Skip to content
Hubstake

Agency · awarded bid prices

Koochiching County: awarded unit prices

462 winning bid prices read from 14 source documents, 2023–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Koochiching County

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Traffic Controlls25—$10,000$2,000 – $90,000Jun 1, 2026, Open bid tab, CP 2026-02 ↗
Mobilizationls25—$10,000$2,000 – $729,000Jun 1, 2026, Open bid tab, CP 2026-02 ↗
Type Sp 12.5 Wearing Course Mix (2,C)ton12$66.53$63.00$52.95 – $128.00Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
Maintenance & restoration of haul roadsls12—$1.00$1.00 – $99,000Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
Asphalt material for tack coatgallon12$3.05$3.00$2.70 – $10.00Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
Sawing bit pavement (full deep)linear foot11$4.75$2.10$2.10 – $10.00Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
Crack Repair Specialpound10$1.70$1.62$1.55 – $1.75Jun 1, 2026, Open bid tab, CP 2026-02 ↗
Aggregate Surfacing Class 1ton10$25.00$25.00$19.65 – $45.00Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
Seal asphalt pavement crackpound9$1.60$1.45$1.45 – $1.65Jun 1, 2026, Open bid tab, CP 2026-02 ↗
Milling asphalt surface (2.0 inch)square yard8$1.18$1.00$0.75 – $2.55Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
4 inch solid line multi complinear foot7$0.6$0.45$0.45 – $0.9Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
Excavation Commoncubic yard7$24.00$18.00$16.65 – $55.00Apr 14, 2025, Open bid tab, 2508 - SAP 036-608-0 ↗
4 inch broken line multi complinear foot5$0.45$0.45$0.15 – $0.9Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
Common Embankment (Cv)cubic yard5$13.00$6.50$6.50 – $38.25Apr 14, 2025, Open bid tab, 2508 - SAP 036-608-0 ↗
Aggregate Base (Cv) Class 5cubic yard5$48.00$40.00$40.00 – $51.50Apr 14, 2025, Open bid tab, 2508 - SAP 036-608-0 ↗
Turf Establishmentls5—$3,750$1,900 – $13,675Nov 26, 2024, Open bid tab, 2510 SAP 036-598-032 ↗
Erosion Control Supervisorls5$1,500$2,000$500.00 – $2,500Apr 14, 2025, Open bid tab, 2508 - SAP 036-608-0 ↗
Silt Fence, Type HIlinear foot4—$3.75$3.75 – $5.50Apr 14, 2025, Open bid tab, 2508 - SAP 036-608-0 ↗
4 inch dble solid line multi complinear foot4—$0.9$0.9 – $1.20Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
4 inch solid line multi comp gr inlinear foot4—$0.6$0.6 – $0.7Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
4 inch broken line multi comp gr inlinear foot4—$0.6$0.6 – $0.7Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
Random Riprap Class IIIcubic yard4—$90.00$75.00 – $90.00Nov 26, 2024, Open bid tab, 2510 SAP 036-598-032 ↗
Remove asphalt pavementsquare yard4—$5.80$3.40 – $5.80May 6, 2024, Open bid tab, 2445 - LOW SAP 036-6 ↗
12 inch solid line multi complinear foot3—$30.00$25.00 – $30.00Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
Select Granular Embankment (Cv)cubic yard3—$80.00$42.00 – $80.00Nov 26, 2024, Open bid tab, 2510 SAP 036-598-032 ↗
Rolled Erosion Prevention Category 20square yard3—$3.25$1.70 – $4.00Nov 26, 2024, Open bid tab, 2510 SAP 036-598-032 ↗
Motor Graderhour3—$215.00$215.00 – $300.00Apr 14, 2025, Open bid tab, 2508 - SAP 036-608-0 ↗
Coarse Aggregate Bedding (cv)cubic yard3—$55.00$55.00 – $67.00Apr 14, 2025, Open bid tab, 2508 - SAP 036-608-0 ↗
Geotextile Fabric Type 6square yard3—$7.00$4.25 – $7.00May 6, 2024, Open bid tab, 2445 - LOW SAP 036-6 ↗
Remove Curb & Gutterlinear foot3—$15.00$5.00 – $15.00May 6, 2024, Open bid tab, 2445 - LOW SAP 036-6 ↗
Storm Drain Inlet Protectioneach3—$210.00$202.00 – $210.00May 6, 2024, Open bid tab, 2445 - LOW SAP 036-6 ↗
Remove Signeach3—$125.00$27.00 – $125.00Nov 26, 2024, Open bid tab, 2510 SAP 036-598-032 ↗
Full deep reclamationsquare yard3—$1.95$0.86 – $1.95Aug 25, 2025, Open bid tab, 2524 - SAP 036-624-0 ↗
Clearing & Grubbingls3—$15,000$9,000 – $15,000Nov 26, 2024, Open bid tab, 2510 SAP 036-598-032 ↗
Dewateringls3—$11,000$5,500 – $11,000Nov 26, 2024, Open bid tab, 2510 SAP 036-598-032 ↗
16x10 precast concrete box culvert end sectioneach2—$31,000$31,000Apr 9, 2024, Open bid tab, 2483 - SAP 036-599-0 ↗
Aggregate Surfacing (cv) Class 5cubic yard2—$118.00$65.00 – $118.00Nov 26, 2024, Open bid tab, 2510 SAP 036-598-032 ↗
Seed Mixture 25-141pound2—$7.25$6.50 – $7.25Apr 14, 2025, Open bid tab, 2508 - SAP 036-608-0 ↗
4 inch precast concrete headwalleach2—$900.00$530.00 – $900.00Apr 14, 2025, Open bid tab, 2508 - SAP 036-608-0 ↗
Sawing asphalt pavementlinear foot2—$8.50$8.50May 6, 2024, Open bid tab, 2445 - LOW SAP 036-6 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Minnesota: statewide figures.