Agency · awarded bid prices

DeKalb County Highway Department: awarded unit prices

191 winning bid prices read from 45 source documents, 2022–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › DeKalb County Highway Department

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Glass Beadspound8$0.475$0.44$0.33 – $5.00Mar 26, 2026, Bid tabulation p. 1
Aggregate surface course, ca-6, type bton8$13.73$6.50$6.50 – $17.00May 6, 2026, Bid tabulation p. 1
Aggregate Surface Course, CA-6, Type Bton7$13.34$13.34$10.05 – $17.90Mar 1, 2023, Bid tabulation p. 1
Pipe culvert, type 1, 15 inchlinear foot6$18.96$18.96$18.96Mar 1, 2023, Bid tabulation p. 1
Bit material (seal coat)ton6$756.00$730.00$720.00 – $905.00Mar 26, 2026, Bid tabulation p. 1
Aggregate (seal Coat)ton6$38.50$39.00$30.00 – $57.00Mar 26, 2026, Bid tabulation p. 1
Hot mix asphalt sc, il-9.5, mix c, n50ton4—$120.29$75.75 – $120.29Apr 5, 2023, Bid tabulation p. 1
Hot mix asphalt sc, il-9.5, c, n50 ston4—$80.00$78.75 – $91.00Mar 26, 2026, Bid tabulation p. 1
Bit material (tack coat)pound4—$1.00$0.01 – $1.00Mar 26, 2026, Bid tabulation p. 1
Hot mix asphalt surface remove butt jointsquare yard4—$12.50$7.50 – $12.50Mar 26, 2026, Bid tabulation p. 1
Bit Materials (Tack Coat)pound3—$0.01$0.01 – $0.5Apr 5, 2023, Bid tabulation p. 1
Hot mix asphalt surface remvl (butt joint)square yard3—$22.00$10.00 – $22.00Mar 31, 2025, Bid tabulation p. 1
Yellow Latex Traffic Paintgallon3—$20.25$20.25 – $250.00Mar 31, 2025, Bid tabulation p. 1
Pipe culvert, type 1, 18 inchlinear foot3—$33.26$27.90 – $33.26Mar 6, 2025, Bid tabulation p. 1
Aggregate shoulder, type bton3—$36.00$35.00 – $56.50Mar 26, 2026, Bid tabulation p. 1
Paint pavement marking line, 4 inchlinear foot3—$0.55$0.25 – $0.55Mar 26, 2026, Bid tabulation p. 1
Rejuvenator-Reclamitesquare yard3—$1.27$1.12 – $1.27Mar 26, 2026, Bid tabulation p. 1
Bit material (fog coat)square yard3—$0.55$0.52 – $0.61Mar 26, 2026, Bid tabulation p. 1
Traffic Control Completels3—$1,500$1,500 – $15,900Sep 24, 2026, Bid tabulation p. 1
Bit Matls (Tack Coat)pound3—$0.01$0.01 – $1.00Mar 31, 2025, Bid tabulation p. 1
Pc, type 1, 15 inch connecting bandeach2—$37.92$37.92Mar 1, 2023, Bid tabulation p. 1
Pipe culvert, type 1, 30 inchlinear foot2—$46.50$46.50Mar 1, 2023, Bid tabulation p. 1
Hot mix asphalt surface remove (buttsquare yard2—$11.26$11.26 – $17.00Apr 5, 2023, Bid tabulation p. 1
Hot mix asphalt sc,il 9.5,mix c,n50spton2—$130.00$81.00 – $130.00Mar 31, 2025, Bid tabulation p. 1
Paint pvt marking, line 4 inchlinear foot2—$0.25$0.25 – $4.40Mar 31, 2025, Bid tabulation p. 1
White Latex Traffic Paintgallon2—$20.25$20.25 – $22.00Mar 31, 2025, Bid tabulation p. 1
Aggregate (Prime Coat)ton2—$1.00$1.00Mar 31, 2025, Bid tabulation p. 1
Bit material (prime coatton2—$1,246$1,246 – $1,390Mar 31, 2025, Bid tabulation p. 1
Preparation of basesquare yard2—$0.85$0.85 – $1.10Mar 31, 2025, Bid tabulation p. 1
Pipe culvert, type 1, 36 inchlinear foot2—$68.54$55.80 – $68.54Mar 6, 2025, Bid tabulation p. 1
pre-wet tank system as specifiedeach2—$188,326$168,315 – $188,326Jan 29, 2026, Bid tabulation p. 1
Hot mix asphalt sc, il-9.5, c, n50, spton2—$138.85$101.00 – $138.85Mar 26, 2026, Bid tabulation p. 1
Aggregate (CA-16)ton2—$31.85$31.05 – $31.85Mar 26, 2026, Bid tabulation p. 1
Asphalt materials course-2 furnish &gallon2—$9.49$9.30 – $9.49Mar 26, 2026, Bid tabulation p. 1
Aggregate shoulder, type bton2—$73.83$38.00 – $73.83Mar 26, 2026, Bid tabulation p. 1
Manhole adjusteach2—$300.00$300.00 – $950.00Mar 26, 2026, Bid tabulation p. 1
One Ton w/11's stainlesseach1—$53,110$53,110Oct 29, 2026, Bid tabulation p. 1
Whilte Latex Traffic Marking Paintgallon1—$21.86$21.86Apr 6, 2022, Bid tabulation p. 1
Yellow Latex Traffic Marking Paintgallon1—$21.86$21.86Apr 6, 2022, Bid tabulation p. 1
Pipe culvert, type 1, 36 inch connecting bandeach1—$111.60$111.60Mar 1, 2023, Bid tabulation p. 1

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Illinois: statewide figures.