| Traffic Control | ls | 35 | $3,325 | $2,100 | $400.00 – $50,000 | Sep 21, 2026, Open bid tab, 2606 ↗ |
| Mobilization | ls | 35 | $25,000 | $9,750 | $4,000 – $135,000 | Sep 21, 2026, Open bid tab, 2606 ↗ |
| Aggregate Base Class 5 | ton | 12 | $29.50 | $28.00 | $22.00 – $50.00 | Sep 21, 2026, Open bid tab, 2606 ↗ |
| Type Sp 9.5 Wearing Course Mix (3,B) | ton | 11 | $93.00 | $83.00 | $77.50 – $500.00 | Sep 2, 2026, Open bid tab, 2603 ↗ |
| Rolled Erosion Prevention Category 20 | square yard | 10 | $1.71 | $1.73 | $1.65 – $3.00 | Aug 8, 2025, Open bid tab, Project: SAP 032-629-048 ↗ |
| Remove Existing Bridge | ls | 10 | — | $7,500 | $4,500 – $65,000 | Sep 21, 2026, Open bid tab, 2606 ↗ |
| Bitumninous Material For Tack Coat | gallon | 9 | — | $0.01 | $0.01 – $4.00 | Jul 1, 2025, Open bid tab, 2503 ↗ |
| Geotextile Filter Type 7 | square yard | 9 | $3.00 | $3.00 | $3.00 – $5.00 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Silt Fence, Type MS | linear foot | 9 | $2.10 | $3.50 | $2.00 – $3.50 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Type SP 12.5 NON Wearing Course Mixture (3,C) | ton | 8 | $88.24 | $134.00 | $71.70 – $134.00 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Rapid Stabilization Method 4 | square yard | 8 | $2.38 | $2.25 | $1.60 – $3.50 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Common Embankment (Cv) | cubic yard | 8 | $16.50 | $40.00 | $1.45 – $41.00 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Excavation Common | cubic yard | 8 | $8.00 | $15.00 | $4.85 – $15.00 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Random Riprap Class III w/ Geotextile Fabric | ton | 7 | $58.00 | $58.00 | $54.00 – $105.00 | May 17, 2024, Open bid tab, 24-4 ↗ |
| Turf Establishment | acre | 7 | $2,800 | $10,000 | $0.01 – $10,000 | May 17, 2024, Open bid tab, 24-4 ↗ |
| Sediment Control LOG Type Rock | linear foot | 7 | $4.00 | $5.00 | $3.40 – $5.00 | May 17, 2024, Open bid tab, 24-4 ↗ |
| Silt Fence, Type Pa | linear foot | 7 | $3.00 | $3.00 | $2.50 – $3.00 | May 17, 2024, Open bid tab, 24-4 ↗ |
| Random Riprap Class V | ton | 7 | $55.00 | $55.00 | $52.00 – $60.00 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Flotation Silt Curtain Type Moving Water | linear foot | 7 | $16.00 | $21.00 | $11.50 – $40.00 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Milling asphalt surface (1.5 inch) | square yard | 7 | $1.65 | $1.02 | $0.87 – $2.50 | Jun 10, 2025, Open bid tab, 2502 ↗ |
| Salvage aggregate shoulder | square yard | 6 | $6.00 | $1.00 | $1.00 – $12.15 | Sep 2, 2026, Open bid tab, 2603 ↗ |
| Pile points 12 inch | each | 6 | $350.00 | $400.00 | $350.00 – $425.00 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Structure steel (3306) | pound | 6 | $10.00 | $8.00 | $8.00 – $11.00 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Slope Preparation | ls | 6 | $6,750 | $2,500 | $2,500 – $7,500 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Pile points 16 inch | each | 6 | $450.00 | $550.00 | $450.00 – $550.00 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Adjust Frame & Ring Casting | each | 6 | $230.00 | $570.00 | $230.00 – $570.00 | Mar 24, 2023, Open bid tab, SAP 032-614-05 etal ↗ |
| Remove asphalt pavement | square yard | 6 | $6.00 | $8.00 | $4.00 – $12.00 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Structure Excavation | ls | 6 | $14,500 | $15,000 | $12,000 – $19,000 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| Granular Bedding | ton | 5 | $38.00 | $20.00 | $20.00 – $42.00 | Jan 20, 2023, Open bid tab, SAP 032-599-090 & SA ↗ |
| Type sp 9.5 wear course mix (3,b) | ton | 5 | $74.00 | $73.25 | $71.82 – $235.00 | Jul 1, 2025, Open bid tab, 2503 ↗ |
| Aggregate Surfacing Class 5 | ton | 5 | $40.00 | $42.00 | $40.00 – $45.00 | Sep 2, 2026, Open bid tab, 2604 ↗ |
| Sediment Control Log Type Wood Fiber | linear foot | 5 | $3.00 | $3.98 | $2.00 – $3.98 | Sep 2, 2026, Open bid tab, 2604 ↗ |
| Asphalt material for tack coat | gallon | 5 | $0.01 | $0.01 | $0.01 – $2.80 | Sep 2, 2026, Open bid tab, 2603 ↗ |
| Salvage Aggregate Base | square yard | 4 | — | $3.50 | $1.00 – $3.50 | Jan 20, 2023, Open bid tab, SAP 032-599-090 & SA ↗ |
| Hardware | pound | 4 | — | $10.00 | $8.00 – $10.00 | Sep 2, 2026, Open bid tab, 2604 ↗ |
| Timber rail | linear foot | 4 | — | $145.00 | $145.00 – $225.00 | Sep 2, 2026, Open bid tab, 2604 ↗ |
| Type Sp 9.5 Wearing Course Mix (2,B) | ton | 4 | — | $125.00 | $125.00 – $204.00 | May 13, 2025, Open bid tab, 2501 ↗ |
| Aggregate Shouldering | linear foot | 4 | — | $1.00 | $0.78 – $1.25 | Sep 2, 2026, Open bid tab, 2603 ↗ |
| Sediment Control Log Type Straw | linear foot | 4 | — | $3.75 | $3.25 – $3.75 | Sep 9, 2026, Open bid tab, 2605 ↗ |
| C-i-p concrete piling 12 inch | linear foot | 4 | — | $50.00 | $44.00 – $51.00 | Sep 9, 2026, Open bid tab, 2605 ↗ |