stump removed, 18 incheach1—$950.00$950.00May 6, 2022, Open bid tab, 200721 ↗
Riprap Using 6 Inch Reinforced Concrete Slabsquare yard1—$250.00$250.00Oct 27, 2023, Open bid tab, 180945 ↗
Special - Structure, Misc.: Add Supplemental Descriptioneach1—$222,222$222,222Oct 27, 2023, Open bid tab, 180945 ↗
Class Qc1 Concrete, Abutment Not Including Footingcubic yard1—$975.00$975.00Oct 27, 2023, Open bid tab, 180945 ↗
Rock And/Or Shale Excavationcubic yard1—$250.00$250.00Oct 27, 2023, Open bid tab, 180945 ↗
Granular Material, Type E, As Per Plancubic yard1—$32.00$32.00Oct 27, 2023, Open bid tab, 180945 ↗
Remove misc.: bollardeach1—$350.00$350.00May 6, 2022, Open bid tab, 200721 ↗
Light Pole Foundation, 24 Inch X 8' Deep, As Per Planeach1—$4,000$4,000May 6, 2022, Open bid tab, 200721 ↗
6 Inch Non-Reinforced Concrete Pavement, Class Qc, Mssquare yard1—$130.00$130.00May 6, 2022, Open bid tab, 200721 ↗
No. 10 Awg Pole And Bracket Cablelinear foot1—$1.75$1.75May 6, 2022, Open bid tab, 200721 ↗
Special - Erosion And Sediment Controlls1—$2,000$2,000Oct 27, 2023, Open bid tab, 180945 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.