| Milling asphalt surface (1.5 inch) (p) | square yard | 2 | — | $3.15 | $3.15 – $3.75 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| 6 inch solid line paint | linear foot | 2 | — | $0.17 | $0.17 | Apr 23, 2024, Open bid tab, 2024-1 ↗ |
| Lighting System | ls | 2 | — | $55,500 | $55,500 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Traffic Control | ls | 2 | — | $9,400 | $2,400 – $9,400 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Mobilization | ls | 2 | — | $57,000 | $29,950 – $57,000 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Type Sp 9.5 Bit Mix For Tight Blade Lev | ton | 1 | — | $60.50 | $60.50 | Apr 23, 2024, Open bid tab, 2024-1 ↗ |
| Install Sign Type Special | each | 1 | — | $331.00 | $331.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| 18 inch cas safety apron & grate des 3128 | each | 1 | — | $1,540 | $1,540 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| 3.0 Cu Yd Backhoe | hour | 1 | — | $220.00 | $220.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Remove pipe culvert (p) | linear foot | 1 | — | $9.50 | $9.50 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Milled Rumble Strips | each | 1 | — | $3,850 | $3,850 | Apr 23, 2024, Open bid tab, 2024-1 ↗ |
| Type Sp 9.5 Wearing Course Mix (2,B) | ton | 1 | — | $60.50 | $60.50 | Apr 23, 2024, Open bid tab, 2024-1 ↗ |
| Interim Pavement Marking (P) | linear foot | 1 | — | $2.25 | $2.25 | Apr 23, 2024, Open bid tab, 2024-1 ↗ |
| 6 inch broken line paint | linear foot | 1 | — | $0.17 | $0.17 | Apr 23, 2024, Open bid tab, 2024-1 ↗ |
| 6 inch dotted line multi comp gr in (wr) | linear foot | 1 | — | $1.65 | $1.65 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| 6 inch dble solid line multi comp gr in (wr) | linear foot | 1 | — | $3.30 | $3.30 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Fine Aggregate Bedding (Cv) | cubic yard | 1 | — | $39.00 | $39.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Type Sp 12.5 Wearing Course Mix (3,C) | ton | 1 | — | $104.55 | $104.55 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Salvage Mail Box Support | each | 1 | — | $55.00 | $55.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Install Mail Box Support | each | 1 | — | $110.00 | $110.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Salvage Sign Special | each | 1 | — | $55.00 | $55.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Granular Embankment (Cv) (P) | cubic yard | 1 | — | $20.00 | $20.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Pavement marking remove | linear foot | 1 | — | $0.8 | $0.8 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Sediment Control Log Type Compost | linear foot | 1 | — | $3.80 | $3.80 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Pavement mssg multi comp gr in (wr) | square foot | 1 | — | $21.00 | $21.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| 24 inch solid line multi comp gr in (wr) | linear foot | 1 | — | $23.20 | $23.20 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| 6 inch solid line multi comp gr in (wr) | linear foot | 1 | — | $1.65 | $1.65 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Shoulder Base Aggregate Class 1 | ton | 1 | — | $30.00 | $30.00 | Apr 23, 2024, Open bid tab, 2024-1 ↗ |
| Milled Rumble Strips-intermittent | linear foot | 1 | — | $0.15 | $0.15 | Apr 23, 2024, Open bid tab, 2024-1 ↗ |
| Aggregate Surfacing Class 1 | ton | 1 | — | $22.00 | $22.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Culvert End Controls | each | 1 | — | $165.00 | $165.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Install Sign | each | 1 | — | $409.00 | $409.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| 18 inch cas pipe culvert | linear foot | 1 | — | $55.00 | $55.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Motor Grader | hour | 1 | — | $200.00 | $200.00 | Apr 23, 2024, Open bid tab, 2024-1 ↗ |
| Common Embankment (Cv) (P) | cubic yard | 1 | — | $4.25 | $4.25 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Select Granular Embankment (Cv) (P) | cubic yard | 1 | — | $20.00 | $20.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Excavation Common **P** | cubic yard | 1 | — | $10.00 | $10.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Grubbing | each | 1 | — | $200.00 | $200.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| Clearing | each | 1 | — | $200.00 | $200.00 | Jun 24, 2025, Open bid tab, 2025-3 ↗ |
| 24 inch solid line paint | linear foot | 1 | — | $35.62 | $35.62 | Apr 23, 2024, Open bid tab, 2024-1 ↗ |