| Water | thousand gallons | 3 | — | $5.00 | $5.00 – $50.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Commercial Fertilizer | ton | 2 | — | $2,000 | $1,550 – $2,000 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Repair Seeding And Mulching | square yard | 2 | — | $15.00 | $2.00 – $15.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Seeding And Mulching, Class 1 | square yard | 2 | — | $4.50 | $2.00 – $4.50 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Proof Rolling | hour | 2 | — | $175.00 | $83.00 – $175.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Excavation Of Subgrade | cubic yard | 2 | — | $45.00 | $8.50 – $45.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Construction Layout Stakes And Surveying | ls | 2 | — | $6,500 | $6,500 – $11,000 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Subgrade Compaction | square yard | 2 | — | $4.00 | $1.50 – $4.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Aggregate Base | cubic yard | 2 | — | $55.00 | $50.50 – $55.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Embankment | cubic yard | 2 | — | $20.00 | $20.00 – $25.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Topsoil | cubic yard | 2 | — | $62.00 | $61.00 – $62.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Mobilization | ls | 2 | — | $25,000 | $25,000 – $59,500 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Excavation | cubic yard | 2 | — | $19.00 | $19.00 – $25.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Clearing and Grubbing | ls | 2 | — | $12,500 | $2,500 – $12,500 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Pull Box Removed And Replaced | each | 1 | — | $1,080 | $1,080 | May 6, 2022, Open bid tab, 200721 ↗ |
| Pull Box, 725.06, Size 1.5 | each | 1 | — | $1,030 | $1,030 | May 6, 2022, Open bid tab, 200721 ↗ |
| No. 6 Awg 2400 Volt Distribution Cable | linear foot | 1 | — | $4.50 | $4.50 | May 6, 2022, Open bid tab, 200721 ↗ |
| Light Pole Foundation, 24 Inch X 6' Deep, As Per Plan | each | 1 | — | $3,000 | $3,000 | May 6, 2022, Open bid tab, 200721 ↗ |
| Special - Mailbox Support System, Single | each | 1 | — | $250.00 | $250.00 | May 6, 2022, Open bid tab, 200721 ↗ |
| Drainage Structure, Misc.: Test Tee/Clean Out Adjusted To Grade | each | 1 | — | $300.00 | $300.00 | May 6, 2022, Open bid tab, 200721 ↗ |
| Catch Basin, No. 2-2A, As Per Plan | each | 1 | — | $2,600 | $2,600 | May 6, 2022, Open bid tab, 200721 ↗ |
| Conduit, Bored Or Jacked | linear foot | 1 | — | $500.00 | $500.00 | May 6, 2022, Open bid tab, 200721 ↗ |
| Inlet, Side Ditch | each | 1 | — | $2,200 | $2,200 | May 6, 2022, Open bid tab, 200721 ↗ |
| 42 inch conduit, type c | linear foot | 1 | — | $250.00 | $250.00 | May 6, 2022, Open bid tab, 200721 ↗ |
| 15 inch conduit, type c | linear foot | 1 | — | $55.00 | $55.00 | May 6, 2022, Open bid tab, 200721 ↗ |
| Special - Bollard, Hinged | each | 1 | — | $1,500 | $1,500 | May 6, 2022, Open bid tab, 200721 ↗ |
| Rock | cubic yard | 1 | — | $65.00 | $65.00 | May 6, 2022, Open bid tab, 200721 ↗ |
| Special - Soil Sterilant | square yard | 1 | — | $1.00 | $1.00 | May 6, 2022, Open bid tab, 200721 ↗ |
| Stump removed, 30 inch | each | 1 | — | $1,100 | $1,100 | May 6, 2022, Open bid tab, 200721 ↗ |
| Stump removed, 18 inch | each | 1 | — | $950.00 | $950.00 | May 6, 2022, Open bid tab, 200721 ↗ |
| Riprap Using 6 Inch Reinforced Concrete Slab | square yard | 1 | — | $250.00 | $250.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Special - Structure, Misc.: Add Supplemental Description | each | 1 | — | $222,222 | $222,222 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Class Qc1 Concrete, Abutment Not Including Footing | cubic yard | 1 | — | $975.00 | $975.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Rock And/Or Shale Excavation | cubic yard | 1 | — | $250.00 | $250.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Granular Material, Type E, As Per Plan | cubic yard | 1 | — | $32.00 | $32.00 | Oct 27, 2023, Open bid tab, 180945 ↗ |
| Remove misc.: bollard | each | 1 | — | $350.00 | $350.00 | May 6, 2022, Open bid tab, 200721 ↗ |
| Light Pole Foundation, 24 Inch X 8' Deep, As Per Plan | each | 1 | — | $4,000 | $4,000 | May 6, 2022, Open bid tab, 200721 ↗ |
| 6 Inch Non-Reinforced Concrete Pavement, Class Qc, Ms | square yard | 1 | — | $130.00 | $130.00 | May 6, 2022, Open bid tab, 200721 ↗ |
| No. 10 Awg Pole And Bracket Cable | linear foot | 1 | — | $1.75 | $1.75 | May 6, 2022, Open bid tab, 200721 ↗ |
| Special - Erosion And Sediment Control | ls | 1 | — | $2,000 | $2,000 | Oct 27, 2023, Open bid tab, 180945 ↗ |