Lake Co. Port & Economic Development Authority: awarded unit prices

34 winning bid prices read from 1 source documents, 2021. The table lists the 34 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Lake Co. Port & Economic Development Authority

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Erosion Control Mat, Type C, As Per Plansquare yard1—$1.70$1.70Feb 11, 2021, Open bid tab, 170567 ↗
6 inch conduit, type f, 707.45 for underdrain outletslinear foot1—$16.50$16.50Feb 11, 2021, Open bid tab, 170567 ↗
6 Inch Unclassified Pipe Underdrain With Geotextile Fabriclinear foot1—$12.25$12.25Feb 11, 2021, Open bid tab, 170567 ↗
Temporary Armor Stone, 4 To 6 Ton Stone, As Directed By The Engineercubic yard1—$146.00$146.00Feb 11, 2021, Open bid tab, 170567 ↗
Preconstruction Video Documentation, As Per Planls1—$2,510$2,510Feb 11, 2021, Open bid tab, 170567 ↗
Fence Misc: Temporary Safety Fence - 4' Plasticlinear foot1—$4.10$4.10Feb 11, 2021, Open bid tab, 170567 ↗
Bonds And Insurances, As Per Planls1—$12,000$12,000Feb 11, 2021, Open bid tab, 170567 ↗
Storm Water Pollution Prevention Inspectionsls1—$2,000$2,000Feb 11, 2021, Open bid tab, 170567 ↗
Topsoil Stockpiledcubic yard1—$5.51$5.51Feb 11, 2021, Open bid tab, 170567 ↗
Commercial Fertilizerton1—$987.00$987.00Feb 11, 2021, Open bid tab, 170567 ↗
Stump removed, 48 inch sizeeach1—$210.00$210.00Feb 11, 2021, Open bid tab, 170567 ↗
Stump removed, 30 inch sizeeach1—$160.00$160.00Feb 11, 2021, Open bid tab, 170567 ↗
Stump removed, 18 inch sizeeach1—$85.00$85.00Feb 11, 2021, Open bid tab, 170567 ↗
Tree removed, 48 inch sizeeach1—$460.00$460.00Feb 11, 2021, Open bid tab, 170567 ↗
Stormwater Pollution Prevention Inspection Softwarels1—$1,300$1,300Feb 11, 2021, Open bid tab, 170567 ↗
Tree Removed, 18 Inch Sizeeach1—$185.00$185.00Feb 11, 2021, Open bid tab, 170567 ↗
Tree Removed, 30 Inch Sizeeach1—$360.00$360.00Feb 11, 2021, Open bid tab, 170567 ↗
Fence Removedlinear foot1—$6.00$6.00Feb 11, 2021, Open bid tab, 170567 ↗
Embankment, As Per Plancubic yard1—$1.00$1.00Feb 11, 2021, Open bid tab, 170567 ↗
Manhole Abandonedeach1—$750.00$750.00Feb 11, 2021, Open bid tab, 170567 ↗
Soil Analysis Testeach1—$85.00$85.00Feb 11, 2021, Open bid tab, 170567 ↗
Placing Stockpiled Topsoilcubic yard1—$8.00$8.00Feb 11, 2021, Open bid tab, 170567 ↗
Manhole Removedeach1—$650.00$650.00Feb 11, 2021, Open bid tab, 170567 ↗
Construction Layout Stakes And Surveyingls1—$1,200$1,200Feb 11, 2021, Open bid tab, 170567 ↗
Excavation, As Per Plancubic yard1—$1.00$1.00Feb 11, 2021, Open bid tab, 170567 ↗
Stormwater Pollution Prevention Planls1—$7,500$7,500Feb 11, 2021, Open bid tab, 170567 ↗
Catch Basin Removedeach1—$650.00$650.00Feb 11, 2021, Open bid tab, 170567 ↗
Pipe removed, 24 inch and underlinear foot1—$3.30$3.30Feb 11, 2021, Open bid tab, 170567 ↗
Erosion Controleach1—$3.00$3.00Feb 11, 2021, Open bid tab, 170567 ↗
Maintaining Trafficls1—$1,400$1,400Feb 11, 2021, Open bid tab, 170567 ↗
Topsoil furnish and placedcubic yard1—$19.00$19.00Feb 11, 2021, Open bid tab, 170567 ↗
Waterthousand gallons1—$4,400$4,400Feb 11, 2021, Open bid tab, 170567 ↗
Mobilizationls1—$4,000$4,000Feb 11, 2021, Open bid tab, 170567 ↗
Clearing and Grubbingls1—$6,960$6,960Feb 11, 2021, Open bid tab, 170567 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.