| 1-1/2 inch asphalt concrete surface course, type 1, (448) pg 64-22 | cubic yard | 2 | — | $304.25 | $304.25 – $850.00 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 2-1/2 inch asphalt concrete intermediate course, type 2, (448) | cubic yard | 2 | — | $273.72 | $273.72 – $850.00 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 2 | — | $4.46 | $4.46 – $16.00 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $11.81 | $7.00 – $11.81 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $7.03 | $6.00 – $7.03 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $3.58 | $3.58 – $5.00 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 2 | — | $8,043 | $6,000 – $8,043 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Maintaining Traffic | ls | 2 | — | $16,470 | $5,000 – $16,470 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 2 | — | $29.28 | $29.28 – $90.00 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Removed, As Per Plan | ls | 2 | — | $65,443 | $4,000 – $65,443 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Odot Bonding | ls | 1 | — | $4,270 | $4,270 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Forcemain End Cleanout Chamber | each | 1 | — | $6,276 | $6,276 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Sanitary Lateral Access Valve | each | 1 | — | $555.10 | $555.10 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Grinder Pump Station, 16' Deep | each | 1 | — | $24,621 | $24,621 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Grinder Pump Station, 12' Deep | each | 1 | — | $21,562 | $21,562 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Grinder Pump Station, 8'-9' Deep | each | 1 | — | $19,357 | $19,357 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Combination Air Release Valve And Cleanout Chamber | each | 1 | — | $11,082 | $11,082 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Honda Pump Station Electric Service | each | 1 | — | $184,353 | $184,353 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Lewistown Pump Station Electric Service | each | 1 | — | $184,353 | $184,353 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Honda Pump Station With Standby Pump | each | 1 | — | $174,995 | $174,995 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Lewistown Pump Station With Standby Pump | each | 1 | — | $279,542 | $279,542 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Removed And Reset Mailbox, As Per Plan | each | 1 | — | $350.14 | $350.14 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 14 inch hdpe casing pipe install by horizontal directional drilling | linear foot | 1 | — | $131.77 | $131.77 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 6 inch hdpe sanitary sewer forcemain install by open cut | linear foot | 1 | — | $58.49 | $58.49 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 6 inch hdpe sanitary sewer forcemain install by horizontal directional drilling, as per plan | linear foot | 1 | — | $27.48 | $27.48 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 4 inch hdpe sanitary sewer forcemain (grinder pump line), install by open cut | linear foot | 1 | — | $85.06 | $85.06 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 4 inch hdpe sanitary sewer forcemain (grinder pump line),install by horizontal directional drilling, as per plan | linear foot | 1 | — | $24.75 | $24.75 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 1-1/2 inch hdpe sanitary sewer forcemain, for service, install by open cut | linear foot | 1 | — | $58.08 | $58.08 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 1-1/2 inch hdpe sanitary sewer forcemain, for service, install by horizontal directional drilling, as per plan | linear foot | 1 | — | $25.49 | $25.49 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 8 inch conduit, type c, 707.33, storm repair | linear foot | 1 | — | $13.26 | $13.26 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 8 inch conduit, type b, 707.33, storm repair | linear foot | 1 | — | $18.50 | $18.50 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 6 inch conduit, type b, 707.33, storm repair | linear foot | 1 | — | $12.29 | $12.29 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 6 inch conduit, type c, 707.33, storm repair | linear foot | 1 | — | $12.29 | $12.29 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| 8 inch conduit, type b, 707.24, storm repair | linear foot | 1 | — | $118.30 | $118.30 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Fence, Type Clt, As Per Plan | linear foot | 1 | — | $147.62 | $147.62 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Wood Fence Removed And Rebuilt | linear foot | 1 | — | $23.77 | $23.77 | Aug 31, 2021, Open bid tab, bidtablogwas1501pdf ↗ |
| Sanitary Air Release Valve | each | 1 | — | $5,000 | $5,000 | Apr 29, 2021, Open bid tab, bidtablogsto2001pdf ↗ |
| Sanitary Sewer Access Valve | each | 1 | — | $1,800 | $1,800 | Apr 29, 2021, Open bid tab, bidtablogsto2001pdf ↗ |
| Forcemain Connection Structure, As Per Plan | each | 1 | — | $4,200 | $4,200 | Apr 29, 2021, Open bid tab, bidtablogsto2001pdf ↗ |
| 4 inch hdpe sdr-11 sanitary sewer forcemain install (pipe supplied by lcsd, install by directional drilling) | linear foot | 1 | — | $25.00 | $25.00 | Apr 29, 2021, Open bid tab, bidtablogsto2001pdf ↗ |