| Mobilization | ls | 15 | $27,000 | $18,500 | $1.00 – $148,000 | May 4, 2026, Open bid tab, 311 ↗ |
| Asphalt material for tack coat | gallon | 9 | — | $4.00 | $0.01 – $4.00 | May 4, 2026, Open bid tab, 311 ↗ |
| Type Sp 9.5 Wearing Course Mix (2,C) | ton | 8 | $68.50 | $78.00 | $62.50 – $78.00 | Apr 29, 2026, Open bid tab, 312 ↗ |
| 4 inch solid line paint | linear foot | 8 | $0.125 | $0.1 | $0.1 – $1.40 | Mar 19, 2026, Open bid tab, 308 ↗ |
| 4 inch broken line paint | linear foot | 7 | $0.12 | $0.1 | $0.1 – $0.13 | Mar 19, 2026, Open bid tab, 308 ↗ |
| Milling asphalt surface | square yard | 7 | $12.00 | $14.00 | $9.00 – $25.00 | Apr 29, 2026, Open bid tab, 312 ↗ |
| 6 inch solid line paint | linear foot | 6 | $0.14 | $0.12 | $0.12 – $0.17 | Mar 19, 2026, Open bid tab, 308 ↗ |
| Type Sp 4.75 Bit Mix For Tight Blade Lev | ton | 5 | $65.00 | $54.00 | $54.00 – $75.00 | Apr 29, 2026, Open bid tab, 312 ↗ |
| Type Sp 12.5 Non Wear Course Mix (2,B) | ton | 5 | $78.00 | $90.00 | $65.00 – $90.00 | May 4, 2026, Open bid tab, 311 ↗ |
| Install Mail Box Support | each | 5 | $170.00 | $170.00 | $110.00 – $175.00 | Mar 19, 2026, Open bid tab, 308 ↗ |
| Type Sp 12.5 Non Wear Course Mix (2,C) | ton | 5 | $68.80 | $72.00 | $61.80 – $79.00 | Apr 21, 2026, Open bid tab, UGTP26 ↗ |
| Shoulder Base Aggregate Class 1 | ton | 5 | $15.10 | $9.00 | $9.00 – $38.00 | Apr 29, 2026, Open bid tab, 312 ↗ |
| Full deep reclamation | square yard | 5 | $3.15 | $2.70 | $2.15 – $4.95 | Apr 21, 2026, Open bid tab, UGTP26 ↗ |
| Shoulder Preparation | linear foot | 4 | — | $0.45 | $0.45 – $0.5 | Apr 29, 2026, Open bid tab, 312 ↗ |
| Traffic Control | ls | 4 | — | $2,200 | $1,350 – $5,500 | Apr 8, 2026, Open bid tab, 310 ↗ |
| Shoulder Base Aggregate Class 1 (P) | ton | 3 | — | $7.50 | $3.00 – $7.50 | Mar 19, 2026, Open bid tab, 308 ↗ |
| Subgrade preparation | each | 3 | — | $290.00 | $290.00 – $400.00 | Mar 19, 2026, Open bid tab, 308 ↗ |
| 4 inch dble solid line paint | linear foot | 3 | — | $0.26 | $0.23 – $0.26 | Apr 11, 2024, Open bid tab, KTP 2024 ↗ |
| 6 inch solid line paint, white | linear foot | 3 | — | $0.11 | $0.087 – $0.15 | Apr 29, 2026, Open bid tab, 312 ↗ |
| Remove Concrete Driveway Pavement | square yard | 3 | — | $45.00 | $19.00 – $45.00 | Apr 29, 2026, Open bid tab, 312 ↗ |
| Rolled Erosion Prevention Category 74 | square yard | 2 | — | $82.75 | $36.00 – $82.75 | Oct 7, 2025, Open bid tab, 306 ↗ |
| Asphalt seal coat | square yard | 2 | — | $0.48 | $0.48 – $0.56 | Feb 4, 2026, Open bid tab, 307 ↗ |
| Slope Preparation | ls | 2 | — | $10,000 | $10,000 – $20,000 | Oct 7, 2025, Open bid tab, 306 ↗ |
| Drainage System Type (B910) | ls | 2 | — | $3,000 | $3,000 – $4,000 | Oct 7, 2025, Open bid tab, 306 ↗ |
| Bridge Slab Concrete (3Yhpc-M) (P) | square foot | 2 | — | $62.00 | $46.00 – $62.00 | Oct 7, 2025, Open bid tab, 306 ↗ |
| Reinforced bars (epoxy coated) (p) | pound | 2 | — | $1.53 | $1.50 – $1.53 | Oct 7, 2025, Open bid tab, 306 ↗ |
| Structure concrete (3b52) (p) | cubic yard | 2 | — | $1,100 | $1,100 – $1,200 | Oct 7, 2025, Open bid tab, 306 ↗ |
| 4 inch broken line paint - yellow | linear foot | 2 | — | $0.08 | $0.08 – $0.24 | Apr 29, 2026, Open bid tab, 312 ↗ |
| Flotation Silt Curtain Type Moving Water | linear foot | 2 | — | $16.50 | $16.50 – $24.00 | Oct 7, 2025, Open bid tab, 306 ↗ |
| Remove Existing Bridge | ls | 2 | — | $80,000 | $64,000 – $80,000 | Oct 7, 2025, Open bid tab, 306 ↗ |
| Geotextile Filter Type 7 | square yard | 2 | — | $4.00 | $4.00 | Oct 7, 2025, Open bid tab, 306 ↗ |
| Excavation Common **P** | cubic yard | 2 | — | $14.00 | $14.00 – $35.00 | Oct 7, 2025, Open bid tab, 306 ↗ |
| Turf Establishment | ls | 2 | — | $2,000 | $2,000 – $5,500 | Oct 7, 2025, Open bid tab, 306 ↗ |
| Random Riprap Class III | cubic yard | 2 | — | $90.00 | $90.00 – $100.00 | Oct 7, 2025, Open bid tab, 306 ↗ |
| Sawing concrete pavement (full deep) | linear foot | 2 | — | $6.00 | $6.00 – $7.00 | Apr 29, 2026, Open bid tab, 312 ↗ |
| Remove asphalt pavement | square yard | 2 | — | $3.50 | $3.50 – $3.85 | May 4, 2026, Open bid tab, 311 ↗ |
| Silt Fence, Type MS | linear foot | 2 | — | $4.00 | $3.00 – $4.00 | Jul 2, 2024, Open bid tab, 299 ↗ |
| Structure Excavation | ls | 2 | — | $18,000 | $18,000 – $35,000 | Oct 7, 2025, Open bid tab, 306 ↗ |
| 4 inch solid line paint (white) | gallon | 1 | — | $21.85 | $21.85 | Mar 25, 2024, Open bid tab, 295 ↗ |
| 6 inch solid line paint (white) | gallon | 1 | — | $21.85 | $21.85 | Mar 25, 2024, Open bid tab, 295 ↗ |