| Erosion Control, As Per Plan | ls | 4 | — | $500.00 | $500.00 – $1,800 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Mobilization | ls | 4 | — | $5,000 | $2,500 – $5,000 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Clearing and Grubbing | ls | 4 | — | $500.00 | $500.00 – $2,800 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Drilled Shafts, 30 Inch Diameter, Plug Piles, As Per Plan | linear foot | 3 | — | $95.00 | $95.00 – $236.38 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Drilled Shafts, 24 Inch Diameter, Above Bedrock, As Per Plan | linear foot | 3 | — | $95.00 | $95.00 – $200.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| STEEL PILES, MISC.: SOLDIER PILES, HP 10x42 | linear foot | 3 | — | $33.00 | $33.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Asphalt Concrete Base, Pg64-28 | cubic yard | 3 | — | $220.00 | $220.00 – $295.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Bonds And Insurances, As Per Plan | ls | 3 | — | $2,500 | $2,000 – $2,500 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Sawing and seal asphalt concrete pavement joint | linear foot | 3 | — | $35.00 | $35.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Drilled Shafts, 24 Inch Diameter, Into Bedrock, As Per Plan | linear foot | 3 | — | $105.00 | $105.00 – $144.46 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Seeding And Mulching, Class 1 | square yard | 3 | — | $20.00 | $20.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Proof Rolling | hour | 3 | — | $200.00 | $200.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Pavement Removed | square yard | 3 | — | $3.50 | $3.50 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Asphalt Concrete Surface Course, Type 1, (448), Pg64-22 | cubic yard | 3 | — | $309.00 | $309.00 – $534.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Maintaining Traffic, As Per Plan | ls | 3 | — | $500.00 | $500.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Construction Layout Stakes And Surveying | ls | 3 | — | $500.00 | $500.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Asphalt Concrete Intermediate Course, Type 2, (448) | cubic yard | 3 | — | $298.00 | $298.00 – $523.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Subgrade Compaction | square yard | 3 | — | $3.00 | $3.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Aggregate Base | cubic yard | 3 | — | $65.00 | $65.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Embankment | cubic yard | 3 | — | $25.00 | $25.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Topsoil furnish and placed | cubic yard | 3 | — | $50.00 | $50.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Tack Coat | gallon | 3 | — | $116.50 | $116.50 – $154.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| Excavation | cubic yard | 3 | — | $25.00 | $25.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |
| General Construction | ls | 1 | — | $87,000 | $87,000 | Jan 15, 2021, Open bid tab, 190420 ↗ |
| Type "c" pavement replace (asphalt), roadway, as per plan | square yard | 1 | — | $50.00 | $50.00 | Jan 15, 2021, Open bid tab, 190420 ↗ |
| Full deep pavement sawing | linear foot | 1 | — | $14.00 | $14.00 | Jan 15, 2021, Open bid tab, 190420 ↗ |
| Anchor Assembly, Type E | each | 1 | — | $1,400 | $1,400 | Jan 15, 2021, Open bid tab, 190420 ↗ |
| _ Ditch Cleanout | linear foot | 1 | — | $8.33 | $8.33 | Jan 15, 2021, Open bid tab, 190420 ↗ |
| Guardrail, Type Mgs | linear foot | 1 | — | $26.00 | $26.00 | Jan 15, 2021, Open bid tab, 190420 ↗ |
| Headwall Removed | each | 1 | — | $250.00 | $250.00 | Jan 15, 2021, Open bid tab, 190420 ↗ |
| 24 inch storm sewer, as per plan | linear foot | 1 | — | $95.00 | $95.00 | Jan 15, 2021, Open bid tab, 190420 ↗ |
| Concrete Masonry | cubic yard | 1 | — | $300.00 | $300.00 | Jan 15, 2021, Open bid tab, 190420 ↗ |
| Pipe removed, 24 inch and under | linear foot | 1 | — | $12.50 | $12.50 | Jan 15, 2021, Open bid tab, 190420 ↗ |
| Low Strength Mortar Backfill | cubic yard | 1 | — | $150.00 | $150.00 | Jan 10, 2024, Open bid tab, 190886 ↗ |