| Barrier Reflector, Type 1 | each | 9 | $12.50 | $15.00 | $7.00 – $15.00 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Protective Falsework, Debris Shield, Inspection Access, And Temporary Bracing | ls | 7 | $106,442 | $90,000 | $66,000 – $7,777,000 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Premium For Contract Performance Bond And Payment Bond | ls | 6 | $37,872 | $30,745 | $25,857 – $250,000 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Portable Changeable Message Sign, As Per Plan | snmt | 6 | $1,130 | $1,160 | $685.00 – $3,000 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Grinding fins, tears, slivers on existing structure steel | mnhr | 6 | $100.00 | $100.00 | $90.00 – $128.21 | May 7, 2026, Open bid tab, contract 40-26-02 ↗ |
| Lane line, 6 inch, type 1 | mile | 6 | $545.00 | $2,287 | $450.00 – $2,287 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Edge line, 6 inch, type 1 | mile | 6 | $1,000 | $3,400 | $700.00 – $3,400 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Mobilization | ls | 6 | $405,099 | $250,000 | $100,000 – $1,688,355 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Construction Layout Survey | ls | 5 | $45,000 | $750.00 | $750.00 – $1,750,000 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Barrier Reflector, Type 2, One Way | each | 5 | $14.00 | $14.00 | $13.60 – $15.76 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Patch concrete structure | square foot | 5 | $280.00 | $271.00 | $184.00 – $299.00 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Raised Pavement Marker | each | 5 | $148.50 | $148.50 | $74.44 – $378.00 | Feb 12, 2026, Open bid tab, contract 43-26-06 ↗ |
| Maintaining Traffic | ls | 5 | $505,315 | $280,000 | $280,000 – $3,250,000 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Water | thousand gallons | 5 | — | $1.00 | $1.00 – $265.00 | Feb 12, 2026, Open bid tab, contract 43-26-06 ↗ |
| Concrete Repair By Epoxy Injection | linear foot | 4 | — | $263.00 | $248.00 – $263.00 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Final Inspection Repair | each | 4 | — | $100.00 | $100.00 | May 7, 2026, Open bid tab, contract 40-26-02 ↗ |
| Field paint structure steel, finish coat, system ozeu | square foot | 4 | — | $2.00 | $2.00 – $3.50 | May 7, 2026, Open bid tab, contract 40-26-02 ↗ |
| Field paint structure steel, intermediate coat, system ozeu | square foot | 4 | — | $3.00 | $2.50 – $4.00 | May 7, 2026, Open bid tab, contract 40-26-02 ↗ |
| Field paint of existing structure steel, prime coat, system ozeu | square foot | 4 | — | $3.00 | $2.50 – $4.00 | May 7, 2026, Open bid tab, contract 40-26-02 ↗ |
| Surface preparation of existing structure steel, system ozeu | square foot | 4 | — | $10.00 | $10.00 – $14.00 | May 7, 2026, Open bid tab, contract 40-26-02 ↗ |
| Replace prismatic retro-reflector | each | 4 | — | $9.50 | $9.50 – $122.22 | May 7, 2026, Open bid tab, contract 40-26-02 ↗ |
| Concrete Weatherproofing, Deck, Abutment Slabs, And Approach Slabs | square yard | 4 | — | $9.50 | $9.50 – $10.20 | Feb 12, 2026, Open bid tab, contract 43-26-06 ↗ |
| Reinforced concrete approach slabs (t=12 inch), as per plan | square yard | 4 | — | $330.00 | $312.90 – $367.25 | Feb 12, 2026, Open bid tab, contract 43-26-06 ↗ |
| Seal of construction joint | linear foot | 4 | — | $4.00 | $4.00 – $14.24 | Feb 12, 2026, Open bid tab, contract 43-26-06 ↗ |
| Crack Repair Using Epoxy Injection | linear foot | 4 | — | $150.00 | $135.00 – $217.00 | Feb 12, 2026, Open bid tab, contract 43-26-06 ↗ |
| Jacking And Temporary Support Of Superstructure, As Per Plan | ls | 4 | — | $40,000 | $40,000 – $345,000 | Feb 12, 2026, Open bid tab, contract 43-26-06 ↗ |
| Class Qc2 Concrete, Abutment Slab | cubic yard | 4 | — | $1,100 | $680.00 – $1,401 | Feb 12, 2026, Open bid tab, contract 43-26-06 ↗ |
| Sonic Nap Alert Pattern (Snap) | mile | 4 | — | $8,400 | $3,100 – $13,200 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Concrete Barrier, Single Slope, Type B-50, As Per Plan | linear foot | 4 | — | $525.00 | $140.00 – $775.00 | May 6, 2026, Open bid tab, contract 46-26-03 ↗ |
| Inspection Repair | each | 4 | — | $150.00 | $150.00 | Apr 15, 2025, Open bid tab, contract 40-25-01 ↗ |
| Fins, Tears, And Slivers | hour | 4 | — | $75.00 | $75.00 | Apr 15, 2025, Open bid tab, contract 40-25-01 ↗ |
| Paint of existing steel, finish coat, system ozeu | square foot | 4 | — | $1.75 | $1.75 – $2.00 | Apr 15, 2025, Open bid tab, contract 40-25-01 ↗ |
| Paint of existing steel, intermediate coat, system ozeu | square foot | 4 | — | $2.00 | $2.00 | Apr 15, 2025, Open bid tab, contract 40-25-01 ↗ |
| Paint of existing steel, prime coat, system ozeu | square foot | 4 | — | $2.00 | $2.00 | Apr 15, 2025, Open bid tab, contract 40-25-01 ↗ |
| Preparation Of Existing Steel, System Ozeu | square foot | 4 | — | $8.25 | $7.00 – $18.00 | Apr 15, 2025, Open bid tab, contract 40-25-01 ↗ |
| No. 4 deformed gfrp reinforced | linear foot | 4 | — | $1.80 | $1.80 – $1.99 | Feb 12, 2026, Open bid tab, contract 43-26-06 ↗ |
| Portions Of Structure Removed, As Per Plan | ls | 4 | — | $449,830 | $170,969 – $3,886,437 | Feb 12, 2026, Open bid tab, contract 43-26-06 ↗ |
| Object Marker, One Way | each | 4 | — | $25.00 | $19.00 – $35.00 | Jul 9, 2026, Open bid tab, contract 43-26-12 ↗ |
| Concrete Barrier Removed | linear foot | 4 | — | $156.35 | $19.28 – $156.35 | May 6, 2026, Open bid tab, contract 46-26-03 ↗ |
| Dowel Holes With Nonshrink, Nonmetallic Grout | each | 4 | — | $40.00 | $28.00 – $40.00 | Feb 12, 2026, Open bid tab, contract 43-26-06 ↗ |