Skip to content
Hubstake

Agency · awarded bid prices

Ohio Turnpike and Infrastructure Commission: awarded unit prices

751 winning bid prices read from 10 source documents, 2023–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Ohio Turnpike and Infrastructure Commission

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Barrier Reflector, Type 1each9$12.50$15.00$7.00 – $15.00Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Protective Falsework, Debris Shield, Inspection Access, And Temporary Bracingls7$106,442$90,000$66,000 – $7,777,000Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Premium For Contract Performance Bond And Payment Bondls6$37,872$30,745$25,857 – $250,000Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Portable Changeable Message Sign, As Per Plansnmt6$1,130$1,160$685.00 – $3,000Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Grinding fins, tears, slivers on existing structure steelmnhr6$100.00$100.00$90.00 – $128.21May 7, 2026, Open bid tab, contract 40-26-02 ↗
Lane line, 6 inch, type 1mile6$545.00$2,287$450.00 – $2,287Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Edge line, 6 inch, type 1mile6$1,000$3,400$700.00 – $3,400Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Mobilizationls6$405,099$250,000$100,000 – $1,688,355Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Construction Layout Surveyls5$45,000$750.00$750.00 – $1,750,000Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Barrier Reflector, Type 2, One Wayeach5$14.00$14.00$13.60 – $15.76Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Patch concrete structuresquare foot5$280.00$271.00$184.00 – $299.00Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Raised Pavement Markereach5$148.50$148.50$74.44 – $378.00Feb 12, 2026, Open bid tab, contract 43-26-06 ↗
Maintaining Trafficls5$505,315$280,000$280,000 – $3,250,000Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Waterthousand gallons5—$1.00$1.00 – $265.00Feb 12, 2026, Open bid tab, contract 43-26-06 ↗
Concrete Repair By Epoxy Injectionlinear foot4—$263.00$248.00 – $263.00Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Final Inspection Repaireach4—$100.00$100.00May 7, 2026, Open bid tab, contract 40-26-02 ↗
Field paint structure steel, finish coat, system ozeusquare foot4—$2.00$2.00 – $3.50May 7, 2026, Open bid tab, contract 40-26-02 ↗
Field paint structure steel, intermediate coat, system ozeusquare foot4—$3.00$2.50 – $4.00May 7, 2026, Open bid tab, contract 40-26-02 ↗
Field paint of existing structure steel, prime coat, system ozeusquare foot4—$3.00$2.50 – $4.00May 7, 2026, Open bid tab, contract 40-26-02 ↗
Surface preparation of existing structure steel, system ozeusquare foot4—$10.00$10.00 – $14.00May 7, 2026, Open bid tab, contract 40-26-02 ↗
Replace prismatic retro-reflectoreach4—$9.50$9.50 – $122.22May 7, 2026, Open bid tab, contract 40-26-02 ↗
Concrete Weatherproofing, Deck, Abutment Slabs, And Approach Slabssquare yard4—$9.50$9.50 – $10.20Feb 12, 2026, Open bid tab, contract 43-26-06 ↗
Reinforced concrete approach slabs (t=12 inch), as per plansquare yard4—$330.00$312.90 – $367.25Feb 12, 2026, Open bid tab, contract 43-26-06 ↗
Seal of construction jointlinear foot4—$4.00$4.00 – $14.24Feb 12, 2026, Open bid tab, contract 43-26-06 ↗
Crack Repair Using Epoxy Injectionlinear foot4—$150.00$135.00 – $217.00Feb 12, 2026, Open bid tab, contract 43-26-06 ↗
Jacking And Temporary Support Of Superstructure, As Per Planls4—$40,000$40,000 – $345,000Feb 12, 2026, Open bid tab, contract 43-26-06 ↗
Class Qc2 Concrete, Abutment Slabcubic yard4—$1,100$680.00 – $1,401Feb 12, 2026, Open bid tab, contract 43-26-06 ↗
Sonic Nap Alert Pattern (Snap)mile4—$8,400$3,100 – $13,200Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Concrete Barrier, Single Slope, Type B-50, As Per Planlinear foot4—$525.00$140.00 – $775.00May 6, 2026, Open bid tab, contract 46-26-03 ↗
Inspection Repaireach4—$150.00$150.00Apr 15, 2025, Open bid tab, contract 40-25-01 ↗
Fins, Tears, And Slivershour4—$75.00$75.00Apr 15, 2025, Open bid tab, contract 40-25-01 ↗
Paint of existing steel, finish coat, system ozeusquare foot4—$1.75$1.75 – $2.00Apr 15, 2025, Open bid tab, contract 40-25-01 ↗
Paint of existing steel, intermediate coat, system ozeusquare foot4—$2.00$2.00Apr 15, 2025, Open bid tab, contract 40-25-01 ↗
Paint of existing steel, prime coat, system ozeusquare foot4—$2.00$2.00Apr 15, 2025, Open bid tab, contract 40-25-01 ↗
Preparation Of Existing Steel, System Ozeusquare foot4—$8.25$7.00 – $18.00Apr 15, 2025, Open bid tab, contract 40-25-01 ↗
No. 4 deformed gfrp reinforcedlinear foot4—$1.80$1.80 – $1.99Feb 12, 2026, Open bid tab, contract 43-26-06 ↗
Portions Of Structure Removed, As Per Planls4—$449,830$170,969 – $3,886,437Feb 12, 2026, Open bid tab, contract 43-26-06 ↗
Object Marker, One Wayeach4—$25.00$19.00 – $35.00Jul 9, 2026, Open bid tab, contract 43-26-12 ↗
Concrete Barrier Removedlinear foot4—$156.35$19.28 – $156.35May 6, 2026, Open bid tab, contract 46-26-03 ↗
Dowel Holes With Nonshrink, Nonmetallic Grouteach4—$40.00$28.00 – $40.00Feb 12, 2026, Open bid tab, contract 43-26-06 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Ohio: statewide figures.