| Mobilization | ls | 7,782 | — | $143,477 | $0.01 – $29,700,000 | Sep 18, 2026, Open bid tab, 74B73 ↗ |
| Bit Matls Tack Ct | pound | 4,017 | — | $7.93 | $0.01 – $176.00 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Shrt trm pavement mk remove | square foot | 3,307 | — | $3.06 | $0.01 – $500.00 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Short terminal pavement mking | linear foot | 3,172 | — | $0.01 | $0.01 – $71.76 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Changeable message sign | cal da | 3,147 | $65.00 | $241.33 | $0.01 – $1,737 | Sep 18, 2026, Open bid tab, 74B73 ↗ |
| Earth Excavation | cubic yard | 2,856 | $40.00 | $77.45 | $0.01 – $2,500 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Raised reflective pavement mkr | each | 2,730 | $42.00 | $477.77 | $0.01 – $3,900 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Raised ref pvt mk remove | each | 2,656 | $12.98 | $12.22 | $0.01 – $772.69 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Protective Coat | square yard | 2,485 | $1.85 | $3.38 | $0.01 – $800.23 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Engr Field Office A | cal mo | 2,347 | $2,500 | $1,500 | $0.01 – $10,500 | Sep 18, 2026, Open bid tab, 62W73 ↗ |
| Construction Layout | ls | 2,243 | $14,160 | $65,000 | $0.01 – $3,286,800 | Sep 18, 2026, Open bid tab, 64T43 ↗ |
| Hot mix asphalt surface remove butt joint | square yard | 2,234 | $14.18 | $0.01 | $0.01 – $750.00 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Traffic control & protection spl | ls | 2,233 | — | $55,000 | $0.01 – $5,371,600 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Thpl Pvt Mk Line 4 | linear foot | 2,200 | $0.8 | $0.8 | $0.2 – $115.00 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Temporary info signing | square foot | 2,153 | $20.00 | $20.00 | $0.01 – $287.90 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Nitrogen Fert Nutr | pound | 2,130 | $3.00 | $4.00 | $0.01 – $290.00 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Potassium Fert Nutr | pound | 2,126 | $3.00 | $4.00 | $0.01 – $290.00 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Long joint seal | linear foot | 2,076 | $2.90 | $29.03 | $0.01 – $210.00 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Sidewalk remove | square foot | 2,024 | $3.00 | $3.00 | $0.01 – $109.00 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Thpl Pvt Mk Line 12 | linear foot | 1,958 | $3.00 | $3.00 | $0.01 – $220.00 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Thpl Pvt Mk Line 24 | linear foot | 1,917 | $6.00 | $5.75 | $2.00 – $310.00 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Perimeter erosion bar | linear foot | 1,865 | $3.30 | $2.75 | $0.01 – $55.00 | Sep 18, 2026, Open bid tab, 61L85 ↗ |
| Pavement remove | square yard | 1,860 | $18.50 | $50.65 | $0.01 – $950.00 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Thpl Pvt Mk Line 6 | linear foot | 1,844 | $1.25 | $0.77 | $0.01 – $150.13 | Sep 18, 2026, Open bid tab, 76W01 ↗ |
| Detectable Warnings | square foot | 1,828 | $35.00 | $20.45 | $0.01 – $170.00 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Thpl pvt mk ltr & symbol | square foot | 1,793 | $5.50 | $5.00 | $0.01 – $168.00 | Sep 18, 2026, Open bid tab, 62V55 ↗ |
| Temporary erosion control seed | pound | 1,791 | $4.40 | $4.15 | $0.01 – $200.00 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Non Spl Waste Disposl | cubic yard | 1,769 | $88.00 | $156.35 | $0.01 – $1,700 | Sep 18, 2026, Open bid tab, 74B73 ↗ |
| Soil Disposal Analy | each | 1,765 | $1,475 | $1,150 | $0.01 – $10,800 | Sep 18, 2026, Open bid tab, 74B73 ↗ |
| Combination curb gutter remove | linear foot | 1,762 | $10.75 | $8.20 | $0.02 – $239.89 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Reinforced bars, epoxy ctd | pound | 1,729 | $2.20 | $1.85 | $0.01 – $275.00 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Traffic control-protection 701201 | ls | 1,711 | — | $23,462 | $0.01 – $518,833 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Phosphorus Fert Nutr | pound | 1,642 | $3.00 | $4.00 | $0.01 – $290.00 | Sep 18, 2026, Open bid tab, 62V85 ↗ |
| Temporary Ramp | square yard | 1,631 | $17.15 | $30.00 | $0.01 – $252.38 | Sep 18, 2026, Open bid tab, 64T43 ↗ |
| Reg sub p-construction plan | ls | 1,625 | $3,000 | $2,200 | $0.01 – $48,300 | Sep 18, 2026, Open bid tab, 74B73 ↗ |
| Reg Sub F Con Report | ls | 1,622 | $2,000 | $2,200 | $0.01 – $12,500 | Sep 18, 2026, Open bid tab, 74B73 ↗ |
| Guardrail remove | linear foot | 1,570 | $7.44 | $5.80 | $0.01 – $175.00 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Terminal Marker - Da | each | 1,517 | $42.53 | $52.79 | $6.00 – $2,100 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Tr Bar Trm T1 Spl Tan | each | 1,508 | $3,570 | $4,434 | $41.50 – $11,361 | Sep 18, 2026, Open bid tab, 74650 ↗ |
| Sign Panel T1 | square foot | 1,470 | $30.00 | $40.00 | $0.01 – $450.00 | Sep 18, 2026, Open bid tab, 62W73 ↗ |