Skip to content
Hubstake

Agency · awarded bid prices

Richland Township: awarded unit prices

76 winning bid prices read from 3 source documents, 2025. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Richland Township

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Seeding And Mulching, Class 2square yard3—$10.00$5.00 – $15.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Bonds And Insurances, As Per Planls3—$5,000$4,500 – $5,000Jul 14, 2025, Open bid tab, 0000030038 ↗
Erosion Control, As Per Planls3—$1,300$1,300 – $2,000Jul 14, 2025, Open bid tab, 0000030038 ↗
Ditch Erosion Protectionsquare yard3—$5.00$5.00 – $6.00Jul 14, 2025, Open bid tab, 0000030038 ↗
_ Ditch Cleanoutlinear foot3—$9.00$7.50 – $10.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Pavement Removedsquare yard3—$25.00$7.50 – $25.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Construction Layout Stakes And Surveyingls3—$3,300$1,000 – $3,300Jul 14, 2025, Open bid tab, 0000030038 ↗
Subgrade Compaction, As Per Plansquare yard3—$10.00$6.00 – $15.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Aggregate Basecubic yard3—$150.00$125.00 – $150.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Mobilizationls3—$13,000$2,500 – $13,000Jul 14, 2025, Open bid tab, 0000030038 ↗
Clearing and Grubbingls3—$6,100$5,000 – $6,100Jul 14, 2025, Open bid tab, 0000030038 ↗
Drilled Shafts, 36 Inch Diameter Into Bedrock, As Per Planlinear foot2—$100.00$100.00 – $123.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Drilled Shafts, 36 Inch Diameter, Above Bedrock, As Per Planlinear foot2—$80.00$80.00 – $100.00Jul 14, 2025, Open bid tab, 0000030038 ↗
STEEL PILES, MISC.: SOLDIER PILES - HP18x157linear foot2—$120.00$113.00 – $120.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Guardrail Rebuilt, As Per Planlinear foot2—$20.00$20.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Drilled Shafts, 24 Inch Diameter, Above Bedrock, As Per Planlinear foot2—$45.00$45.00 – $65.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Rock Channel Protection, Type D With Fabric Filtercubic yard2—$580.00$325.00 – $580.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Concrete misc.: 8 inch x 24 inch x 54 inch precast concrete laggingeach2—$1,100$375.00 – $1,100Jul 14, 2025, Open bid tab, 0000030038 ↗
Guardrail Removed For Reuselinear foot2—$5.50$5.50 – $12.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Asphalt Concrete Surface Course, Type 1, (446), Pg64-22cubic yard2—$800.00$420.00 – $800.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Geotextile Fabric, As Per Plansquare yard2—$2.50$2.50 – $4.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Maintaining Traffic, As Per Planls2—$5,600$5,600Jul 14, 2025, Open bid tab, 0000030038 ↗
Pipe removed, 24 inch and underlinear foot2—$25.00$25.00 – $40.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Asphalt Concrete Base, Pg64-22cubic yard2—$550.00$350.00 – $550.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Asphalt Concrete Base, As Per Plancubic yard1—$300.00$300.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Asphalt Concrete Surface Course, Type 1, (448), As Per Plancubic yard1—$350.00$350.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Class Qc1 Concrete, Footing, As Per Plancubic yard1—$500.00$500.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Guardrail, Type Mgs, As Per Planlinear foot1—$40.00$40.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Porous Backfill With Geotextile Fabric, As Per Plancubic yard1—$135.00$135.00Jul 14, 2025, Open bid tab, 0000030038 ↗
STEEL PILES, MISC.: SOLDIER PILES - HP14x117linear foot1—$90.00$90.00Jul 14, 2025, Open bid tab, 0000030038 ↗
6 Inch Non-Perforated Corrugated Plastic Pipe, Including Specialslinear foot1—$9.00$9.00Jul 14, 2025, Open bid tab, 0000030038 ↗
6 inch perforated corrugated plastic pipelinear foot1—$9.00$9.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Anchor Assembly, Mgs Type Aeach1—$1,600$1,600Jul 14, 2025, Open bid tab, 0000030038 ↗
Drilled Shafts, 30 Inch Diameter, Into Bedrock, As Per Planlinear foot1—$80.00$80.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Drilled Shafts, 30 Inch Diameter, Above Bedrock, As Per Planlinear foot1—$65.00$65.00Jul 14, 2025, Open bid tab, 0000030038 ↗
18 inch storm sewer, as per planlinear foot1—$125.00$125.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Pavement milling, asphalt concretesquare yard1—$50.00$50.00Jul 14, 2025, Open bid tab, 0000030038 ↗
15 inch storm sewer, as per planlinear foot1—$120.00$120.00Jul 14, 2025, Open bid tab, 0000030038 ↗
12 inch storm sewer, as per planlinear foot1—$120.00$120.00Jul 14, 2025, Open bid tab, 0000030038 ↗
Maintaining Trafficls1—$5,000$5,000Jul 14, 2025, Open bid tab, 0000030038 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Ohio: statewide figures.