Skip to content
Hubstake

Agency · awarded bid prices

ODOT: awarded unit prices

62,015 winning bid prices read from 761 source documents, 2016–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › ODOT

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Temporary signsquare foot758$20.00$12.00$0.01 – $67.96Aug 13, 2026, 2026 bid data (zip) ↗
Temporary barricade, type iiieach703$140.00$190.00$0.01 – $1,000Aug 13, 2026, 2026 bid data (zip) ↗
Flaggershour695$60.00$61.50$0.01 – $125.00Aug 13, 2026, 2026 bid data (zip) ↗
Temporary Plastic Drumseach684$45.50$55.00$0.01 – $450.00Aug 13, 2026, 2026 bid data (zip) ↗
Pollution Control Planls639$750.00$1,000$0.01 – $88,000Aug 13, 2026, 2026 bid data (zip) ↗
Portable changeable message signeach603$5,000$2,000$0.01 – $43,285Aug 13, 2026, 2026 bid data (zip) ↗
Remove of structure and obstructionsls506—$7,500$0.01 – $1,658,830Aug 13, 2026, 2026 bid data (zip) ↗
Flagger Station Lightingeach472$1,500$650.00$0.01 – $15,650Aug 13, 2026, 2026 bid data (zip) ↗
Temporary barricade, type iieach463$60.00$70.00$0.01 – $500.00Aug 13, 2026, 2026 bid data (zip) ↗
Sequential arrow signeach421$2,200$500.00$0.01 – $15,000Aug 13, 2026, 2026 bid data (zip) ↗
Remove existing signls416—$500.00$65.50 – $725,000Aug 13, 2026, 2026 bid data (zip) ↗
Inlet Protection, Type 3each373$100.00$115.00$0.01 – $550.00Aug 13, 2026, 2026 bid data (zip) ↗
Stripe removelinear foot370$0.85$5.00$0.01 – $130.00Jul 30, 2026, 2026 bid data (zip) ↗
General Excavationcubic yard368$32.30$100.00$0.01 – $350.00Aug 13, 2026, 2026 bid data (zip) ↗
Mobilizationls366—$147,778$900.00 – $3,950,001Dec 10, 2020, Open bid tab, 15254 ↗
Temporary Protection And Direction Of Trafficls363—$7,778$1.00 – $1,802,000Dec 10, 2020, Open bid tab, 15254 ↗
Aggregate Baseton356$47.52$80.00$0.01 – $500.00Aug 13, 2026, 2026 bid data (zip) ↗
Mainline Video Inspectionlinear foot354$10.00$12.00$1.00 – $500.00Jul 30, 2026, 2026 bid data (zip) ↗
Pedestrian Channelizing Deviceslinear foot321$25.00$29.00$0.01 – $155.00Aug 13, 2026, 2026 bid data (zip) ↗
Erosion Controlls318—$4,000$0.01 – $200,000Dec 10, 2020, Open bid tab, 15254 ↗
Remove and reinstall existing signls317—$300.00$50.00 – $72,228Aug 6, 2026, 2026 bid data (zip) ↗
Temporary Impact Attenuator, Truck Mountedeach308$10,000$4,950$0.01 – $80,000Aug 13, 2026, 2026 bid data (zip) ↗
Construction Survey Workls301$25,000$18,500$1.00 – $380,630Dec 10, 2020, Open bid tab, 15254 ↗
Temporary stripelinear foot301$0.22$0.75$0.01 – $18.00Aug 13, 2026, 2026 bid data (zip) ↗
Sign, standard sheeting, sheet aluminumsquare foot293$27.00$34.00$10.70 – $826.00Aug 13, 2026, 2026 bid data (zip) ↗
Concrete Walkssquare foot290$11.82$17.00$3.35 – $80.00Aug 13, 2026, 2026 bid data (zip) ↗
Traffic Control Supervisoreach287$600.00$1,000$0.01 – $2,500Jul 23, 2026, 2026 bid data (zip) ↗
Repair Temporary Impact Attenuator, Truck Mountedeach286—$400.00$0.01 – $21,014Aug 13, 2026, 2026 bid data (zip) ↗
Pavement Bar, Type B-hssquare foot282$13.00$22.00$0.01 – $90.00Aug 13, 2026, 2026 bid data (zip) ↗
Temporary Flexible Pavement Markerseach280$1.50$11.00$0.01 – $75.00Aug 13, 2026, 2026 bid data (zip) ↗
Class 2 Preparationsquare yard276$225.00$0.01$0.01 – $2,500Jun 11, 2026, 2026 bid data (zip) ↗
Cold milling pavement remove, 2 inches deepsquare yard276—$3.50$0.01 – $175.00Jul 23, 2026, 2026 bid data (zip) ↗
Clearing AND Grubbingacre276—$17,500$0.01 – $1,000,000Aug 13, 2026, 2026 bid data (zip) ↗
Subgrade Geotextilesquare yard275$1.55$3.00$0.36 – $75.00Aug 13, 2026, 2026 bid data (zip) ↗
Permanent Seedingacre269$7,250$15,000$0.01 – $500,000Aug 13, 2026, 2026 bid data (zip) ↗
Sign Support Footingscubic yard265$3,538$5,000$0.6 – $60,000Aug 13, 2026, 2026 bid data (zip) ↗
Extra for Asphalt Approacheseach262$1,100$1,500$10.00 – $8,000Aug 13, 2026, 2026 bid data (zip) ↗
Wood sign postfbm256$15.00$15.00$3.17 – $130.00Aug 6, 2026, 2026 bid data (zip) ↗
Sediment Barrier, Type 3linear foot256$5.00$15.00$0.01 – $260.00Aug 13, 2026, 2026 bid data (zip) ↗
Asphalt Pavement Sawcuttinglinear foot241$3.45$1.95$0.01 – $45.00May 22, 2025, 2025 bid data (zip) ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Oregon: statewide figures.