| Mobilization | ls | 5,821 | — | $58,000 | $1.00 – $69,500,000 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Construction Layout | ls | 5,179 | $11,000 | $5,000 | $0.01 – $7,600,000 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Temporary sign and barricade | ls | 4,404 | — | $25,400 | $1.00 – $5,000,000 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Reflectorized Raised Pavement Markers | each | 4,101 | $6.00 | $150.00 | $0.05 – $500.00 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Temporary pavement marking (solid line)(4 inch width) | mile | 2,799 | — | $1,500 | $0.01 – $30,000 | Sep 24, 2026, Open bid tab, 4400036334 ↗ |
| Plastic pavement stripe (solid line) (4 inch width) (thermoplastic 90 mil) | mile | 2,671 | $4,000 | $19,200 | $1.00 – $475,000 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Temporary silt fence | linear foot | 2,434 | $2.25 | $5.50 | $0.01 – $60.00 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Temporary pavement marking (broken line)(4 inch width)(4' length) | mile | 2,418 | $300.00 | $1,500 | $0.01 – $20,000 | Sep 24, 2026, Open bid tab, 4400036334 ↗ |
| Temporary pavement marking (broken line)(4 inch width) (10' length) | mile | 2,370 | — | $700.00 | $0.01 – $75,000 | Sep 9, 2026, Open bid tab, H.009602.6 ↗ |
| Object Marker Assembly (Type 3) | each | 2,238 | $90.00 | $150.00 | $1.00 – $1,000 | Sep 9, 2026, Open bid tab, H.011603.6 ↗ |
| Plastic pavement stripe (broken line) (4 inch width) (thermoplastic 90 mil) | mile | 2,227 | $1,270 | $30,000 | $1.00 – $110,000 | Sep 24, 2026, Open bid tab, 4400036334 ↗ |
| Bedding Material | cubic yard | 2,145 | $100.00 | $175.00 | $0.01 – $2,800 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Mailboxes | each | 2,041 | — | $50.00 | $0.01 – $1,500 | Sep 9, 2026, Open bid tab, H.009602.6 ↗ |
| Borrow (Vehicular Measurement) | cubic yard | 2,039 | $22.00 | $45.00 | $0.01 – $1,400 | Sep 17, 2026, Open bid tab, 4400035774 ↗ |
| Mailbox Supports (Single) | each | 2,028 | $150.00 | $275.00 | $1.01 – $10,200 | Sep 9, 2026, Open bid tab, H.009602.6 ↗ |
| Aggregate Surface Course (Adjusted Vehicular Measurement) | cubic yard | 2,019 | $60.00 | $115.00 | $0.01 – $1,250 | Sep 17, 2026, Open bid tab, 4400035774 ↗ |
| Superpave asphalt concrete | ton | 1,988 | $90.00 | $135.00 | $35.84 – $2,465 | Apr 11, 2018, Open bid tab, H.009456.6 ↗ |
| Fertilizer | pound | 1,933 | $1.00 | $2.00 | $0.01 – $250.00 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Seeding | pound | 1,927 | $15.00 | $33.00 | $0.01 – $20,000 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Plastic pavement stripe (24 inch width) (thermoplastic 125 mil) | linear foot | 1,635 | $14.00 | $17.50 | $1.00 – $315.00 | Sep 15, 2026, Open bid tab, 4400036337 ↗ |
| Remove of guardrail | linear foot | 1,540 | $9.70 | $14.00 | $0.01 – $177.00 | Sep 9, 2026, Open bid tab, H.016377.6 ↗ |
| Remove of existing marking | mile | 1,494 | $6,000 | $5,000 | $0.01 – $470,400 | Sep 15, 2026, Open bid tab, 4400036337 ↗ |
| Asphalt Concrete | ton | 1,477 | $130.00 | $960.00 | $1.00 – $1,600 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Cold milling asphalt pavement | square yard | 1,428 | $2.20 | $8.00 | $0.01 – $212.80 | Apr 11, 2018, Open bid tab, H.009456.6 ↗ |
| Temporary pavement marking (24 inch width) | linear foot | 1,424 | $1.00 | $0.5 | $0.01 – $24.00 | Sep 9, 2026, Open bid tab, H.011603.6 ↗ |
| Pavement patch (12 inch minimum thick) | square yard | 1,411 | $100.00 | $100.00 | $1.00 – $1,400 | Sep 24, 2026, Open bid tab, H.017026.6 ↗ |
| Superpave asphalt concrete, drives, turnouts and miscellaneous | ton | 1,397 | $125.00 | $210.00 | $1.00 – $624.00 | Apr 11, 2018, Open bid tab, H.009456.6 ↗ |
| Guard Rail Transitions (Double Thrie Beam) | linear foot | 1,385 | $70.00 | $165.00 | $0.01 – $250.00 | Sep 9, 2026, Open bid tab, H.015544.6 ↗ |
| Temporary Sediment Check Dams (Hay) | each | 1,365 | $150.00 | $500.00 | $0.01 – $1,000 | Sep 9, 2026, Open bid tab, H.011603.6 ↗ |
| Hydro-seeding | acre | 1,362 | $2,500 | $3,000 | $0.01 – $350,000 | Sep 9, 2026, Open bid tab, H.009602.6 ↗ |
| Remove of concrete walks and drives | square yard | 1,343 | $18.00 | $50.00 | $0.1 – $830.00 | Sep 9, 2026, Open bid tab, H.011603.6 ↗ |
| Temporary sign & barricade | ls | 1,340 | — | $255,000 | $1.00 – $9,000,000 | Aug 19, 2009, Open the source page, project 742-07-0098 |
| Mulching (vegetative) | ton | 1,276 | $1,000 | $2,050 | $1.00 – $70,000 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Clearing and Grubbing | ls | 1,253 | — | $6,485 | $1.00 – $3,500,000 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Asphalt Concrete, Drives, Turnouts and Miscellaneous | ton | 1,246 | $175.00 | $360.00 | $1.00 – $5,900 | Sep 9, 2026, Open bid tab, H.009602.6 ↗ |
| Remove of structure and obstructions | ls | 1,228 | — | $8,000 | $1.00 – $750,000 | Sep 15, 2026, Open bid tab, 4400036338 ↗ |
| Contractor retained reclaimed asphalt pavement | cubic yard | 1,222 | — | $1.00 | $0.01 – $532.00 | Oct 11, 2017, Open bid tab, H.002747.6 ↗ |
| Geotextile Fabric | square yard | 1,222 | $3.00 | $4.00 | $0.01 – $150.00 | Sep 9, 2026, Open bid tab, H.009602.6 ↗ |
| Milling Asphalt Pavement | square yard | 1,218 | $3.80 | $17.00 | $0.01 – $1,341 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |
| Object Marker Assembly (Type 2) | each | 1,206 | $75.00 | $150.00 | $1.00 – $4,500 | Sep 25, 2026, Open bid tab, 4400036364R1 ↗ |