| Mobilization | ls | 56 | — | $510,107 | $250.00 – $510,107 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Traffic Control | ls | 55 | — | $4,350 | $1,250 – $27,000 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| 4 inch solid line paint | linear foot | 39 | $0.12 | $1.25 | $0.068 – $2.00 | May 12, 2026, Open bid tab, 26-3 ↗ |
| Dozer | hour | 38 | $60.00 | $293.03 | $60.00 – $350.00 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Random Riprap Class Iii | ton | 38 | $52.00 | $63.88 | $43.00 – $85.00 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Flotation Silt Curtain Type Moving Water | linear foot | 38 | $15.00 | $21.35 | $8.00 – $25.00 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| 3.0 Cu Yd Shovel | hour | 38 | $60.00 | $315.54 | $60.00 – $315.54 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Erosion Control Supervisor | ls | 37 | $250.00 | $500.00 | $100.00 – $1,000 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Granular Backfill | ton | 36 | $2.67 | $10.00 | $1.00 – $20.00 | Feb 5, 2026, Open bid tab, 26-2 ↗ |
| Rapid Stabilization Method 4 | square yard | 36 | $1.37 | $3.00 | $1.23 – $3.25 | May 12, 2026, Open bid tab, 26-3 ↗ |
| Remove Existing Bridge | ls | 36 | $2,500 | $10,500 | $1,000 – $43,000 | May 12, 2026, Open bid tab, 26-3 ↗ |
| Turf Establishment | ls | 36 | — | $2,500 | $250.00 – $2,500 | May 12, 2026, Open bid tab, 26-3 ↗ |
| Sediment Control Log Type Straw | linear foot | 35 | $3.10 | $3.30 | $2.55 – $5.00 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Aggregate Surfacing Class 5 | ton | 33 | $18.00 | $19.27 | $14.00 – $32.00 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Remove pipe culvert | linear foot | 30 | $7.00 | $14.04 | $5.00 – $35.00 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Remove Sign | each | 29 | $20.00 | $40.00 | $10.00 – $500.00 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Pipe Bedding Material | ton | 27 | $29.00 | $34.00 | $16.00 – $38.00 | Feb 5, 2026, Open bid tab, 26-2 ↗ |
| Structure Excavation Class U (P) | cubic yard | 27 | $2.00 | $2.00 | $1.00 – $6.00 | Feb 5, 2026, Open bid tab, 26-2 ↗ |
| Approach Grading | ls | 25 | $1,000 | $1,500 | $1,000 – $7,500 | Feb 5, 2026, Open bid tab, 26-2 ↗ |
| Culvert End Controls | each | 25 | $60.00 | $150.00 | $50.00 – $1,900 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Rolled Erosion Prevention Category 20 | square yard | 24 | $1.73 | $2.00 | $1.57 – $3.00 | May 12, 2026, Open bid tab, 26-3 ↗ |
| 4 inch broken line paint | linear foot | 22 | $0.086 | $1.75 | $0.07 – $2.00 | May 12, 2026, Open bid tab, 26-3 ↗ |
| Skid Loader | hour | 18 | $162.50 | $125.00 | $80.00 – $175.00 | Aug 26, 2025, Open bid tab, 25-4 ↗ |
| Asphalt seal coat | square yard | 17 | $0.406 | $0.406 | $0.406 – $0.415 | Mar 12, 2024, Open bid tab, 24-3 ↗ |
| 12 Cu Yd Truck | hour | 17 | $105.00 | $85.00 | $85.00 – $160.00 | Feb 19, 2025, Open bid tab, 25-1 ↗ |
| 15 inch cs pipe culvert | linear foot | 17 | $40.00 | $45.00 | $28.00 – $60.00 | Feb 5, 2026, Open bid tab, 26-2 ↗ |
| Asphalt material for fog seal | gallon | 17 | $2.79 | $2.79 | $2.76 – $2.79 | Mar 12, 2024, Open bid tab, 24-3 ↗ |
| Shoulder Base Aggregate Class 1 | ton | 17 | $20.00 | $30.00 | $17.00 – $30.00 | May 12, 2026, Open bid tab, 26-3 ↗ |
| Motor Grader | hour | 17 | $245.00 | $200.00 | $100.00 – $365.00 | Feb 19, 2025, Open bid tab, 25-1 ↗ |
| Asphalt material for seal coat | gallon | 17 | $2.69 | $2.69 | $2.69 – $2.80 | Mar 12, 2024, Open bid tab, 24-3 ↗ |
| 15 inch gs pipe apron | each | 16 | $212.50 | $350.00 | $150.00 – $350.00 | Feb 5, 2026, Open bid tab, 26-2 ↗ |
| Type Sp 12.5 Wearing Course Mixture (2,B) | ton | 14 | $68.05 | $76.00 | $62.57 – $79.34 | Feb 19, 2025, Open bid tab, 25-1 ↗ |
| Rolled Erosion Prevention Category 25 | square yard | 12 | $1.63 | $1.98 | $1.57 – $2.50 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| 18 inch cs pipe culvert | linear foot | 11 | $50.00 | $61.98 | $34.00 – $65.00 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Common Embankment (Cv) (P) | cubic yard | 11 | $7.91 | $7.91 | $0.5 – $15.00 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Excavation Common **P** | cubic yard | 11 | $5.00 | $7.91 | $3.75 – $12.00 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Type sp 12.5 asphalt mixture for patch | ton | 10 | $85.00 | $85.00 | $68.35 – $85.00 | Jul 5, 2023, Open bid tab, 23-6 ↗ |
| Aggregate Base Class 5 | ton | 10 | $21.00 | $27.00 | $15.00 – $27.00 | May 12, 2026, Open bid tab, 26-3 ↗ |
| Drainage System Type (B910) | ls | 9 | $3,000 | $3,000 | $2,185 – $4,000 | Sep 18, 2026, Open bid tab, 26-5 ↗ |
| Reinforced bars (epoxy coated) (p) | pound | 9 | $1.30 | $2.05 | $1.30 – $2.05 | Sep 18, 2026, Open bid tab, 26-5 ↗ |