Oklahoma DOT: awarded unit prices

357,299 winning bid prices read from 7,738 source documents, 2000–2023. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Oklahoma DOT

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Mobilizationls6,433—$10,000$1.00 – $6,325,120Jan 12, 2023, contract 230082 ↗
Construction Traffic Controlls5,589$4,900$87,500$1.00 – $240,000Nov 17, 2022, contract 220340 ↗
Reinforced steelpound5,279$1.00$1.50$0.03 – $37.88Jan 12, 2023, contract 230002 ↗
Class AA Concretecubic yard4,540$510.00$580.00$4.00 – $15,000Jan 12, 2023, contract 230002 ↗
Solid Slab Soddingsquare yard4,275$2.00$2.95$0.1 – $86.00Jan 12, 2023, contract 230002 ↗
Class C Concretecubic yard3,953$300.00$575.00$41.00 – $9,000Jan 12, 2023, contract 230002 ↗
Temporary Silt Fencelinear foot3,870$2.00$3.25$0.1 – $100.00Jan 12, 2023, contract 230002 ↗
Unclassified Excavationcubic yard3,767$7.25$16.50$0.1 – $500.00Jan 12, 2023, contract 230002 ↗
Class A Concretecubic yard3,538$500.00$844.00$2.50 – $20,000Jan 12, 2023, contract 230003 ↗
Traffic Bound Surface Course Type Eton3,420$26.00$40.00$0.01 – $743.50Jan 12, 2023, contract 230002 ↗
Clearing and Grubbingls3,410—$40,000$0.01 – $2,570,253Jan 12, 2023, contract 230002 ↗
Temporary Silt Dikelinear foot3,046$8.00$20.00$0.01 – $500.00Jan 12, 2023, contract 230002 ↗
Vegetative Mulchingacre2,977$474.85$1,100$0.99 – $100,000Jan 12, 2023, contract 230002 ↗
Type I-A Plain Riprapton2,922$36.00$46.75$14.65 – $1,121Jan 12, 2023, contract 230003 ↗
Tack Coatgallon2,907$2.68$4.00$0.01 – $100.00Jan 12, 2023, contract 230002 ↗
Port.Changeable Message Signsd2,858$13.78$8.00$0.1 – $1,320Jan 12, 2023, contract 230082 ↗
Type I-A Filter Blanketton2,792$30.00$34.75$2.00 – $4,300Jan 12, 2023, contract 230003 ↗
Unclassified Borrowcubic yard2,754$9.26$7.00$0.01 – $525.00Jan 12, 2023, contract 230002 ↗
Remove of existing bridge structurels2,695—$11,000$7.50 – $2,720,000Jan 12, 2023, contract 230002 ↗
Cold Milling Pavementsquare yard2,587$3.00$5.00$0.17 – $475.74Jan 12, 2023, contract 230004 ↗
Structure steelpound2,576$2.90$5.00$0.01 – $100.00Jan 12, 2023, contract 230003 ↗
Construction sign 6.26 sf to 15.99 sfsd2,568—$0.25$0.01 – $18.00Jan 12, 2023, contract 230082 ↗
Construction sign 16.0 sf to 32.99 sfsd2,543—$0.25$0.01 – $20.00Jan 12, 2023, contract 230082 ↗
Construction sign 0 to 6.25 sfsd2,543—$0.02$0.01 – $127.00Jan 12, 2023, contract 230082 ↗
Warning Lights(Type A)sd2,510—$1.75$0.01 – $8.25Jan 12, 2023, contract 230082 ↗
Type A-salvaged Topsoills2,448—$150,000$400.00 – $956,000Jan 12, 2023, contract 230002 ↗
Sheet aluminum signsquare foot2,396$19.17$50.00$0.4 – $245.00Jan 12, 2023, contract 230002 ↗
Substructure Excavation Commoncubic yard2,371$15.00$17.50$0.95 – $500.00Jan 12, 2023, contract 230003 ↗
Traffic stripe(plastic)(4 inch wide)linear foot2,364$0.52$0.61$0.11 – $33.00Dec 22, 2022, contract 220339 ↗
Drumssd2,296—$1.20$0.01 – $5.20Jan 12, 2023, contract 230002 ↗
Prime Coatgallon2,244$4.00$4.00$0.01 – $120.00Jan 12, 2023, contract 230002 ↗
Remove of structure & obstructionsls2,183$9,500$95,000$1.17 – $675,000Jan 12, 2023, contract 230002 ↗
Construction Staking Level IIls2,160$11,000$75,000$1.00 – $1,100,583Jan 12, 2023, contract 230002 ↗
Remove of asphalt pavementsquare yard2,153$4.04$4.00$0.1 – $450.00Jan 12, 2023, contract 230002 ↗
Clsm Backfillcubic yard2,121$152.68$267.50$8.08 – $5,555Jan 12, 2023, contract 230003 ↗
Beam Guardrail W-beam Singlelinear foot2,075$18.00$83.00$2.36 – $1,473Jan 12, 2023, contract 230002 ↗
Wing barricadesd2,054—$0.25$0.01 – $19.37Jan 12, 2023, contract 230082 ↗
6 inch perforated pipe underdrain roundlinear foot2,049$22.00$19.00$0.5 – $165.00Jan 12, 2023, contract 230002 ↗
Sealer Resingallon2,034$100.00$264.00$1.00 – $1,000Jan 12, 2023, contract 230021 ↗
Sealer Crack Preparationlinear foot2,033$4.00$5.50$1.00 – $65.00Jan 12, 2023, contract 230021 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.