ITD: awarded unit prices

4,558 winning bid prices read from 126 source documents, 2024–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › ITD

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Mobilizationls115—$73,985$2,400 – $5,171,825Oct 27, 2026, line 210 ↗
Longitudinal Pavement Marking - Waterbornelinear foot71$0.2$0.85$0.1 – $3.50Oct 27, 2026, line 165 ↗
Temporary traffic control signsquare foot60$7.00$11.50$1.10 – $58.00Oct 20, 2026, line 270 ↗
Partneringca60$1.00$1.00$1.00 – $5,000Oct 20, 2026, line 5 ↗
Miscellaneous Temporary Traffic Control Itemsca58$1.00$1.00$1.00Oct 27, 2026, line 155 ↗
Water AND Pollutionca56$1.00$1.00$1.00Oct 20, 2026, line 80 ↗
Surveyls54$33,600$40,000$2,500 – $2,035,000Oct 27, 2026, line 175 ↗
Survey Monument Preservationca53$1.00$1.00$1.00Oct 27, 2026, line 5 ↗
Temporary Traffic Control Maintenancehour52$60.00$1.00$0.01 – $130.00Oct 20, 2026, line 285 ↗
Drumseach51$11.00$39.00$2.10 – $60.00Oct 6, 2026, line 90 ↗
CSS-1 Diluted Emulsified Asphalt FOR Tack Coatgallon51$3.30$4.00$0.01 – $45.00Oct 20, 2026, line 100 ↗
Directed Surveyingca44$1.00$1.00$1.00Oct 27, 2026, line 180 ↗
Portable Changeable Message Sign (pcms)day44$65.85$75.00$1.00 – $300.00Oct 6, 2026, line 125 ↗
Excavationcubic yard44$19.10$20.00$2.86 – $50.50Oct 27, 2026, line 30 ↗
Weighted Base Tubular Markerseach43$7.50$13.50$1.05 – $100.00Oct 6, 2026, line 155 ↗
Flagger Controlhour40$58.38$53.00$1.00 – $108.00Oct 6, 2026, line 140 ↗
3/4 inch aggregate type b for baseton40$32.95$31.00$1.00 – $65.00Oct 27, 2026, line 50 ↗
Record Drawingsls38$2,000$1,800$100.00 – $10,000Oct 27, 2026, line 185 ↗
Barricade Type 3each38$61.25$40.00$28.50 – $600.00Oct 20, 2026, line 275 ↗
Fiber Wattlelinear foot35$3.75$4.50$2.35 – $16.30Oct 27, 2026, line 40 ↗
SP Temporary Traffic Controlls33—$30,000$2,650 – $675,000Oct 27, 2026, line 195 ↗
Remove of signeach33$150.00$180.00$70.00 – $463.00Oct 27, 2026, line 15 ↗
Transverse, word, symbol, and arrow pavement marking - preformed thermoplasticsquare foot31$13.00$19.00$3.90 – $22.00Oct 27, 2026, line 160 ↗
Inlet Protectioneach31$100.00$180.00$35.00 – $300.00Oct 6, 2026, line 30 ↗
Contingency Amount Miscellaneous Workca30$1.00$1.00$1.00Oct 27, 2026, line 190 ↗
Superpave hot mix asphalt pavement including asphalt & additives class sp-3ton29$145.00$145.00$75.00 – $700.00Oct 20, 2026, line 110 ↗
Approacheach29$2,160$2,160$233.00 – $13,000Oct 27, 2026, line 55 ↗
Cold Millingsquare yard28$4.08$28.00$1.27 – $85.00Oct 20, 2026, line 50 ↗
Sign Type B-1square foot28$33.50$34.00$18.50 – $128.50Oct 27, 2026, line 95 ↗
Water FOR Dust Abatementthousand gallons27—$1.00$0.01 – $160.00Oct 20, 2026, line 50 ↗
W-beam Guardraillinear foot25$28.00$43.00$20.00 – $60.00Oct 27, 2026, line 80 ↗
Record and reestablish pavement markingls21—$1,200$400.00 – $72,000Oct 20, 2026, line 185 ↗
Granular Subbaseton21$24.00$24.00$11.00 – $250.00Oct 20, 2026, line 90 ↗
Adjust Manhole Coverseach21$1,140$2,450$400.00 – $2,725Aug 18, 2026, line 250 ↗
Seed BED Preparationacre20—$7,190$513.00 – $25,000Oct 27, 2026, line 125 ↗
Remove of guardraillinear foot20$2.33$1.25$1.25 – $18.00Oct 20, 2026, line 15 ↗
Remove of curb & gutterlinear foot20$5.00$6.45$3.00 – $45.05Aug 18, 2026, line 65 ↗
Adjust Valve Coverseach19$900.00$1,675$255.00 – $1,845Aug 18, 2026, line 255 ↗
Selective remove of tree including stumpseach19$690.00$550.00$476.00 – $5,000Aug 18, 2026, line 30 ↗
Remove of concrete sidewalksquare yard19$16.00$6.25$5.00 – $93.90Aug 18, 2026, line 55 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.