| Catch Basin Removed | each | 2 | — | $214.61 | $214.61 – $400.00 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Pipe removed, 24 inch and under | linear foot | 2 | — | $9.68 | $5.00 – $9.68 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Erosion Control | each | 2 | — | $1.00 | $1.00 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Low Strength Mortar Backfill | cubic yard | 2 | — | $127.45 | $127.45 – $195.00 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Curb Removed | linear foot | 2 | — | $2.47 | $2.47 – $4.00 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 2 | — | $14,015 | $500.00 – $14,015 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Maintaining Traffic | ls | 2 | — | $47,795 | $4,000 – $47,795 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 2 | — | $86.62 | $30.00 – $86.62 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Walk Removed | square foot | 2 | — | $1.02 | $1.02 – $1.50 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Removed, As Per Plan | ls | 2 | — | $42,796 | $500.00 – $42,796 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Water Service Branch, As Per Plan | linear foot | 1 | — | $27.06 | $27.06 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Remove of ground mounted post | each | 1 | — | $58.44 | $58.44 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Remove of ground mount sign and reerection | each | 1 | — | $58.44 | $58.44 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| 6 inch storm sewer lateral, pvc sdr-35 | linear foot | 1 | — | $71.44 | $71.44 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| 24 inch cpslp storm sewer | linear foot | 1 | — | $96.00 | $96.00 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| 1-3/4 inch asphalt concrete intermediate course, type 2, pg 64-22 (449) | cubic yard | 1 | — | $249.00 | $249.00 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Storm Storage Vault Removed, As Per Plan | ls | 1 | — | $2,480 | $2,480 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| 6 inch conduit, type b, 707.45, storm lateral | linear foot | 1 | — | $20.00 | $20.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| Concrete Walk Replaced, In Kind | square foot | 1 | — | $10.00 | $10.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| Type 2 Storm Cleanout | each | 1 | — | $140.24 | $140.24 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| 1-1/4 inch asphalt concrete surface course, type 1, (449) | cubic yard | 1 | — | $311.26 | $311.26 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| 9 inch asphalt concrete base, pg64-22 | cubic yard | 1 | — | $300.00 | $300.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| Type 6 Barrier Curb | linear foot | 1 | — | $15.37 | $15.37 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| 10 inch storm sewer, as per plan | linear foot | 1 | — | $100.00 | $100.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| Type 2 Storm Cleanout, As Per Plan | each | 1 | — | $100.00 | $100.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| Non-Tracking Tack Coat, 0.09 Gal/S.Y. | gallon | 1 | — | $4.00 | $4.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| 15 inch cpslp storm sewer | linear foot | 1 | — | $60.36 | $60.36 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| 12 inch cpslp storm sewer | linear foot | 1 | — | $52.20 | $52.20 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Type 2-3 Catch Basin | each | 1 | — | $1,250 | $1,250 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| 15 inch cpslp storm sewer, as per plan | linear foot | 1 | — | $55.00 | $55.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| 30 inch cpslp storm sewer, as per plan | linear foot | 1 | — | $95.00 | $95.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| 24 inch cpslp storm sewer, as per plan | linear foot | 1 | — | $75.00 | $75.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| 18 inch cpslp storm sewer, as per plan | linear foot | 1 | — | $60.00 | $60.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| 12 inch cpslp storm sewer, as per plan | linear foot | 1 | — | $45.00 | $45.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| Type 3 Storm Sewer Manhole, As Per Plan | each | 1 | — | $1,400 | $1,400 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| Yard Drain, As Per Plan | each | 1 | — | $150.00 | $150.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| Type 2-2B Catch Basin, As Per Plan | each | 1 | — | $850.00 | $850.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| Concrete Curb Ramp | square foot | 1 | — | $7.69 | $7.69 | Apr 21, 2022, Open bid tab, bidtabharken2101pdf ↗ |
| Asphalt Concrete Surface Course, Type 1, Pg. 64-22 (448) | cubic yard | 1 | — | $325.00 | $325.00 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |
| 8 inch storm sewer, as per plan | linear foot | 1 | — | $43.50 | $43.50 | Jun 30, 2020, Open bid tab, bidtabharfor1902pdf ↗ |