| GABION BASKETS (3' x 3' x 6') | each | 1 | — | $430.00 | $430.00 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Geogrid For Subgrade Stabilization | square yard | 1 | — | $3.00 | $3.00 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Limestone Screening | cubic yard | 1 | — | $90.00 | $90.00 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| #57 Backfill | cubic yard | 1 | — | $49.50 | $49.50 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Erosion Control Blanket Type B Roll | square foot | 1 | — | $0.6 | $0.6 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Fence, Type Split Rail | linear foot | 1 | — | $17.25 | $17.25 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Flexamat Erosion Control | square yard | 1 | — | $75.00 | $75.00 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Type A Rip Rap | cubic yard | 1 | — | $135.00 | $135.00 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Excavation, As Per Plan (Bringing Trail Down To Meet Relocated Trail) | cubic yard | 1 | — | $7.30 | $7.30 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Manhole, No. 3 | each | 1 | — | $4,000 | $4,000 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| 15 inch conduit, type b, as per plan | linear foot | 1 | — | $87.50 | $87.50 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Seeding And Mulching, As Per Plan | square yard | 1 | — | $1.00 | $1.00 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Type 2-2B Catch Basin | each | 1 | — | $1,750 | $1,750 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 1 | — | $21,940 | $21,940 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| 12 inch conduit, type b, as per plan | linear foot | 1 | — | $30.00 | $30.00 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Removed, As Per Plan | ls | 1 | — | $2,400 | $2,400 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |
| Live Stakes | each | 1 | — | $5.00 | $5.00 | Aug 6, 2019, Open bid tab, bidtabcwpdpdf ↗ |