Skip to content
Hubstake

Agency · awarded bid prices

Mahnomen County: awarded unit prices

249 winning bid prices read from 5 source documents, 2022–2025. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Mahnomen County

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Traffic Controlls7$2,200$12,500$1,750 – $12,500Apr 4, 2025, Open bid tab, 60909 ↗
Mobilizationls7$18,000$261,900$17,400 – $261,900Apr 4, 2025, Open bid tab, 60909 ↗
Maintenance and restoration of haul roadsls6$1.00$1.00$1.00Apr 10, 2024, Open bid tab, 60510 ↗
Type Sp 9.5 Wearing Course Mixture (2,B)ton6$61.80$57.25$57.25 – $92.70Apr 10, 2024, Open bid tab, 60510 ↗
Crushed asphalt (lv)cubic yard5$30.00$32.40$26.00 – $33.56Apr 10, 2024, Open bid tab, 60510 ↗
6 inch solid line paintlinear foot5$0.16$0.16$0.11 – $0.19Apr 10, 2024, Open bid tab, 60510 ↗
Aggregate Surfacing Class 5ton5$19.55$23.40$19.00 – $23.40Apr 10, 2024, Open bid tab, 60510 ↗
4 inch broken line paintlinear foot5$0.12$0.12$0.08 – $0.19Apr 10, 2024, Open bid tab, 60510 ↗
4 inch solid line paintlinear foot5$0.12$0.12$0.08 – $0.12Apr 10, 2024, Open bid tab, 60510 ↗
Interim Pavement Markingls5$6,700$8,500$2,080 – $8,500Apr 10, 2024, Open bid tab, 60510 ↗
Shoulder Preparationlinear foot3—$0.15$0.15 – $0.21Apr 10, 2024, Open bid tab, 60510 ↗
Common Topsoil Borrowcubic yard2—$50.00$16.00 – $50.00Apr 4, 2025, Open bid tab, 60909 ↗
Adjust Valve Boxeach2—$225.00$150.00 – $225.00Apr 4, 2025, Open bid tab, 60909 ↗
18 inch rc pipe aproneach2—$1,260$845.00 – $1,260Apr 4, 2025, Open bid tab, 60909 ↗
Remove Sewer Pipe (Storm)linear foot2—$14.00$8.00 – $14.00Apr 4, 2025, Open bid tab, 60909 ↗
6 inch concrete driveway pavementsquare yard2—$99.80$73.50 – $99.80Apr 4, 2025, Open bid tab, 60909 ↗
Aggregate Base (Cv) Class 5 (P)cubic yard2—$45.00$22.50 – $45.00Apr 4, 2025, Open bid tab, 60909 ↗
Asphalt material for tack coatgallon2—$0.01$0.01Apr 10, 2024, Open bid tab, 60510 ↗
Milling asphalt surface (2.0 inch)square yard2—$1.28$1.28 – $5.35Mar 15, 2022, Open bid tab, 61019 ↗
6 inch concrete walksquare foot2—$16.80$11.25 – $16.80Apr 4, 2025, Open bid tab, 60909 ↗
Silt Fence, Type MSlinear foot2—$2.00$2.00Apr 4, 2025, Open bid tab, 60909 ↗
Truncated Domessquare foot2—$80.00$58.80 – $80.00Apr 4, 2025, Open bid tab, 60909 ↗
Storm Drain Inlet Protectioneach2—$200.00$100.00 – $200.00Apr 4, 2025, Open bid tab, 60909 ↗
4 inch concrete walksquare foot2—$9.75$6.03 – $9.75Apr 4, 2025, Open bid tab, 60909 ↗
Geotextile Fabric Type 5square yard2—$10.00$1.50 – $10.00Apr 4, 2025, Open bid tab, 60909 ↗
Milling asphalt surface (1.75 inch)square yard1—$1.20$1.20Apr 10, 2024, Open bid tab, 60510 ↗
Milling asphalt surface (0.75 inch)square yard1—$0.75$0.75Apr 10, 2024, Open bid tab, 60510 ↗
Type sp 9.5 bit mixture for patchton1—$135.00$135.00Mar 13, 2023, Open bid tab, 60125 ↗
Remove Excess Roadway Materialsquare yard1—$17.25$17.25Mar 13, 2023, Open bid tab, 60125 ↗
Construct Drainage Structure Design SD-66linear foot1—$1,348$1,348Mar 21, 2022, Open bid tab, 61706 ↗
Construct Drainage Structure Design SD-54linear foot1—$1,080$1,080Mar 21, 2022, Open bid tab, 61706 ↗
Construct Drainage Structure Design 66-4020linear foot1—$1,090$1,090Mar 21, 2022, Open bid tab, 61706 ↗
28 inch span rc pipe-arch sewer class ivalinear foot1—$144.00$144.00Mar 21, 2022, Open bid tab, 61706 ↗
22 inch span rc pipe-arch sewer class ivalinear foot1—$120.00$120.00Mar 21, 2022, Open bid tab, 61706 ↗
18 inch rc pipe culvert class vlinear foot1—$80.00$80.00Mar 21, 2022, Open bid tab, 61706 ↗
Install Chain Link Fenceeach1—$24.45$24.45Apr 4, 2025, Open bid tab, 60909 ↗
Construction drainage structure des specialeach1—$19,600$19,600Apr 4, 2025, Open bid tab, 60909 ↗
Construction drainage structure design h or geach1—$5,200$5,200Apr 4, 2025, Open bid tab, 60909 ↗
Watermain Offseteach1—$5,200$5,200Apr 4, 2025, Open bid tab, 60909 ↗
Ductile iron fittingeach1—$1,350$1,350Apr 4, 2025, Open bid tab, 60909 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Minnesota: statewide figures.